01:03 25 Oct 22
CERs cancelled through the CDM registry regular process: from 16 November 2018 onwards
Cancellations that took place in the CDM Registry between 1 January 2018 and 16 November 2018 can be found here
Cancellations that took place in the CDM Registry earlier than 2018 can be found here
Please note that the reasons for cancellation are provided by the project participant and are under their sole responsibility.
Cancellations that took place in the CDM Registry earlier than 2018 can be found here
Please note that the reasons for cancellation are provided by the project participant and are under their sole responsibility.
| Project/POA number | Project name | Project type | Host country | Quantity of units cancelled | Unit type | Reason/ Beneficiary | Date of completion | Link to the attestation |
|---|---|---|---|---|---|---|---|---|
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,380 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EUROMOBILIA S.A. para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 02/09/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “ATAL Engineering Limited” for Annual Dinner in 2021 (Transaction ID: 691) | 18/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Dr Fiona TSUI” for Annual Dinner in 2021 (Transaction ID: 717) | 18/02/2021 | Attestation letter |
| 9297 | Sinner wind power project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 20,614 | CERs | Jera Global Markets | 12/07/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 7 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 29 556,00 kms of riders using UberPLANET during January 2022 made by Anaconda Carbon. | 07/03/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mr Jack Cheng” for Annual Dinner in 2021 (Transaction ID: 745) | 22/02/2021 | Attestation letter |
| 3870 | 37.95 MW Wind power project in Bharmasagar, Karnataka by BPEIPL | Energy industries (renewable - / non-renewable sources) | India | 291,615 | CERs | Retired on behalf of Takeda Pharmaceutical Company Limited | 06/09/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,997 | CERs | 2019-0992 | 2020 | 09/11/2020 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 8,943 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of MRV ENGENHARIA E PARTIPAÇÕES SA to offset CO2 emissions related to the reported GHG Emissions from 2021. | 26/09/2022 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 40,500 | CERs | Retired on behalf of ClimatePartner‘s client #13710 | 15/10/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action TR 17 | 22/12/2020 | Attestation letter |
| 5342 | African Improved Cooking Stoves Programme of Activities | Energy demand | Ghana, Nigeria, Liberia | 4,765 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. Is beneficiary of this cancellation. | 27/10/2021 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 1,600 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by Anaconda Carbon | 22/02/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Evento Bestinver Best Value 2019 | 07/04/2020 | Attestation letter |
| 1575 | Kadamane Mini Hydel Scheme-1 (KMHS-1) | Energy industries (renewable - / non-renewable sources) | India | 24,783 | CERs | Voluntary carbon offsetting - transaction no. CE-202208602 | 29/08/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 31 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis Porto Real - Processo Virabrequim. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 2 | tCERs | Agnaldo Juarez Pereira Compensação de pegada de carbono. | 14/10/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | Ivano Valença Westin | 03/12/2020 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 11,331 | CERs | Not shared | 27/03/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,467 | CERs | Retiro a favor de WORLD FUEL SERVICES identificado con NIT 830112215-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 2.467. Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 18 | CERs | Retired in the name of 667 Technology GmbH / Planetly | 24/07/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 35 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Amura Centro Culinario para compensar las emisiones GEI generadas por sus operaciones en Costa Rica durante el periodo 2021. | 17/06/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Junta de Accionistas ACCIONA 2020 | 30/07/2021 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 31,278 | CERs | Cancelled on behalf of the Foundation "Zukunft des Kohlenstoffmarktes" | 12/08/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,310 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Airport | 11/05/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,905 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by GMOVIL NIT 90036470-4, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 4720 | Nam Phang hydropower project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 403,903 | CERs | To compensate Jetblue Airway's 2022 Domestic Emissions | 05/05/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Dr. Ranjan Banerjee Dean, SPJIMR. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Nilesh Shah Managing Director, Kotak AMC Ltd. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. N Mohan (Director IMA). EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 75,000 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients. | 07/01/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 47 | CERs | Retirement – Beneficiary: AROMAS Y SABORES TÉCNICOS S. A. ; Retirement Reason Details: Cancelación voluntaria hecha por AROMAS Y SABORES TÉCNICOS S.A. para su estrategia de reducción de emisiones para el Programa de Carbono Neutralidad 2.0 de Costa Rica de sus emisiones del 1 de enero al 31 de diciembre del 2019 | 03/04/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 19,883 | CERs | Retired for Cool Effect on Behalf of Williams College | 01/02/2022 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 23 | CERs | CO2-neutraler Erdgasbezug für die Objekte des OMEGA-Portfolios der Peakside Capital Advisory GmbH im Lieferjahr 2020 | 08/12/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | Reunión de Directivos ACCIONA 2020 | 05/02/2021 | Attestation letter |
| 0427 | Electricity generation at 8 MW captive power plant using enthalpy of flue gases from blast furnace operations of Kalyani Steels Limited, in Karnataka state of India. | Energy industries (renewable - / non-renewable sources) | India | 21 | CERs | Saarloha Advanced Materials Private Limited (Saarloha), a Kalyani Group Company, is manufacturer of Engineering Grade Steel with low carbon/ GHG (Scope 1 and 2) footprint than normal BAU steel making (referred as Green Steel as defined by Saarloha) under the brand name “K” and “K plus”. In order to achieve Carbon Neutrality for steel produced (101 MT) during Financial 2022-23 under brand name “K plus” (i.e. steel having zero residual Scope 1 and zero Scope 2 emission at manufacturing premises - gate to gate), Saarloha has opted to offset its residual GHG footprint by purchase and voluntary cancellation of 21 CERs equivalent to 21 tonne(s) of CO2.” for 101 MT of Steel manufactured thru EAF route. | 15/09/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 870 | CERs | Beneficiario: SIG Combibloc México Purpose: El presente certificado acredita la compensación de 870 toneladas de CO2 equivalente correspondientes a las emisiones directas generadas por las operaciones durante el año 2019 | 15/10/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 440 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 1,754.841 kms of riders using UberECO during January 2020 made by A-CO2 | 12/02/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action - TR 41 | 22/12/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 2,300 | CERs | Aposentadoria em nome da IBRATEC para a neutralização das emissões dos escopos 1-2-3 do ano de 2020. | 28/07/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 350 | CERs | Retirement Beneficiary : BIO FOOD PRODUCTS LIMITED, Reason - I want to contribute to Climate Action. | 15/04/2021 | Attestation letter |
| 0085 | Hapugastenne and Hulu Ganga Small Hydropower Projects. | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 59,609 | CERs | Voluntary cancellation on behalf of Natural Capital partners' client. | 09/05/2019 | Attestation letter |
| 3611 | Roaring 40’s Wind Farms (Khandke) Private Limited – Phase III | Energy industries (renewable - / non-renewable sources) | India | 13,228 | CERs | Carbon offset for CLP Group’s Business Travel in 2018 | 28/03/2019 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Dr R Gopichandran,Faculty, Environment & Sustainability NTPC School of Business. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0329 | Babanpur, Killa and Sahoke Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 15,931 | CERs | Cancelled on behalf of Engie SA to offer a reduced carbon product to its B2B customers in France | 08/11/2021 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 56,000 | CERs | Retired on behalf of Erenja AG & Co. KG for the carbon neutral gas verification | 02/03/2022 | Attestation letter |
| 2342 | 14 MW Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 7,320 | CERs | I am offsetting greenhouse gas emissions for my company, Rovio Entertainment. | 10/09/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 75,297 | CERs | Cancelación Voluntaria a favor de REFINERÍA DE CARTAGENA S.A.S. (NIT 900112515-7), filial de EMPRESA COLOMBIANA DE PETRÓLEOS SA - ECOPETROL SA (NIT 899999068-1) para la neutralización de emisiones de gases efecto invernadero por consumo de combustibles fósiles | 18/01/2022 | Attestation letter |
| 7537 | Clean Energy Project in the State of Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 7,000 | CERs | ‘Retired for Ubisoft Entertainment’ | 16/03/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 13,324 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Otros Negocios Infraestructuras (Healthcare+ASUMA) | 12/05/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,214 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 10 606 275,0 kms of riders using UberX during June 2020 madeby A-CO2 | 06/07/2020 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 50 | CERs | To Neutralize the Carbon Emission generated by Sichuan Yuanxu(Beijing) Law Firm in 2021. | 10/10/2022 | Attestation letter |
| 2148 | Chumporn applied biogas technology for advanced waste water management | Waste handling and disposal | Thailand | 22,509 | CERs | Voluntary cancellation of CDM Gold Standard CERs to offset German emissions of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH for 2016 | 17/10/2019 | Attestation letter |
| 3307 | Pingtou 180MW Hydropower Project in Sichuan Province | Energy industries (renewable - / non-renewable sources) | China | 100,000 | CERs | Voluntary cancellation by Carbon Neutral Britain Ltd | 28/06/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 912 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by FRIMAC S.A (NIT 800197456-2), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 35 | CERs | Retirement – Beneficiary: ZONA FRANCA LA LIMA Retirement Reason Details: Cancelación Voluntaria realizada por ZONA FRANCA LA LIMA para compensar sus emisiones de CO2 equivalente correspondientes al año 2019. | 16/12/2020 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Mitigación de Huella de Carbono de Carlos Arturo Higuera Villanueva | 06/05/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 585 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 802 298,0 kms of riders using UberX during November 2020 made by A-CO2 | 14/12/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 3,405 | CERs | Voluntary cancellation in favour of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax. | 15/02/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 522 | CERs | MV2685 | 2020 | 16/12/2020 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 827 | CERs | MAE | 05/04/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 912 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Cemex Colombia (NIT 860002523-1), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 217 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 217 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 217 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 02/05/2019 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 4,788 | CERs | Cancelación de 4.788t CO2 correspondiente a las emisiones de las plantas Barcelona, Cartagena y Huelva de Enagás S.A. durante el 2020 | 16/03/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 118 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Rio de Janeiro - Rio de Janeiro, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Rio de Janeiro - Rio de Janeiro by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 483 | CERs | Retirement Beneficiary - Space for Giants | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 28/07/2021 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 15,920 | CERs | El presente certificado acredita la compensación de 15,920 tCO2 correspondiente a las emisiones directas e indirectas generadas por las operaciones de Acopio y Reciclado de PetStar SAPI durante el año 2021 / This certificate accredits the compensation of 15,920 tCO2 corresponding to the direct and indirect emissions generated by the Collection and Recycling operations of PetStar SAPI during the year 2021 | 09/09/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 71 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 283 021,0 kms of riders using UberPLANET during December 2020 made by A-CO2 | 22/01/2021 | Attestation letter |
| 4294 | Gwangju metropolitan city sanitary landfill LFG power plant CDM project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 34,706 | CERs | cancelled CERs will turn into be KOCs(Korea offset credits) Which can be used in domestic emission trading scheme of Republic of Korea. | 26/03/2019 | Attestation letter |
| 0490 | Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co. | Chemical industries | Egypt | 450,000 | CERs | Voluntary cancellation of CERs in favor of iSi GmbH to offset GHG emissions | 19/10/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 1,000 | CERs | These carbon offsets have been retired on behalf of CarbonClick users for the purpose of offsetting their carbon footprint." | 02/01/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 31 | CERs | Retirement – Beneficiary: Fábrica de Harinas de Centroamérica, S.A. Costa Rica. • Retirement Reason Details: Cancelación Voluntaria realizada por Fábrica de Harinas de Centroamérica, S.A., Costa Rica | 29/03/2021 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 2,000 | CERs | Cancelled on behalf of STX client with ID number: POS-30478-39534 for 2022/2023 usage | 15/03/2022 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 16,000 | CERs | Retired by Cool Effect on Behalf of the Customers of CO2,LLC | 28/09/2022 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 53,225 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT 860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 4,997 | CERs | 2017-1152 | 2020 | 09/11/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Paul Y Engineering Group Limited” for Annual Dinner in 2021 (Transaction ID: 702) | 18/02/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,037 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by EMPRESA DE TRANSPORTE INTEGRADO DE BOGOTA S.A.S (NIT 900365651-6), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 41,784 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 12/03/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 228 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CEMEX TRANSPORTE (NIT 830078000, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 479,579 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named Sasol South Africa Limited, with the carbon offset administration system account number 101044, into which the offsets must be listed. | 10/06/2021 | Attestation letter |
| 0499 | Destruction of HFC-23 at refrigerant (HCFC-22) manufacturing facility of Chemplast Sanmar Ltd | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | India | 10,000 | CERs | "N. Ranga Rao and Sons (Private) Limited" | 24/06/2022 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 126,087 | CERs | Retired on behalf of customers of Climate Partner | 03/12/2019 | Attestation letter |
| 1253 | Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) | Energy industries (renewable - / non-renewable sources) | India | 20,927 | CERs | Voluntary cancellation of 20,927 CERs for the purpose of conversion to Gold Standard VERs from project GS5860. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 23/08/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 551 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 264 573,00 kms of riders using UberPLANET and 2 641 990,00 kms of riders using UberX during May 2021 made by A-CO2 | 29/06/2021 | Attestation letter |
| 0925 | EnviroServ Chloorkop Landfill Gas Recovery Project. | Waste handling and disposal | South Africa | 275,723 | CERs | The credits are cancelled for the specific purpose of being used in the South African Carbon Tax Offset Scheme. | 21/04/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Convención Capitanas Sephora 2021 (digital) | 30/07/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 7 | CERs | Mitigación de la Huella de Carbono de Ana Marquez por el año 2021 | 09/06/2022 | Attestation letter |
| 4634 | Piedra Larga Wind Farm | Energy industries (renewable - / non-renewable sources) | Mexico | 28,742 | CERs | Clientes de Engencap Holding | 29/06/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 174 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES PLANET (NIT 830.092.981-5, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 15,404 | CERs | OFFSET ON BEHALF OF: Grupo MAPFRE España REASON FOR COMPENSATION: Compensación de la huella de carbono del año 2021 | 28/02/2022 | Attestation letter |
| 5341 | Improved Cooking Stoves Programme of Activities in Africa | Energy demand | Kenya, South Africa | 55,611 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. Is beneficiary of this cancellation. | 27/10/2021 | Attestation letter |
| 5522 | Wigton Windfarm II | Energy industries (renewable - / non-renewable sources) | Jamaica | 2,000 | CERs | "Retired on behalf of Yacht Carbon Offset Ltd. for the benefit of its clients" | 26/08/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 17 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 71 714,00 kms of riders using UberPLANET during July 2021 made by Anaconda Carbon. | 10/08/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 52 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 209 621,00 kms of riders using UberPLANET during October 2021 made by Anaconda Carbon | 11/11/2021 | Attestation letter |
| 0370 | Ganpati co-generation project at Medak, Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,940 | CERs | Cancelled on behalf of Motor Depot. | 07/12/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 53 | CERs | Voluntary cancellation of 53 CERs to offset the CO2e emissions of the event “Finanzas Sustentables MX 19” which took place the 10th and 11th of April in Mexico City, Mexico. | 04/04/2019 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 110,000 | CERs | Retired on behalf of "Alveus Beteiligungen GmbH“ | 30/09/2022 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 2,454 | CERs | To neutralize the Carbon Emission generated by Dulwich College Suzhou in 2021. | 29/07/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 68 | CERs | Compensación voluntaria a favor de PH CENTRO COMERCIAL LOS PUEBLOS ALBROOK, S.A. por la neutralización de 68tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 2344 | Zhumadian Zhongyuan Gas-Steam Combined Cycle Power Project in Henan China | Energy industries (renewable - / non-renewable sources) | China | 100,567 | CERs | Offsetting of ACT Commodities' Client's operations. | 04/02/2019 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 970 | CERs | Klimapositiver Geschäftsbetrieb der MATSEN CHEMIE AG im Jahr 2020.Dieses Zertifikat bestätigt hierzu die Neutralisierung von 970 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 970 Gold Standard CERs des Projekts "Solar Water Heater Program in India" aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 16/02/2022 | Attestation letter |
| 1026 | A.T. Biopower Rice Husk Power Project in Pichit, Thailand | Energy industries (renewable - / non-renewable sources) | Thailand | 70,572 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S.A. | 27/09/2021 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 101,018 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named EcoMetrix Africa, with the carbon offset administration system account number 100014, into which the offsets must be listed. | 28/05/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 406 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by AugusteaGrancolombia SAS (NIT 900142908-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 75 | CERs | Eco Brotbox GmbH, Kompensation CO2-Fußabdruck 2019 | 14/01/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 5,000 | CERs | Voluntary cancellation of CDM Gold Standards CERs to offset German emissions of – Land Hesse 2020 | 29/11/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 172 | CERs | Cancelación voluntaria llevada a cabo por Anaconda Carbon a favor de Coope Ande 1 paracompensar las emisiones GEI generadas durante el periodo 2021 y para cumplir con los requisitos del PPCN | 29/08/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,247 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA S. A. (NIT 860.002.554-8) for the neutralization of 2,247 tons of CO2 associated with fossil fuels to be used by CONSTRUCCIONES EL CONDOR S.A. (NIT 890.922.447-4) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 73 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles. TON Co2 generadas 73. Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 14/10/2022 | Attestation letter |
| 2148 | Chumporn applied biogas technology for advanced waste water management | Waste handling and disposal | Thailand | 13,784 | CERs | Voluntary cancellation of CDM Gold Standard CERs to offset German emissions of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH for 2015 | 02/05/2019 | Attestation letter |
| 1428 | Monomeros Nitrous Oxide Abatement Project | Chemical industries | Colombia | 320 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 13/09/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 502 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SOLARTE NACIONAL DE CONSTRUCCIONES (NIT 830.129.289-8 ), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 2600 | Amaime Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 43,387 | CERs | Voluntary cancellation in favor of BIOMAX BIOCOMBUSTIBLES S.A (NIT 830.136.799-1) for neutralization of the GHG emissions, in orden to not cause the national carbon tax. | 27/06/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 2,100 | CERs | HUELLA DE CARBONO 2021 DE SOCIEDAD ESTATAL CORREOS Y TELÉGRAFOS, S.A. S.M.E | 14/12/2021 | Attestation letter |
| 3973 | Environmental Friendly Power Generation | Energy industries (renewable - / non-renewable sources) | India | 308 | CERs | Towards Carbon Offsetting and RE 100 for Machan Resorts LLP (As advised by NettZero) | 29/08/2022 | Attestation letter |
| 10431 | Improved cookstove program in Bangladesh supported by the Republic of Korea | Energy demand | Bangladesh | 355,543 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 20/07/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Tata Steel BSL Limited . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 404 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - Mopar Betim. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 12,000 | CERs | Retired on behalf of Climaider. | 18/12/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Dr. Y. K. Hamied Non-Executive Chairman, Cipla Ltd., EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org. | 16/01/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 390 | CERs | Retirement – Beneficiary: Fábrica de Harinas de Centroamérica, S.A. Costa Rica. Retirement Reason Details: Cancelación Voluntaria realizada por Fábrica de Harinas de Centroamérica, S.A., Costa Rica | 22/02/2021 | Attestation letter |
| 6152 | Coke oven gas comprehensive utilization for co-generation project in Shandong Jikuang Morningsun Thermal Power Co., Ltd |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 50,000 | CERs | Tyczka Energy GmbH hat zur Kompensation von CO2-Emissionen CO2-Emissionsgutschriften über 50.000 Tonnen aus einem Klimaschutzprojekt (Projekt ID CDM 6152 / Nutzung von Koksofengas für ein Kraft-Wärme-Kopplungsprojekt) in der Provinz Shandong, China erworben und stillgelegt. | 01/07/2019 | Attestation letter |
| 8917 | 10 MW Solar Photovoltaic Power Plant in Rajkot, Gujarat (India) | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients | 06/10/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 20 | CERs | Für klimaneutrale Flüge in 2020 und 2021 (jährlich 1x Lang- und 3x Kurzstrecke) sowie Fahrten mit dem PKW (12000 Km) wird für Frau Elvira Wittenberg der Ausgleich von 20 Tonnen CO2-äquivalent vorgenommen. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 20 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 25/10/2019 | Attestation letter |
| 9118 | Hydro Electric Plant - Hidro Pantasma | Energy industries (renewable - / non-renewable sources) | Nicaragua | 1,800 | CERs | Blacklane emissions | 06/09/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,869 | CERs | Correos Compensa | 03/12/2019 | Attestation letter |
| 7110 | Uberlândia landfills I and II | Waste handling and disposal | Brazil | 32,930 | CERs | Beneficial Owner: BV - Banco Votorantim S.A. Reason for Cancellation: Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 23/06/2021 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 1,000 | CERs | Unavoidable emissions generated due to Asia-Pacific Climate Week 2019 are being offset through this retirement | 26/08/2019 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,388 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 2388 tons of CO2 associated with fossil fuels to be used by CONCRETOS ARGOS (Nit 860.350.697-4) in order not to cause the national carbon tax. | 13/07/2022 | Attestation letter |
| 0331 | Biomass based independent power project at Malwa Power Private Limited, Mukatsar, Punjab | Energy industries (renewable - / non-renewable sources) | India | 16,880 | CERs | On behalf of WeNow’s customers | 23/11/2018 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 11 | CERs | Voluntary cancellation on behalf of GLOBAL FRAGRANCES LABS, S.L. to offset its carbon footprint | 23/09/2022 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 18,928 | CERs | Credits were retired on behalf of Fly Victor's 2021 climate strategy | 27/01/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 17 | CERs | Voluntary Cancellation of 17 CERs for transaction no. 946-949 (KAL) | 30/12/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 840 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 4 022 990,00 kms of riders using UberX during July 2021 made by Anaconda Carbon. | 10/08/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 30 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by PICACHO MASIVO IOS (NIT 900.733.057-1, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Saroj Banerjee,Chief Environment Tata Steel BSL Limited . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6 | CERs | Mitigación de la Huella de Carbono de Marina Serrano | 09/06/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,881 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON identificado con NIT 811026709-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles. TON Co2 generadas 3.881. Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 14/10/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 35,000 | CERs | Voluntary cancellation in favor of PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) for the neutralization of 35,000 tons of CO2 associated with fossil fuels to be used by PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) in order not to cause the national carbon tax. | 13/01/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 100 | CERs | Compensación BBVA Open Internacional de Valencia | 24/09/2021 | Attestation letter |
| 9376 | Wind Power Project at Tadas, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 286,345 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 23/05/2022 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 65 | CERs | OFFSET ON BEHALF OF: Blue Banana Brand S.L. REASON FOR COMPENSATION: Hawaii Blue Banana Trip | 06/05/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 72 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 72 tons of greenhouse gas (GHG) emissions of the CBO Valentina vessel fuel consumption.” Reference month: June 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 72 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Valentina.” Mês de referência: Junho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 120,000 | CERs | Retired on behalf of ClimateCare/Natural Capital Partners for Customer ID 110793CCL | 15/10/2021 | Attestation letter |
| 9062 | Liaoning Guoli Fuxin Wangsiyingzi Wind Power Project | Energy industries (renewable - / non-renewable sources) | China | 126,000 | CERs | Klimaneutrale Erdgasprodukte der ExtraEnergie GmbH | 23/07/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 13 | CERs | Voluntary cancellation of 13 CERS to offset the CO2e emissions of Hotel Royal Playacar, employee and laundry transportation of 2018 | 15/02/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 260,000 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT 860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustibles fósiles | 20/09/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Neutrale. Offsetting the tonnes of carbon emitted in the production of the Natural Dyes 1 collection. | 12/04/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 442 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 119 870,00 kms of riders using UberX during September 2021 made by Anaconda Carbon | 05/11/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,832 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES ICEBERG (NIT 800.118.776-7, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir LAM King Kong” for Annual Dinner in 2021 (Transaction ID: 725) | 22/02/2021 | Attestation letter |
| 10537 | Solar PV based power generation by Voltas Green in Mauritius | Energy industries (renewable - / non-renewable sources) | Mauritius | 14,372 | CERs | Azura Group Climate Neutral products and offices (offset of carbon emissions by additional carbon offset projects for the campaign 2021-2022) | 30/08/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 17/09/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 416 | CERs | To Neutralize the Carbon Emission generated by Luoyang EULOONG office furniture CO.,LTD in 2021. | 20/05/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL S.A. (NIT 830.095.213-0)for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA (NIT 899.999.094-1). | 07/08/2020 | Attestation letter |
| 8759 | Providencia III: 9.11MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 650 | CERs | Purpose: to offset the Colombian carbon tax under decree 926 of 2017. Beneficiary: Chevron Petroleum company, with corporate identification number (NIT) 860005223. | 23/05/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 13 | CERs | Inauguración Planta solar flotante ACCIONA Sierra Brava | 05/02/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 2,218 | CERs | GSE | 10/03/2022 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 45,000 | CERs | Retiro a favor de DISTRIBUIDORA DE COMBUSTIBLES DISCOM SAS identificado con NIT 901160786-4 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 24/05/2022 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 11,000 | CERs | WBG Carbon offset FY2020, PO 1521005 , Guacamaya Hydro Honduras, cancellation on behalf of IFC | 29/06/2020 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 100 | CERs | Voluntary Cancellation of 100 CERs for low-carbon event (transaction no. 681 on www.clpcarboncredits.com) | 16/11/2020 | Attestation letter |
| 3700 | 13.75 MW wind power project in Davangere, Karnataka, India. | Energy industries (renewable - / non-renewable sources) | India | 71,483 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 4941 | Uganda Nile Basin Reforestation Project No 4 | Afforestation and reforestation | Uganda | 195 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds | 07/01/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Manoj Muntashir Indian Lyricist. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 584 | CERs | MV0082 | 2020 | 16/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 758 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by RH GROUP S.A.S (NIT 900394217-6), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 5342 | African Improved Cooking Stoves Programme of Activities | Energy demand | Ghana, Nigeria, Liberia | 19,782 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. Is beneficiary of this cancellation. | 27/10/2021 | Attestation letter |
| 8784 | Micro Scale Biogas CDM Project of CROSS | Energy industries (renewable - / non-renewable sources) | India | 11,050 | CERs | 1863 women from 194 villages in Andhra Pradesh have reduced 11276 tonnes of GHG emissions by using Biogas units instead of firewood, kerosene or LPG. These Biogas units were built with generous contributions from IndiGo passengers who compensated a part of their travel emissions. | 17/12/2018 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 14,942 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 18/08/2022 | Attestation letter |
| 5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 13,369 | CERs | "Retired towards DL 2022" | 26/09/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 1,174 | CERs | Neutralized the GHG emissions from the production of the furniture (Modle:L-PATT0N-SA,VIVO-26A-IDEA-UNIT and VIVO-BILL-RJ-DEER-ST-BLA) by LOGIC OFFICE FURNITURE(ZHUHAI) LTD in 2021. | 10/05/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 77 | CERs | Retirement- Beneficiary: Anaconda Carbon Retirement reason details: Voluntary compensation from Uber in Costa Rica to offset GHG emissions for Comfort rides during November made by Anaconda Carbon | 05/12/2019 | Attestation letter |
| 3064 | Wuhe Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 110,253 | CERs | Retirement on Behalf of GreenEnergy GPO Members | 14/02/2022 | Attestation letter |
| 5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 114,625 | CERs | Voluntary cancellation of 114,625 CERs for the purpose of conversion to Gold Standard VERs from project GS5013. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 19/10/2021 | Attestation letter |
| 2688 | Fugong Labuluo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 14 | CERs | Voluntary cancellation by Yueyang Forest & Paper Co. Ltd. (Unified Social Credit Identifier: 914306007225877126) to offset GHG Emissions generated from its Manufacturing process. | 13/04/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Metaflex Doors India Pvt Ltd . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 65,657 | CERs | ZEUSS PETROLEUM S.A.S NIT:811043174-1 | 18/09/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 90 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Agricola El Cantaro S.A. (Finca y Beneficio Santa Anita) para compensar las emisiones GEI emitidas durante el periodo del 2018 y cumplir con los requerimientos del PPCN | 13/11/2020 | Attestation letter |
| 10379 | Wonju Landfill Gas Recovery Project for Electricity Generation |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 16,160 | CERs | To transfer and use CERs, which owned by NEWGEN ELECTRICS and ROEN CONSULTING, as Korean offset credit | 13/07/2020 | Attestation letter |
| 5584 | Cerro de Hula Wind Project | Energy industries (renewable - / non-renewable sources) | Honduras | 40,000 | CERs | Cancellation by ClimateCare on behalf of the Worldbank to offset Worldbank 2018 Operational Emissions | 14/06/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 12 | 22/12/2020 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 36,863 | CERs | Cancellation for conversion to VCUs | 15/12/2020 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 200,000 | CERs | These CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. CERs are cancelled from 2018 vintage (60,182 from CPA 1 to 7 and 139,818 from CPA 8 to 16). | 27/09/2021 | Attestation letter |
| 2199 | 48 MW Duduluo River Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | China | 50,000 | CERs | Retired on behalf of FZ | 21/02/2022 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 1,000 | CERs | Retired for Cool Effect on behalf of Traditional Medicinals | 03/08/2022 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 6,154 | CERs | Beneficiary: Cabify Mobility International, S.L. Purpose: Compensación huella Cabify 1er trimestre 2021 | 07/06/2021 | Attestation letter |
| 5584 | Cerro de Hula Wind Project | Energy industries (renewable - / non-renewable sources) | Honduras | 10,663 | CERs | Compensación voluntaria a favor de HARISA, S.A de C.V., El Salvador, para compensar su huella de carbono 2021 / Voluntary compensation from HARISA, S.A. de C.V, El Salvador, to offset GHG emissions related to their 2021 Carbon Footprint. | 21/07/2022 | Attestation letter |
| 4243 | The Converging World Renewable Energy India Wind Farm Phase 1 | Energy industries (renewable - / non-renewable sources) | India | 164 | CERs | Voluntary cancellation of CERs in favor of Bevan Brittan LLP to offset GHG emissions | 20/10/2021 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 13 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 10/09/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 139,635 | CERs | Not shared | 26/05/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Dr. Amit Kapoor Honorary Chairman, Institute for Competitiveness . EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 16 | CERs | Cancelación de emisiones de la Convención Comercial Anual Santalucía 2019 | 17/09/2019 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 974 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 03/07/2020 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 30,000 | CERs | Beneficiario: Enagás S.A. Razón: “Cancelación de 30.000t CO2 correspondientes a las emisiones de Enagás en sus plantas de regasificación durante el 2019” | 11/03/2020 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 270 | CERs | Retirement Beneficiary - Wilkin & Sons Ltd | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 06/10/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 27,612 | CERs | "Aposentadoria em nome do Banco do Brasil para neutralização das emissões escopo 01 de 2020 / Retirement on behalf of Banco do Brasil to offset emissions from scope 01 - 2020". | 08/02/2022 | Attestation letter |
| 4677 | Vaayu India Wind Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Voluntary cancellation of 100,000 CERs for the purpose of conversion to Gold Standard VERs from project GS4603. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 14/12/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 940 | CERs | Voluntary cancellation on behalf of Piramidal, in order to offset its 2020 GHG emission (scopes 1 and 2). Cancelamento voluntário em nome da Piramidal, a fim de compensar suas emissões de GEE de 2020 (escopos 1 e 2). | 22/06/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 120 | CERs | Retirement – Beneficiary: GARNIER Retirement Reason Details: Cancelación Voluntaria realizada por GARNIER para compensar sus emisiones de CO2 equivalente correspondientes al año 2019. | 16/12/2020 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 142,000 | CERs | Gold Standard CERs on behalf of Stockholm Exergi AB production during 2019 | 15/04/2020 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 17 | CERs | Retired for SPW's Climate Positive Impact January - March 2022 | 25/04/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de AGENCIA DATSUN SABANA para la acreditación de Bandera Azul del Punto de Venta Ag. Datsun CEDI para periodo 2020 | 14/04/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 320 | CERs | Voluntary cancellation of CERs was made on behalf of Armazém Mopar Betim under Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 12/09/2019 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1,528 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EQUAIR para compensar las emisiones GEI generadas por todos los pasajeros transportados durante el mes de Junio 2022. | 23/08/2022 | Attestation letter |
| 2341 | Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Cañaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia | Waste handling and disposal | Colombia | 2,174 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 10/11/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 11 | CERs | Für klimaneutrale Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 11 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 11 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 19/12/2019 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 1,402 | CERs | "A BATTRE concessionária de operação do Aterro Sanitário Metropolitano Centro, no âmbito do Termo de Compromisso de Neutralização firmado com a Prefeitura Municipal de Salvador, comprova através do presente certificado a neutralização das emissões de carbono do evento Climate Week Salvador 2019. Os créditos de carbono utilizados foram gerados no projeto de geração de energia a biogás implementado pelo Grupo Solvi, que atualmente fornece energia renovável equivalente a uma cidade de mais de 200 000 habitantes. O projeto de biogás de Salvador foi um dos primeiros projetos de crédito de carbono do mundo e desde a sua entrada em operação já evitou a emissão de mais de 8 000 000 de toneladas de CO2 para a atmosfera." "BATTRE, the operating concessionaire of Aterro Metropolitano Centro, under the Neutralization Commitment Agreement signed with the Salvador City Hall, hereby proves, through this certificate, the carbon emissions neutralization of the Climate Week Salvador 2019 event. The carbon credits used to the neutralization were generated in the landfill gas power generation project implemented by the Solvi Group, which currently supplies renewable energy to an equivalent city of more than 200 000 inhabitants. The Salvador landfill gas project has been one of the first carbon credit projects in the world and since its commissioning has already prevented the emission of more than 8 000 000 tons of CO2 into the atmosphere." | 12/11/2019 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 553 | CERs | Compensação das emissões de GEE de 2020 da Tembici. Offsetting Tembici's 2020 GHG emissions. | 20/12/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 1,527 | CERs | GSE | 10/03/2022 | Attestation letter |
| 4846 | Wind Power Project in Tirunelveli Tamilnadu | Energy industries (renewable - / non-renewable sources) | India | 57,839 | CERs | Company name; Ecotricity (Eneco) Reason; CO2 Compensation year ending 30 April 2022. | 09/11/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,347 | CERs | 2017-982 | 2020 | 09/11/2020 | Attestation letter |
| 5794 | Grid Connected Wind Power Project by M/s. D. J. Malpani in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 28,577 | CERs | “Gasversorgung Görlitz GmbH – CO2 neutrales Erdgas” | 29/03/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,247 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA S. A. (NIT 860.002.554-8) for the neutralization of 2,247 tons of CO2 associated with fossil fuels to be used by CONSTRUCCIONES EL CONDOR S.A. (NIT 890.922.447-4) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 219 | CERs | Festival de Cannes | 05/04/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 776 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by LATINOAMERICANA DE CONSTRUCCIONES S.A.S (NIT 800.233.881-4, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 101 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 101 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 101 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 20/09/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 2,136 | CERs | Retirement Beneficiary : FES Group, Reason - I want to contribute to Climate Action. | 10/03/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 100 | CERs | Compensación BBVA Open Internacional de Valencia | 14/10/2021 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 7,518 | CERs | Retired on behalf of ISA INTERVIAL - Neutralización Emisiones Controladas 2020 - SCX ID 0109-E1783A91 | 01/02/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 608 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by COLTUGS NIT 900485260-4, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 0784 | Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power) | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 7,276 | CERs | Cancelled CERs will turn into be KOC which can be used in domestic emission trading scheme of Republic of KOREA | 21/08/2019 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 378 | CERs | Voluntary cancellation by Asia Symbol (GuangDong) Paper Co., Ltd to offset GHG Emissions generated from partial copy paper products (Brand Jing Dong Jing Zao) | 28/04/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 720 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de HP Inc Costa Rica Limitada , para compensar la emisiones GEI generadas durante el período 2020 y para cumplir con los requisitos del PPCN 2.0 | 30/06/2021 | Attestation letter |
| 5845 | Grid Connected Wind Power Project by M/s. Giriraj Enterprises at Tejuva, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 31,531 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 120 | CERs | Retirement-Beneficiary: HP Inc Costa Rica Ltda. Retirement Reason Details: Voluntary cancellation on behalf of HP Inc Costa Rica Ltda. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018 | 21/10/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Jornada Vive 2019 | 05/02/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 553 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of March 2019 | 05/04/2019 | Attestation letter |
| 7156 | Omega Wind Power Plants Programme of Activities | Energy industries (renewable - / non-renewable sources) | Brazil | 13,992 | CERs | "Compensacao das emissoes de GEE (gases de efeito estufa) provenientes das operacoes de transporte do Varejo no ano de 2.022 do Grupo Boticario (unidade de negoocio, Aero). Offsetting of GHG emissions (greenhouse gases) generated by the Retail transport operations in 2.022 of Grupo Boticario (business unit, Aero)." | 30/06/2022 | Attestation letter |
| 7260 | DEWA Chiller Station L | Energy industries (renewable - / non-renewable sources) | United Arab Emirates | 524 | CERs | Voluntary cancellation made by Emirates Literature Festival to offset emissions generated from its 2019 and 2020 events | 18/06/2020 | Attestation letter |
| 2842 | Hunan Xiaotan Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 75,253 | CERs | Entwertung der CO2-Zertifikate für Grüngasprodukte von Eprimo | 18/11/2021 | Attestation letter |
| 1229 | Catalytic N2O destruction project in the tail gas of the nitric acid plant PANNA 3 of Enaex S.A. | Chemical industries | Chile | 1 | CERs | Voluntary cancellation in favour of iSi GmbH, Vienna, Austria | 17/09/2021 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 87,113 | CERs | On behalf of Lenovo Clients 17 December 2021 - 14 January 2022, Program Managed by Lenovo. | 20/01/2022 | Attestation letter |
| 1566 | 1.725 MW Mini Hydel Scheme on Nagavali River, Andhra Pradesh, India | Energy industries (renewable - / non-renewable sources) | India | 9,798 | CERs | Retired on behalf of UBS AG as part of offsetting historical scope 1 & 2 emissions from year 2000 – 2020 | 31/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,445 | CERs | 2019-1594 | 2020 | 11/11/2020 | Attestation letter |
| 10404 | Solar Power Project by Fortum FinnSurya Energy Pvt Ltd | Energy industries (renewable - / non-renewable sources) | India | 75,000 | CERs | "Voluntary cancellation of 75000 GS CERs for the purpose of conversion to Gold Standard VERs from project GS5523. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose." | 01/07/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 31,222 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de CONTECON GUAYAQUIL para compensar las emisiones de GEI generadas por su operación durante el periodo 2020. | 17/01/2022 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 47,805 | CERs | Aposentadoria em nome da Unidas de 47.805 tCO2 para compensação das emissões totais dos escopos 1 e 2; e 9% do Escopo 3, relativos ao inventário do ciclo de 2021, período: 01.01.2021 a 31.12.2021 | 02/06/2022 | Attestation letter |
| 8759 | Providencia III: 9.11MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 700 | CERs | Purpose: to offset the Colombian carbon tax under decree 926 of 2017. Beneficiary: Chevron Petroleum Company, with corporate identification number (NIT) 860005223-9. | 12/09/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 41 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by TRANSATELLITAL SAS NIT 811035903-9, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 30,502 | CERs | Wah Kwong Maritime Transport Holdings Limited for 2020 Internal Carbon Offset | 16/04/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Presentación a Prensa Renault Arkana 2021 | 30/07/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 38 | 22/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 730 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CONSORCIO VIAL MAGDALENA MEDIO (NIT 901.070.071-0, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 39,664 | CERs | Retiro a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS identificado con NIT 900497906-5 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 17/02/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 36 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 1,220 | CERs | To offset the GHG generated from operation activities of Central air conditioning room in Royal Mediterranean Hotel Guangzhou in 2021. | 02/12/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 4,606 | CERs | November 2021 Cool Effect Platform Sales: UPMSIC2019 | 24/12/2021 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 653,363 | CERs | Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 05/08/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Dr LO Wai Kwok” for Annual Dinner in 2021 (Transaction ID: 731) | 22/02/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 7,497 | CERs | 2018-0025 | 2020 | 09/11/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 174 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES PLANET (NIT 830.092.981-5, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 0259 | Trupan Biomass Power Plant in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 5,250 | CERs | Huella Cabify 2020 | 08/04/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 12/04/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 10 | CERs | Compensación voluntaria llevada a cabo por Anaconda Carbon a favor de Cafenor S.A. de C.V. para compensar las emisiones de GEI derivadas de la operación del Beneficio Cafenor para el periodo 2020 | 25/05/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 90,000 | CERs | Not shared | 15/04/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 31 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 121.314,0 kms of riders using UberCOMFORT during March 2020 made by A-CO2 | 09/04/2020 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 3 | CERs | Voluntary Cancellation of 3 CERs for transaction no. 540 on www.clpcarboncredits.com | 31/01/2020 | Attestation letter |
| 5342 | African Improved Cooking Stoves Programme of Activities | Energy demand | Ghana, Nigeria, Liberia | 2,798 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. Is beneficiary of this cancellation. | 27/10/2021 | Attestation letter |
| 8784 | Micro Scale Biogas CDM Project of CROSS | Energy industries (renewable - / non-renewable sources) | India | 20,109 | CERs | 3059 women from 262 villages in Andhra Pradesh have reduced 20,519 tonnes of GHG emissions by using Biogas units instead of firewood, kerosene or LPG. These Biogas units were built with generous contributions from IndiGo passengers who compensated a part of their travel emissions. | 09/06/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 9 | CERs | Stand ITP Aero en FEINDEF 2021 | 21/12/2021 | Attestation letter |
| 0086 | Poechos I Project | Energy industries (renewable - / non-renewable sources) | Peru | 162 | CERs | Purpose: Balance in favour of, as per order 10123 Beneficiary: Ian Calvert e-mail ianjcalvert@gmail.com, 169 Warde Street Hulme, Manchester, M15 5TF, United Kingdom | 28/08/2019 | Attestation letter |
| 3068 | Suqian Kaidi Biomass Co-generation Project | Energy industries (renewable - / non-renewable sources) | China | 135,912 | CERs | retired on behalf of FZ | 28/12/2021 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 7,480 | CERs | Retired on behalf of Durbert Yili Dairy Co., Ltd to offset CO2 emissions related to the production of Jinlingguan Seine Mouiller series infant formula milk powder products from June to August, 2022. | 16/09/2022 | Attestation letter |
| 5153 | KDHC Daegu Biomass Cogeneration Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 42,483 | CERs | It is to be offset for domestic carbon emission trading in South Korea | 08/07/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 192 | CERs | Beneficiary: Popular Pensiones S.A. Reason: Compensación voluntaria emitida por Anaconda Carbon para POPULAR PENSIONES S.A. para compensar las emisiones GHG generadas de sus operaciones durante el año 2018 conforme el Programa País Carbono Neutral 2.0 de la Dirección de Cambio Climático del MINAE | 18/04/2019 | Attestation letter |
| 8438 | Clean Cook Stoves in Sub-Saharan Africa by ClimateCare Limited | Energy demand | Ghana, Kenya | 3,008 | CERs | CERs cancellation in exchange for VCS Offset Credits (VCU) to be issued by Verified Carbon Standard Offset Program to 3Degrees Group, Inc. These have not been used for any offsetting purposes or mandatory or voluntary compliance purpose. | 02/02/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon credits available for voluntary uses - TR 50 | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 57,468 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Construcción(Oceanía) | 12/05/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,774 | CERs | Retiro a favor de PETROBRAS COLOMBIA COMBUSTIBLES SA identificado con NIT 900047822-5 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 12/04/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 3,238 | CERs | For Cool Effect on Behalf of Nuun | 16/04/2021 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,507 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 15/02/2022 | Attestation letter |
| 4322 | UPOIC Wastewater Treatment for Energy Generation, Krabi |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Thailand | 16,529 | CERs | Retired of behalf of Certas Energy UK Ltd | 11/04/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 67,845 | CERs | Presented to: Banco Santander México, S.A. Concepto: Compensación huella de carbono Banco Santander 2020 | 05/11/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,649 | CERs | Voluntary cancellation on behalf of Logicalis Brazil, in order to offset its 2020 scope 3 GHG emissions. Cancelamento voluntário em nome da Logicalis Brasil, a fim de compensar suas emissões de GEE do escopo 3 de 2020. | 21/06/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8 | CERs | David Abrantes | 21/02/2020 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 1,726 | tCERs | Cancellation for conversion to VCUs | 30/12/2020 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 494 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 494 tons of greenhouse gas (GHG) emissions of the CBO Flamengo vessel fuel consumption.” Reference month: June 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 494 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Flamengo.” Mês de referência: Junho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 89,379 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 06/01/2021 | Attestation letter |
| 4176 | Ibi Batéké degraded savannah afforestation project for fuelwood production (Democratic Republic of Congo) | Afforestation and reforestation | Democratic Republic of the Congo | 2,875 | tCERs | Per Syngenta Foundation for Sustainable Agriculture's request for cancellation | 25/09/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,708 | CERs | Retirement on behalf of Natural Capital Partners' clients | 24/04/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | OFFSET ON BEHALF OF: Tioral REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 10/02/2022 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 7,000 | CERs | Retired on behalf of Exodus Travels Ltd | 19/05/2022 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 12,000 | CERs | Retired on behalf of IGS Energy Carbon-Neutral Natural Gas customers for 2021 | 13/12/2021 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 2,805 | CERs | Not shared | 31/03/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Yee Hop Engineering Company Limited” for Annual Dinner in 2021 (Transaction ID: 705) | 18/02/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,198 | CERs | voluntary compensation from UBER Mexico to offset GHG emissions made by A-CO2 | 05/11/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100,000 | tCERs | Carbon removal credits for voluntary climate action - TR 1 | 22/12/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir HON Chi-keung” for Annual Dinner in 2021 (Transaction ID: 732) | 22/02/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 920 | CERs | 2019-0099 | 2020 | 11/11/2020 | Attestation letter |
| 5090 | Renewable Energy Wind Power Project in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 42,106 | CERs | Voluntary cancellation of 42,106 CERs for the purpose of conversion to Gold Standard VERs from project GS5007. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 29/03/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100,000 | tCERs | Carbon removal credits for voluntary climate action - TR 5 | 22/12/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 194 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 194 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 194 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 07/08/2020 | Attestation letter |
| 9154 | Wind Power Project at Jath, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 577,234 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 31/05/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 18 | CERs | Für Frau Renate Grambow und Herrn Gerhard Grambow wird für intensive Reisetätigkeiten in 2020 der Ausgleich von 18 Tonnen CO2-äquivalent (dies entspricht 12 Hin- und Rückflügen der Strecke Hamburg-Mallorca für zwei Personen) vorgenommen. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 18 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 21/02/2020 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 80 | CERs | Purpose: Compensação das Emissões de GEE das entregas do ecommerce da Youcom Beneficiary: YOUCOM | 20/12/2021 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 38 | CERs | Retired on behalf of FAIR`N GREEN member Vinyard Egon Schmitt, Bad Dürkheim to offset carbon emission of wine production 2019 | 13/01/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 80 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 325 922,98 kms of riders using UberPLANET during March 2021 made by A-CO2 | 13/04/2021 | Attestation letter |
| 1456 | 5 MW Wind Power Project of Alembic Ltd at Bhavnagar , Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 20,365 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 3061 | Tongcheng Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 37,017 | CERs | Naturgas – Verbrauch 2021 CO2-neutrales Erdgas des Energieversorgers: Städtische Werke AG Königstor 3-13 34117 Kassel Deutschland (Germany) Kompensation der CO2-Emissionen aus der Verbrennung von Erdgas für Kunden der Städtische Werke AG. | 17/02/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 55 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 55 ton of greenhouse gas (GHG) emissions of the CBO Anita vessel fuel consumption.” Reference month: March 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 55 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Anita.” Mês de referência: Março de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 14/04/2022 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 747,463 | CERs | Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 05/08/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for FORE School of Management, New Delhi. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1,340 | CERs | Sociedad Estatal Correos y Telégrafos, S. A. Correos Compensa | 01/04/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 25 | CERs | 25 tonnes retired in the name of Offset Alliance | 16/04/2021 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 3,676 | CERs | Not shared | 31/03/2020 | Attestation letter |
| 9977 | West African Biodigester Programme of Activities | Energy industries (renewable - / non-renewable sources) | Benin, Burkina Faso | 18,849 | CERs | CERs that the UK Department for Business, Energy and Industrial Strategy (BEIS) purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated March 23, 2022 | 05/04/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 82 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 82 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 82 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 04/04/2022 | Attestation letter |
| 0258 | Nueva Aldea Biomass Power Plant Phase 1 | Energy industries (renewable - / non-renewable sources) | Chile | 16,323 | CERs | Retired on behalf of SCX - Banco de Chile - "Neutralización HdC 2017 - SCX ID 0079-E2004A63 | 14/06/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,167 | CERs | 2018-138 | 2020 | 11/11/2020 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 274 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 274 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 274 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 0846 | La Venta II | Energy industries (renewable - / non-renewable sources) | Mexico | 5,391 | CERs | Per Eco-Carbonne S.A.S. cancellation request dd.1/26/2017 | 23/06/2020 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 65,000 | CERs | Motorpoint: Offsetting the emissions of cars sold in 2022 | 20/12/2021 | Attestation letter |
| 3307 | Pingtou 180MW Hydropower Project in Sichuan Province | Energy industries (renewable - / non-renewable sources) | China | 10,000 | CERs | verkoop propaangasflessen | 08/09/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 303 | CERs | Convención de ventas de Cinépolis llevada a cabo en el Hard Rock Hotel, ubicado en Playa del Carmen del 09 al 12 de abril de 2019 | 20/01/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 246 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by EASYFLY S.A. NIT 900088915-7, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 5,496 | CERs | Voluntary cancellation by MCC Paper Yinhe Co.,Ltd.(Unified Social Credit Identifier:913715811679659207) to offset GHG Emissions generated from its operation and manufacturing processes. | 26/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 730 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COLVANES (NIT 800.185.306-4), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir TSUI Hoi Chung, Simon” for Annual Dinner in 2021 (Transaction ID: 728) | 22/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ms Rachel NG” for Annual Dinner in 2021 (Transaction ID: 729) | 22/02/2021 | Attestation letter |
| 0373 | São João Landfill Gas to Energy Project (SJ) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 2,221 | CERs | Voluntary cancellation on behalf of Logicalis (Promonlogicalis Tecnologia e Participações Ltda.) to offset its GHG emissions scope 3 of 2019. Cancelamento voluntário em nome da Logicalis (Promonlogicalis Tecnologia e Participações Ltda.) para compensar as emissões de GEEs do seu escopo 3 de 2019. | 15/04/2020 | Attestation letter |
| 8921 | Shandong Linyi Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 1,290 | CERs | Voluntary cancellation for carbon emission from the China International Fair for Investment & Trade | 17/10/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 650 | CERs | Compensación voluntaria realizada por Los Arallanes Sociedad Anonima (AFZ) para compensar las emisiones GEI derivadas de su operación para el periodo 2020 y cumplir con los requisitos del PPCN. | 08/06/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 25,230 | CERs | Retired on behalf of Deloitte China | 30/06/2021 | Attestation letter |
| 0373 | São João Landfill Gas to Energy Project (SJ) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 200 | CERs | A ZCO2 liderou o projeto de neutralização das emissões de gases de efeito estufa (GEE) de 200 consumidores da concessionária Energisa ao utilizar, pela carteira digital da Plataforma ZCO2, com rastreabilidade em Blockchain, as duchas eficientes Hydra/Deca Star 8T Eco. A ZCO2 é um programa de coalizão de cidadãs, cidadãos e empresas engajadas no combate ao aquecimento global. ZCO2 led the project to neutralize greenhouse gas (GHG) emissions of 200 consumers from the power utility Energisa by using ZCO2 Platform digital wallet, with Blockchain traceability and the efficient showers Hydra/Deca Star 8T Eco. ZCO2 is a coalition program of citizens and companies engaged to combat global warming. | 11/11/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Sanjay Grover (AIMA Delegate) . EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 4 | CERs | OFFSET ON BEHALF OF Rentacar.com.ar REASON FOR COMPENSATION I am offsetting the carbon footprint of my clients | 09/05/2022 | Attestation letter |
| 7093 | Los Cocos Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 25 | CERs | Retirement Beneficiary : ENERION RENEWABLES Carbon Neutrality Program 2020. Retirement for the offset of the corporate activity in 2019, this in accordance with GHG Protocol and ISO14064-1 scopes 1, 2 & 3 | 18/11/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 4 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for June 2021 sales | 08/07/2021 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 661 | CERs | Voluntary cancellation made by ASOCIACIÓN DE BANCOS DE MÉXICO ABM, A.C. | 13/09/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,426 | CERs | Retirement – Beneficiary: LOS ARALLANES, S.A.; Retirement Reason Details: Cancelación voluntaria hecha por Los Arallanes S.A. para su estrategia de reducción de emisiones para el Programa de Carbono Neutralidad de Costa Rica de sus emisiones del 01 de enero al 31 de diciembre del 2019. | 11/05/2020 | Attestation letter |
| 2467 | Landfill Gas Recovery and Utilization at Bukit Tagar Sanitary Landfill, Hulu Selangor in Malaysia |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Malaysia | 19,500 | CERs | ABB FIA Formula E | Certified carbon neutrality| Seasons 1 - 6 | Offer No. 2020 - 0982 | 18/09/2020 | Attestation letter |
| 0310 | Bundled Wind power project in Jaisalmer (Rajasthan in India) managed by Enercon (India) Ltd. | Energy industries (renewable - / non-renewable sources) | India | 21,900 | CERs | "Klimaneutrales Erdgasprodukt Stadtwerke Burg 2020." | 18/03/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 259 | CERs | Compensation of carbon footprint for year 2020 of Grupo Bodegas Palacio | 15/04/2021 | Attestation letter |
| 0851 | Daegu Bangcheon-Ri Landfill Gas CDM Project | Waste handling and disposal | Republic of Korea | 240,193 | CERs | The amount of 240,193 CERs will be converted to Korean Offset Credit in the Korea Emissions Trading Scheme. | 13/12/2019 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 3 | CERs | Cancelled to neutralize the greenhouse gas emissions of Scope I generated by Guangxi CNGR New Energy Technology Co., Ltd. in the first half of 2022. | 29/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 183 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COOLITORAL (NIT 890.105.535-1), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 6,519 | CERs | Retired on behalf of Ubisoft Entertainment. | 16/03/2022 | Attestation letter |
| 4665 | N2O Abatement Project of Capro Corporation | Chemical industries | Republic of Korea | 137,433 | CERs | CERs cancellation in exchange for Korean Offset Credits(KOC) to be issued by Korean Offset program for the domestic ETS in the Republic of Korea. The beneficiary of all cancelled CERs is Capro Corporation and Hyosung Corporation. | 10/05/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 2,534 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by COLTANQUES SAS, NIT 860040576-1,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | Energy industries (renewable - / non-renewable sources) | Madagascar, Ethiopia, Kenya, Malawi, Mozambique, Nigeria, Uganda, Zambia, Chad, Dominican Republic, Côte d`Ivoire, Liberia, Rwanda, Sierra Leone, Namibia, Zimbabwe, Ghana, South Africa, Somalia | 36,526 | CERs | Cancelled by ClimateCare on behalf of Jaguar Land Rover to offset JLR UK manufacturing emissions | 02/04/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Chun Wo Development Holdings Limited” for Annual Dinner in 2021 (Transaction ID: 696) | 18/02/2021 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 256,000 | CERs | Aquisição de 300.000 VCUs para a compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A | 20/10/2021 | Attestation letter |
| 4676 | Malagone SHP CDM Project, Minas Gerais, Brazil (JUN1122) | Energy industries (renewable - / non-renewable sources) | Brazil | 3,000 | CERs | Lote 85: Neutralize Carbono CNPJ.: 11.639.463/0001-14 Finalidade: Neutralização de emissões | 01/09/2020 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 133 | CERs | Voluntary cancellation to offset the GHG (estimated) generated from renovation and operation of GUILIN BANK CO.,LTD. YULIN YUCHAI AVENUE TECHNOLOGY SUB-BRANCH from June 20, 2021 to December 31, 2023. | 25/03/2022 | Attestation letter |
| 3520 | Federal Intertrade Haiyuan Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 2,930 | CERs | Retirement on behalf of Gothaer Versicherungsbank VVaG to become climate neutral 2021 | 02/07/2021 | Attestation letter |
| 7036 | Solar PV power project at Patan, India | Energy industries (renewable - / non-renewable sources) | India | 68,000 | CERs | Takeda Pharmaceutical Company Limited’s Scope 3 Emissions | 24/10/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,997 | CERs | 2017-757 | 2020 | 09/11/2020 | Attestation letter |
| 7474 | West Huaybong 3 wind farm project | Energy industries (renewable - / non-renewable sources) | Thailand | 50,000 | CERs | Retired on behalf of Ecologi Action Ltd | 19/10/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Skyview Costa Rica para compensar las emisiones GEI generadas por los vuelos del Festival realizado en el mes de agosto 2021. | 05/11/2021 | Attestation letter |
| 7562 | 10.4 MW wind power project at Tiwari site of Jodhpur district in the state of Rajasthan, India | Energy industries (renewable - / non-renewable sources) | India | 32,000 | CERs | "Stilllegung im Auftrag der Energieagentur Ebersberg-München gGmbH, Kompensation der CO2-Emissionen des Landkreises München in 2021, Spende Klimaschutzprojekte Landkreis München 2021" | 29/04/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 423 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 423 tons of greenhouse gas (GHG) emissions of the AH VALLETTA vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 423 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH VALLETTA.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 1151 | KSPCL Waste Heat to Power project, India | Energy industries (renewable - / non-renewable sources) | India | 15,312 | CERs | Retired on behalf of FZ. | 28/03/2022 | Attestation letter |
| 9176 | Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” | Energy demand | Honduras | 74,941 | CERs | The CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 28/07/2021 | Attestation letter |
| 8103 | 9 MW Wind Energy Farm at Jodhpur Rajasthan by HZL | Energy industries (renewable - / non-renewable sources) | India | 3,000 | CERs | These credits were retired on behalf of Childbase Partnership for their 2018/19 Scope 1, 2 and 3 emissions | 16/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 508 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CONSTRUPROYECT (NIT 819.004.116-5), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 720 | CERs | Voluntary cancellation in favor of Puma Energy Colombia Combustibles SAS (NIT 900497906-5) for neutralization of the GHG emissions associated with fossil fuels used by Puma Energy Colombia Combustibles SAS (NIT 900497906-5), in order to not cause the national carbon tax. | 13/12/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 384 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de HP INC. Costa Rica Ltda. para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Direccion de Cambio Climático y el PPCN | 04/08/2020 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 550 | CERs | Kompensation der Treibhausgasemissionen der SQS für das Jahr 2018 | 14/05/2019 | Attestation letter |
| 0165 | ESTRE’s Paulínia Landfill Gas Project (EPLGP) | Waste handling and disposal | Brazil | 40,000 | CERs | Cancelled on behalf of EnergyAustralia's Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 25/03/2022 | Attestation letter |
| 1366 | Biomass generation project, in Sheyang county, Jiangsu province, P.R. China | Energy industries (renewable - / non-renewable sources) | China | 668 | CERs | To offset emissions for Trees4Travel clients | 14/01/2022 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 71,827 | CERs | Retiro a favor de Biomax S.A. NIT 830136799-1. Este retiro cumple con los requerimientos de la no causación del impuesto al carbono en Colombia, de acuerdo con el Decreto 926 de 2017 | 17/10/2022 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 1,767 | CERs | Retired on behalf of Natural Capital Partners' Clients | 30/05/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 65 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 264 573,00 kms of riders using UberPLANET and 2 641 990,00 kms of riders using UberX during May 2021 made by A-CO2 | 12/07/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2019-0246 | 2020 | 11/11/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 15 | tCERs | COMPENSAÇÃO DE EMISSÕES DA "1a ETAPA MINAS CHAMPIONS LEAGUE - CEPEL/FHMG-2022". DATA DO EVENTO: 11 A 13 DE MARÇO 2022 REALIZAÇÃO: CENTRO DE PREPARACAO EQUESTRE DA LAGOA - CEPEL | 09/03/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 23,463 | CERs | Compensation of carbon footprint for year 2019 of Acciona Agua | 18/05/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 763 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COORDINADORA DE TANQUES S.A.S (NIT 811.016.822), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 41,527 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 06/01/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,300 | CERs | Retirement-Beneficiary: RENTE UN AUTO ESMERALDA S.A. Retirement Reason Details: Voluntary cancellation on behalf of Rente un Auto Esmeralda S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018 | 08/10/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 110 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SERVICIOS ETIWAN (NIT 900573165-1), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 8323 | Grid Connected Gas based Combined Cycle Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 23,109 | CERs | Retired on behalf of DL 2021 CN. | 15/12/2021 | Attestation letter |
| 9113 | 13.75 MW wind power project at Bellary & Davangere district in the state Karnataka, India | Energy industries (renewable - / non-renewable sources) | India | 60,000 | CERs | DL Carbon Neutrality 2021 | 20/04/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 30,603 | CERs | Retired on behalf of Fokus Zukunft GmbH & Co | 20/12/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | ANGELO DE BARRETO ARANHA | 20/02/2020 | Attestation letter |
| 4856 | Abohar Branch Canal Based Small Hydro Project in Punjab, India | Energy industries (renewable - / non-renewable sources) | India | 2,191 | CERs | On behalf of WeNow’s customers | 26/11/2018 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Mitigación de la Huella de Carbono de Andrea Higuera Valdés | 05/05/2022 | Attestation letter |
| 5938 | Grid Connected Wind Power Project by M/s Giriraj Enterprises in Madhya Pradesh | Energy industries (renewable - / non-renewable sources) | India | 32,313 | CERs | “Towards Delta’s 2020 CN goal” | 23/07/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 166 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of ALZU GROUP/Alimentos Zuñiga S.A. to offset emissions generated by the company operations during 2017. | 02/01/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon removal credits for voluntary climate action - TR 51 | 22/12/2020 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 1,772 | CERs | Cancelled to neutralize the Carbon Emissions generated by Siemens Shanghai Medical Equipment Ltd. in 2021 | 08/08/2022 | Attestation letter |
| 8500 | SHP ITAGUACU CDM PROJECT (JUN 1146), BRAZIL | Energy industries (renewable - / non-renewable sources) | Brazil | 171 | CERs | Purpose: “Estamos compensando as emissões de gases de efeito estufa da operação do sistema teleférico referente a 2021” Beneficiary: Parque Bondinho Pão de Açúcar | 23/03/2022 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 118,121 | CERs | This certificate represents the retirement of carbon credits equivalent to the carbon emissions generated during the manufacture process of Radar brand of tires from July 2018 to December 2018 and January 2020 to December 2020. | 31/05/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3,452 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 16.534.529,0 kms of riders using UberX during February 2020 made by A-CO2 | 06/03/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 57 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 222.683,0 kms of riders using UberCOMFORT during February 2020 made by A-CO2 | 06/03/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 86 | CERs | Enabling everyday climate action through Doconomy | 01/06/2021 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 58,492 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 20/10/2021 | Attestation letter |
| 3501 | Zafarana 8 - Wind Power Plant Project, Arab Republic of Egypt | Energy industries (renewable - / non-renewable sources) | Egypt | 20,593 | CERs | First Climate for Adolf Roth GmbH & Co. KG: ROTH Energie Projekt Windkraft Ägypten | 20/10/2022 | Attestation letter |
| 4537 | DakRTih Hydropower Project, Vietnam | Energy industries (renewable - / non-renewable sources) | Viet Nam | 55,170 | CERs | Carbon credits retired by AzzeroCO2 on behalf of Fastweb Spa - estimated value of direct emissions (Scope 1) and emissions related to operations (Scope 3) in 2024 | 14/09/2022 | Attestation letter |
| 9062 | Liaoning Guoli Fuxin Wangsiyingzi Wind Power Project | Energy industries (renewable - / non-renewable sources) | China | 31,091 | CERs | Retired on behalf of Ubisoft Entertainment. | 16/03/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Dr Simon CHAN Wai Kuen” for Annual Dinner in 2021 (Transaction ID: 718) | 18/02/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 56 | CERs | Voluntary cancellation by Agricultural Bank of China (Changxing Si’an Green Sub-branch) to offset GHG Emissions generated from its daily operation in 2021 | 11/05/2022 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 593 | CERs | Retirement Beneficiary - Equinox Horticulture Ltd | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 06/10/2021 | Attestation letter |
| 9973 | Biomass based power plant in Mahendargarh, Haryana | Energy industries (renewable - / non-renewable sources) | India | 515 | CERs | I am offsetting green house gas emissions for my company | 29/05/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Albany TAM Wa Lat” for Annual Dinner in 2021 (Transaction ID: 723) | 22/02/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,372 | CERs | 2019-1580 | 2020 | 11/11/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 652 | CERs | Cancelación voluntaria realizada por INOLASA a favor de Molinos de Costa Rica S.A para compensar las emisiones GEI generadas durante el año 2020 y cumplir con la Declaratoria de Carbono Neutralidad de la Direccion de Cambio Climático y el PPCN | 08/08/2022 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 82,434 | CERs | Retirement Beneficiary - Flamingo Horticulture Investments Ltd | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 13/10/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 138 | CERs | Retirement – Beneficiary: INVERSIONES HOTELES ONCE DE ABRIL, SRL Retirement Reason Details: Voluntary Cancellation for COURTYARD SAN JOSE AIRPORT ALAJUELA, for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st, to December 31st, 2018 | 31/10/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 38 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de GRUPO CCME-Intermedica para compensar las emisiones de GEI correspondiente al Inventario 2020. | 10/09/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 18 | CERs | Voluntary Cancellation of 18 CERs for transaction no. 579 on www.clpcarboncredits.com | 15/06/2020 | Attestation letter |
| 5678 | Wind Power Project by National Enterprises at Tamil Nadu, India | Energy industries (renewable - / non-renewable sources) | India | 5,284 | CERs | Retired on behalf of Signature Floorcoverings Pty Ltd for Climate Active FY2021. | 10/06/2022 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 16,908 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 305 | CERs | OFFSET ON BEHALF OF: ACCIONA Cultura REASON FOR COMPENSATION: EXPOSICIÓN INMERSIVA “VIDA Y OBRA DE FRIDA KAHLO” | 31/08/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 18 494,0 kms of riders using UberCOMFORT during July 2020 made by A-CO2 | 10/08/2020 | Attestation letter |
| 4665 | N2O Abatement Project of Capro Corporation | Chemical industries | Republic of Korea | 162,996 | CERs | cancelled CERs will turn into be KOCs(korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea. | 03/04/2020 | Attestation letter |
| 1171 | Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the No. 9 nitric acid plant at African Explosives Ltd (“AEL”), South Africa | Chemical industries | South Africa | 62,546 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization AEL Mining Services Limited, to be listed in COAS Account number 100015. | 09/10/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 218 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Antojese Travel for all air tickets, hotels and car rentals bookings issued for the period from May 1st to September 30, 2021 | 05/11/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 17,724 | CERs | “Numidia Scope 3 Emissions related to transport & Warehousing” | 05/07/2022 | Attestation letter |
| 4665 | N2O Abatement Project of Capro Corporation | Chemical industries | Republic of Korea | 133,912 | CERs | cancelled CERs will turn into be KOCs(Korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea | 02/07/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 912 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 12/04/2022 | Attestation letter |
| 4700 | Vaayu India Wind Power Project in Gujarat. | Energy industries (renewable - / non-renewable sources) | India | 73,682 | CERs | Voluntary cancellation of 73,682 CERs for the purpose of conversion to Gold Standard VERs from project GS3958. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 10/09/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,547 | CERs | 2019-1235 | 2020 | 11/11/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,500 | CERs | This voluntary cancellation of CERs was made on behalf of Programa Amigo do Clima. Details provided at www.amigodoclima.com. | 14/02/2020 | Attestation letter |
| 3296 | 14MW MIRAE ASSET PV(photovoltaic) power plant bundling project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 10,875 | CERs | Cancelled CERs will return into be KOCs (Korea offset credits) which can be used in domestic emissions trading scheme of Republic of Korea. | 16/08/2022 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 20,000 | CERs | Banco Santander Chile/Compensar la huella de carbono alcances 1,2 y 3 generada y que se generará en todo el año 2019. | 21/10/2019 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 46,800 | CERs | Aposentadoria em nome da Unidas de 46.800 tCO2 para compensação das emissões totais dos escopos 1 e 2; e 12 % do Escopo 3, relativos ao inventário do ciclo de 2020, período: 01.01.2020 a 31.12.2020 | 22/06/2021 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 47,619 | CERs | Huella de Carbono de todo el ciclo de vida (“cradle-to-grave”) del producto Dekton® by Cosentino en 2020 que asciende a 23.926t. Carbon Footprint of the entire life cycle (“cradle-to-grave”) of the Dekton® by Cosentino product in 2020 amounting to 23.926t. | 16/04/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 1,200,000 | CERs | Not shared | 15/01/2021 | Attestation letter |
| 8474 | Maracanã Small Hydropower Project | Energy industries (renewable - / non-renewable sources) | Brazil | 2,586 | CERs | Purpose: Carbon footprint offset for the year 2021 of BANCO SANTANDER Beneficiary: BANCO SANTANDER | 16/12/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 2 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for April 2021 sales | 17/05/2021 | Attestation letter |
| 8500 | SHP ITAGUACU CDM PROJECT (JUN 1146), BRAZIL | Energy industries (renewable - / non-renewable sources) | Brazil | 62,400 | CERs | Beneficiary: ClimatePartner GmbH's clients Reason for Cancellation: Voluntary Cancellation on behalf of ClimatePartner GmbH's clients | 08/02/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action - TR 37 | 22/12/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Rachin Khanijo, VP, Marketing Eros Digital. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 18/01/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 375 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 1 795 245,00 kms of riders using UberX during January 2022 made by Anaconda Carbon. | 07/03/2022 | Attestation letter |
| 3057 | Qichun Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 16,088 | CERs | CO2-Neutralstellung der Kasseler Verkehrs- und Versorgungs-GmbH (KVV), Städtische Werke Netz + Service GmbH (NSG), Städtische Werke AG und der Kasseler Verkehrs-Gesellschaft (KVG)* im Zeitraum vom 01/2021 bis 12/2021. * Dies beinhaltet zusätzlich auch die Fahrleistungen, die von den von der KVG beauftragten Subunternehmen erbracht wurden. | 28/01/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 126 | CERs | Voluntary Cancellation of 126 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during third quarter (July-September) of 2020 | 05/02/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 165 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SOLARTE NACIONAL DE CONSTRUCCIONES (NIT 830.129.289-8 ), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 12,500 | CERs | Retired on behalf of Antarctica21's emissions for the period May 2020-April 2023 | 30/03/2022 | Attestation letter |
| 0085 | Hapugastenne and Hulu Ganga Small Hydropower Projects. | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 63,679 | CERs | Voluntary cancellation on behalf of Natural Capital Partners' client. | 30/11/2018 | Attestation letter |
| 1428 | Monomeros Nitrous Oxide Abatement Project | Chemical industries | Colombia | 339 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 13/09/2019 | Attestation letter |
| 1229 | Catalytic N2O destruction project in the tail gas of the nitric acid plant PANNA 3 of Enaex S.A. | Chemical industries | Chile | 157,346 | CERs | Voluntary cancellation of CERs in favor of iSi GmbH to offset GHG emissions | 21/06/2022 | Attestation letter |
| 0545 | Durban Landfill-gas-to-electricity project – Mariannhill and La Mercy Landfills | Waste handling and disposal | South Africa | 2,732 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions from its participation in these Carbon Funds. | 01/09/2020 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 498,000 | tCERs | Cancellation for conversion to VCUs | 23/12/2020 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 15,000 | CERs | Retired on behalf of ClimatePartner customers | 16/04/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 15 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 66 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de marzo 2022. | 24/05/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3,566 | CERs | Retirement – Beneficiary: Anaconda Carbon Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions of UberX during November 2019 for 16.780.365,80 kilometers made by Anaconda Carbon | 11/12/2019 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 34,112 | CERs | Voluntary cancellation of 34,112 CERs for the purpose of conversion to Gold Standard VERs for project GS5519. These have not been used for any offsetting purposes or mandatory or voluntary compliance purpose | 24/06/2020 | Attestation letter |
| 2341 | Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Cañaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia | Waste handling and disposal | Colombia | 1,926 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Transportempo SAS (NIT 800051673-7), in order to not cause the national carbon tax | 10/11/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 11 | tCERs | COMPENSAÇÃO DE EMISSÕES DO "CSN 3ª HRC EQUESTRIAN FESTIVAL 2022 + SELETIVAS DA JUVENTUDE CBH". DATA DO EVENTO: 06 A 10 DE ABRIL DE 2022. REALIZAÇÃO: HRC - HELVETIA RIDING CENTER. | 11/05/2022 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 4,608 | CERs | on behalf of GP-19 | 09/08/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,022 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by UNION TEMPORAL SISTUR TRANSURBANOS (NIT 900.297.577-7), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 81 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Matriz Administrativa, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Matriz Administrativa by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Professor Louis Lam” for Annual Dinner in 2021 (Transaction ID: 749) | 22/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir LAU Chi Keung” for Annual Dinner in 2021 (Transaction ID: 726) | 22/02/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 753 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 753 tons of CO2 associated with fossil fuels to be used by CONSTRUCCIONES EL CONDOR S.A. (NIT 890.922.447-4) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 498 | CERs | UPMSIC2019 – September Sales | 03/11/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mannings (Asia) Consultants Limited” for Annual Dinner in 2021 (Transaction ID: 700) | 18/02/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 315 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by BIMBO SA, NIT 830002366-0,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,309 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax. | 13/03/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 808 | CERs | Beneficiary: Cabify Mobility International, S.L. Purpose: Compensación huella Cabify 2 trimestre 2021 | 17/08/2021 | Attestation letter |
| 10431 | Improved cookstove program in Bangladesh supported by the Republic of Korea | Energy demand | Bangladesh | 2,338 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 02/03/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 270 | CERs | Voluntary compensation from Uber Mexico to offset GHG emissions made by A-CO2 | 16/09/2021 | Attestation letter |
| 4537 | DakRTih Hydropower Project, Vietnam | Energy industries (renewable - / non-renewable sources) | Viet Nam | 14,929 | CERs | Carbon credits retired by AzzeroCO2 on behalf of Fastweb Spa - estimated value of Scope 3 emissions related to use of products by customers in 2022 - third quarter | 14/09/2022 | Attestation letter |
| 0490 | Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co. | Chemical industries | Egypt | 1 | CERs | Voluntary cancellation in favour of iSi GmbH, Vienna, Austria | 18/06/2021 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 14,700 | CERs | Stilllegung im Auftrag der Energieagentur Ebersberg-München gGmbH, Kompensation der CO2-Emissionen des Landkreises München in 2020, Spende Klimaschutzprojekte Landkreis München 2020 | 30/12/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 101 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by EASYFLY S.A., NIT 900088915-7,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 9981 | Domestic Cooking Stoves substitution programme in Mozambique | Energy demand | Mozambique | 2,473 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 05/05/2021 | Attestation letter |
| 3632 | Wind power project at Gujarat by Powerica Limited | Energy industries (renewable - / non-renewable sources) | India | 21,136 | CERs | PROGAS GmbH & Co KG – KLIMA neutral | 01/07/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 500 | CERs | Retirement - Beneficiary: Asociacion de Servicios Medicos Costarricenses (ASEMECO); Retirement Reason Details: Cancelacion Voluntaria realizada por la Asociacion de Servicios Medicos Costarricenses (ASEMECO) para compensar sus emisiones de C02 equivalente correspondientes al ano 2019, como requerimiento para cumplir con su Programa de Carbono Neutralidad. | 23/10/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 199 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by AUGUSTEA GRANCOLOMBIA SAS, NIT 900142908-6,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,456 | CERs | Beneficiary: LOS ARALLANES, S.A. Retirement reason details: Voluntary Cancellation on behalf of Los Arallanes, S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st, 2018 to December 31st, 2018. | 08/05/2019 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 1,854 | CERs | Voluntary cancellation of 1,854 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-24 | 09/05/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 200 | CERs | Voluntary Cancellation of 200 CERs for transaction no. 627 on www.clpcarboncredits.com | 28/09/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon credits available for voluntary uses - TR 54 | 22/12/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 426 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by CEMEX TRANSPORTES DE COLOMBIA SA NIT 830078000-0, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 118 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00076795 | 30/09/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 5 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for August 2021 sales | 20/09/2021 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 105,285 | CERs | Retired on behalf of Natural Capital Partners' Clients | 30/05/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 27 | CERs | Voluntary Cancellation of 27 CERs for transaction no. 661 (14 CERs) and 663 (13 CERs) on www.clpcarboncredits.com | 22/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 381 | CERs | Retirement – Beneficiary: Distribuidora Florex Centroamericana, S.A. Retirement Reason Details: Voluntary cancellation on behalf of Distribuidora Florex Centroamericana, S.A.for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018 | 29/08/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 9,056 | CERs | Ueberkompensation Oekogas 2019 | 16/12/2020 | Attestation letter |
| 0328 | Dolowal, Salar and Bhanubhura Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 25,220 | CERs | Cancelled on behalf of Engie SA to offer a reduced carbon product to its B2B customers in france | 09/11/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 406 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by COLTUGS, NIT 900485260-4,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 2513 | Luoyang Landfill Site LFG Recovery to Electricity Project | Waste handling and disposal | China | 73,185 | CERs | Cancelled on behalf of STX client with ID number: POS-30481-39536 for 2022/2023 usage. | 16/03/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 48 | CERs | "To make event Carbon Neutral" | 06/02/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 47 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTADORES BELLA VILLA IOS (NIT 900.562.787-3), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 674 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Grupo Danissa para compensar 673.99 toneladas de CO2, correspondiente a las emisiones de GEI generadas durante el 2018 para cumplir con los requisitos del PPCN | 28/01/2021 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 74 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 74 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 74 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | “Voluntary cancellation of 50,000 CERs for the purpose of conversion to Gold Standard VERs from project GS5519. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose.” | 10/06/2021 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 1,860 | CERs | Voluntary cancellation to offset the GHG generated from operation of Shenzhen Dashi Intelligent Co., Ltd. in Shenzhen Nanshan District High-tech Village Wl Building A Block 5th floor from January 1,2021 to December 31,2021 | 10/10/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 6 | 22/12/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 73 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by CORONA - DESPACHADORA INTERNACIONAL DE COLOMBIA SAS NIT 860068121-6, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | Energy industries (renewable - / non-renewable sources) | Madagascar, Ethiopia, Kenya, Malawi, Mozambique, Nigeria, Uganda, Zambia, Chad, Dominican Republic, Côte d`Ivoire, Liberia, Rwanda, Sierra Leone, Namibia, Zimbabwe, Ghana, South Africa, Somalia | 12,218 | CERs | This cancellation is for usage in the Korea Offset Programme (in K-ETS) and Ecoeye is beneficiary of this cancellation | 21/02/2022 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 19,225 | CERs | "Becton, Dickinson and Company" for "Retired for 2021 sustainability goals" | 24/08/2021 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 2,521 | CERs | To Neutralize the Carbon Emission generated by the Office Building of Zhenjiang High-Tech Zone Administration in 2020 | 16/11/2021 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 1,438 | CERs | Cancelación de 1.438t CO2 correspondientes a las emisiones de la Flota de vehículos corporativa de Enagás S.A. durante el 2020 | 16/03/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Huakai | Cancelación voluntaria de 1tCO2 por viaje a Asturias y Cantabria Surf Camp | 22 - 29 agosto | 02/09/2020 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 10 | CERs | These CERs are being voluntarily cancelled to offset personal emissions from 2021 of the Spannagle family: Matt, Jits, Inka and Sidney. They have not been used for ny other mandatory or coluntary compliance purposes. CERs are cancelled from CPA001 to CPA007, from part of MP3c. | 08/09/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action - TR 43 | 22/12/2020 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 19 | CERs | Bitcoinforme SL I am offsetting the carbon footprint of my organization. | 18/08/2021 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 54 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00076397 | 30/09/2021 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 2 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00077657 | 30/09/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0)for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA (NIT 899.999.094-1) | 08/09/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mr YU Tak Cheung” for Annual Dinner in 2021 (Transaction ID: 735) | 22/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir PANG Yiu Hung, Eric” for Annual Dinner in 2021 (Transaction ID: 736) | 22/02/2021 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 2,821 | CERs | Retired on behalf of ISA INTERVIAL - Neutralización Servicio Gestión de Ruta 2020 - SCX ID 0111-E1783A93 | 01/02/2022 | Attestation letter |
| 7434 | Wind Power Project in Karnataka India | Energy industries (renewable - / non-renewable sources) | India | 15,000 | CERs | Credits were retired on behalf of Fly Victor's 2021 climate strategy. | 28/01/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 21 | CERs | these credits are retired on behalf of Furthr for its monthly subscribers between 15th January 2021 and 14th March 2021 | 22/03/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 48,617 | CERs | Cancelación voluntaria a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS (NIT 900497906-5) para neutralización de emisiones de gases de efecto invernadero por consumo de combustibles fósiles | 20/09/2021 | Attestation letter |
| 2148 | Chumporn applied biogas technology for advanced waste water management | Waste handling and disposal | Thailand | 1 | CERs | On behalf of Chumporn Palm Oil Industry Public Company Limited. | 09/07/2019 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 11,000 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of OTTO BAUMGART INDUSTRIA E COMERCIO S.A., to offset CO2 emissions related to the reported GHG Emissions from 2020. | 06/09/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 6 | CERs | Voluntary cancellation of 6 CERS to offset the CO2e emissions of “Maratón Powerade Monterrey 2018” which took place the 9th of December of 2018 in Monterrey, Nuevo León, México. | 03/06/2019 | Attestation letter |
| 0925 | EnviroServ Chloorkop Landfill Gas Recovery Project. | Waste handling and disposal | South Africa | 219,140 | CERs | The credits are cancelled for the specific purpose of being used in the South African Carbon Tax Offset Scheme. | 01/09/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 5,838 | CERs | Voluntary cancellation of 5,838 CERs to offset part of the CO2e emissions of Aerovías de México, S.A. de C.V. (Aeroméxico) generated during 2018 | 10/05/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 129 | CERs | Voluntary Cancellation of 129 CERs for transaction no. 574 on www.clpcarboncredits.com | 01/07/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 576 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of ALZU GROUP S.A. to offset emissions generated by the company operations during 2019. | 14/10/2020 | Attestation letter |
| 4449 | Monte Redondo Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 290 | CERs | Voluntary cancellation made by Eolica Monte Redondo S.A., on behalf of ENGIE Latin America, to offset CO2 emissions related to travel and organization of the events: U.camp 2019 - Santiago de Chile (240,3 tCO2e) ELS BU Latam 2019 - Mexico (48,9 tCO2e) | 26/11/2019 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 2,600 | CERs | Aposentadoria em nome da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S/A para neutralização das emissões dos escopos 1, 2 e 3 - 2021 / Retirement on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S/A to offset emissions from scope 1, 2 and 3 - 2021 | 16/06/2022 | Attestation letter |
| 8323 | Grid Connected Gas based Combined Cycle Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 9,269 | CERs | "DL Carbon Neutrality 2021” | 13/04/2022 | Attestation letter |
| 3779 | Accion Fraterna Biogas CDM project for rural communities in Anantapur, Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 18,547 | CERs | 2991 women from 146 villages in Andhra Pradesh have reduced 18,925 tonnes of GHG emissions by using Biogas units instead of firewood, kerosene or LPG. These Biogas units were built with generous contributions from IndiGo passengers who compensated a part of their travel emissions. | 09/06/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 343 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by INVERSIONES GLP SAS ESP NIT 900335279-0, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 4 | CERs | Communication RP | 05/04/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action - TR 35 | 22/12/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 45 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 45 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 45 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 18/11/2021 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 72,831 | CERs | “Firstcon GmbH” | 20/12/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10,000 | CERs | Retirement – Beneficiary: Distribuidora La Florida S.A. • Retirement Reason Details: “Cancelación voluntaria realizada por Anaconda Carbon a favor de Distribuidora la Florida S.A (3-101- 295868) para compensar las emisiones GEI generadas por la huella operacional en Costa Rica durante el año 2020, para cumplir con los requisitos del PPCN.” | 19/04/2021 | Attestation letter |
| 1145 | 8.75MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 376 | CERs | Retirement Beneficiary - Dryrobe Limited | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 26/07/2021 | Attestation letter |
| 2692 | Bethlehem Hydroelectric project | Energy industries (renewable - / non-renewable sources) | South Africa | 1,000 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019. The offsets are to be listed into the COAs Registry account number 101024 of Bethlehem Hydro Proprietary Limited | 19/10/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 17 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 73 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de Noviembre 2021. | 24/02/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 68 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Santiago - Chile, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Santiago - Chile by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,453 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Jundiaí 2 - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Jundiaí 2 - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Dr Jitendra Das,Director FORE School of Management. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 180 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de CRAISA para compensar las emisiones GEI generadas de su operación durante el periodo 2020 y cumplir con la normativa del PPCN | 29/11/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1 | CERs | Offset on behalf of Camara de Comercio de Santiago | 11/01/2022 | Attestation letter |
| 7577 | Use of Charcoal from Renewable Biomass Plantations as Reducing Agent in Pig Iron Mill in Brazil | Metal production | Brazil | 10,515 | CERs | Per Eco-Carbonne's cancellation request dated January 26, 2017 | 22/03/2019 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 599 | CERs | To Neutralize the Carbon Emission generated by Beijing Poly Tong Real Estate Development Co.,Ltd. In 2021. | 21/10/2022 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 50 | CERs | To Neutralize the Carbon Emission generated by China Shipbuilding Industry Corporation Offshore Wind Power Co.,Ltd. in 2021. | 21/10/2022 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 41,183 | CERs | Klimaneutralstellung Strom-Produkte der meistro Energie GmbH, 2021 | 01/10/2021 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 75,000 | CERs | “Retired on behalf of Simply Energy ABN 67 269 241 237 as part of its carbon neutral commitments under Climate Active (retail electricity) for products sold from 1 January 2021” | 22/10/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,772 | CERs | Retirement - Beneficiary: Tostadora de Cafe 1820 ; Retirement Reason Details: Cancelacion Voluntaria realizada porTostadora de Cafe 1820 para compensar sus emisiones de C02 equivalente correspondientes al ano 2019. | 02/02/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 55 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - Escritório Brasília. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 3065 | Hunan Yueyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 44,093 | CERs | Retired on behalf of Everflow Limited to offset our own carbon footprint for the four years from 2020 to 2023 inclusive, and to offset the carbon footprint of our customers’ volumetric water and wastewater services provided via our wholesalers for the three years from 2021 to 2023 inclusive. | 14/02/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 215 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 215 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 215 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 28/04/2020 | Attestation letter |
| 7100 | Los Cocos II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 44,000 | CERs | Due to Virgin Voyages’ ambition to take immediate action on climate change, Virgin Voyages has committed to carbon neutrality for its direct emissions footprint through the purchase of high quality carbon offsets. Virgin Voyages has also prioritized supporting offset projects that are located in the geographic regions where the company sails and where its Crew call home. | 14/06/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 544 | CERs | Voluntary Cancellation of 544 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during the third quarter (July – September) of 2018. | 04/04/2019 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 24,529 | CERs | Offsetting emissions occurred in 2023 – Van Kessel Olie B.V | 16/09/2022 | Attestation letter |
| 10288 | Solar Power Project by Fortum FinnSurya (EKIESL-CDM.February-15-01) | Energy industries (renewable - / non-renewable sources) | India | 17,248 | CERs | ‘Voluntary cancellation of 17248 CERs for the purpose of conversion to Gold Standard VERs from project GS4533. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose.’ | 10/06/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 14 | CERs | GSE Foundation | 10/03/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 7 | tCERs | Compensação de Emissões de GEE, referente ao ano de 2021 da empresa NEXT-ESG PARTICIPAÇÕES SA. | 11/05/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 8 | CERs | Voluntary cancellation in favour of Puma Energy Colombia Combustibles SAS (NIT 900497906-5) for the neutralization of the GHG emissions, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 2692 | Bethlehem Hydroelectric project | Energy industries (renewable - / non-renewable sources) | South Africa | 108,261 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019. The offsets are to be listed into the COAs Registry account number 101024 of Bethlehem Hydro Proprietary Limited | 21/10/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 402 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 03/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 997 | CERs | 2020-0508 | 2020 | 11/11/2020 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 271 | CERs | Retirement Beneficiary :Tambuzi, Reason - I want to contribute to Climate Action. | 10/03/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 513 | CERs | I am offsetting my organization's greenhouse gas emissions | 29/05/2019 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 812 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 812 tons of CO2 associated with fossil fuels to be used by CONCRETOS ARGOS (Nit 860.350.697-4) in order not to cause the national carbon tax | 15/09/2022 | Attestation letter |
| 3970 | Southern Nicaragua CDM Reforestation Project | Afforestation and reforestation | Nicaragua | 8,365 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 18/07/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 26 | CERs | Pedro Silveira MOTIVO DE LA COMPENSACIÓN Offsetting the carbon footprint of my company's trips | 17/12/2021 | Attestation letter |
| 0373 | São João Landfill Gas to Energy Project (SJ) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 1,000 | CERs | CERs cancelled with the intention to transfer to the VCS Program on behalf of BlockC but due to transfer rejection by VERRA, the cancelled CERs were attributed as follows: On behalf of Captalys, 338 CERs are being voluntarily cancelled in order to offset its GHG emissions in 2020; On behalf of Wongtschowski & Zanotta Advogados, 212 CERs are being voluntarily cancelled in order to offset its GHG emissions in 2020; On behalf of Dengo Chocolates, 245 CERs are being voluntarily cancelled in order to offset its GHG emissions in 2020. On behalf of BlockC, 205 CERs are being voluntarily cancelled to offset GHG emissions from other customers. CERs cancelados com a intenção de transferência para o Programa VCS em nome do BlockC, mas devido à rejeição da transferência pela VERRA, os CERs cancelados foram atribuídos da seguinte forma: Em nome da Captalys, 338 CERs estão sendo voluntariamente cancelados a fim de compensar suas emissões de GEE em 2020. Em nome da Wongtschowski & Zanotta Advogados, 212 CERs estão sendo voluntariamente cancelados a fim de compensar suas emissões de GEE em 2020. Em nome da Dengo Chocolates, 245 CERs estão sendo voluntariamente cancelados a fim de compensar suas emissões de GEE em 2020. Em nome da BlockC, 205 CERs estão sendo voluntariamente cancelados a fim de compensar emissões de GEE de outros clientes. | 06/04/2021 | Attestation letter |
| 5257 | Combined cycle natural gas based grid connected power plant at Jegurupadu, India | Energy industries (renewable - / non-renewable sources) | India | 401 | CERs | For Bansal Ship Breakers Pvt. Ltd. Plot No.25, SRY, Alang, Bhavnagar, Gujarat-364081 (India) Reason to offset - I am offsetting greenhouse gas emissions for my company Year- 2020-2022 | 20/05/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 65 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Antojese Travel for all air tickets, hotels and car rentals bookings issued for the period from July 1st to December 31th 2020. | 11/01/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 15,074 | CERs | Purpose: BBVA Mexico's corporate carbon emissions 2020. Beneficiary: BBVA Mexico | 18/01/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 34,767 | CERs | Voluntary cancellation in favour of ZEUSS PETROLEUM S.A (NIT 811.043.174-1) for the neutralization of the GHG emissions associated with the fossil fules in order to not cause the national carbon tax according to Dec. 926 de 2017. | 26/11/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 24,995 | CERs | "2018-0526 | 2020" | 26/10/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,014 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by CEMEX COLOMBIA SA, NIT 860002523-1,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Mitigación de la Huella de Carbono de Alma Angélica Mendoza Azpeitia | 05/05/2022 | Attestation letter |
| 6571 | Wind Power Plants Seabra, Novo Horizonte and Macaúbas CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 30,385 | CERs | On behalf of Lenovo Clients 1 August 2022 – 31 August 2022, Program Managed by Lenovo. | 26/08/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6 | CERs | Evento BMW Copa del Rey de vela | 17/12/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 200 | CERs | CERs Donated by Zhejiang Qingshan Steel Co.,Ltd to offset GHG Emissions generated from First World Conference on Globally Important Agricultural Heritage Systems hosts by Qingtian government | 13/07/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 827 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by INGENIO CARMELITA NIT 891900196-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 162 | CERs | Voluntary cancellation by BANK OF HANGZHOU CO.,LTD. JIANGCHENG SUB-BRANCH to offset GHG Emissions generated from its daily operation in 2021 | 22/03/2022 | Attestation letter |
| 1906 | Shenyang Laohuchong LFG Power Generation Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
China | 163,406 | CERs | Voluntary cancellation to offset scope 1 emissions from shipping operations. | 22/12/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 22 | CERs | Retirement – Beneficiary: Anaconda Carbon ; Retirement Reason Details: Voluntary cancellation made by Anaconda Carbon on behalf of Antojese Travel for all air tickets, hotels and car rentals bookings issued for the period from January 1st to December 31st 2019 | 28/01/2020 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 42,532 | CERs | Huella de Carbono de todo el ciclo de vida del producto Dekton® by Cosentino en 2019. Carbon Footprint of the entire life cycle of the Dekton® by Cosentino product in 2019. | 09/09/2020 | Attestation letter |
| 3061 | Tongcheng Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 17,728 | CERs | Voluntary cancellation on behalf of Carbonfund.org Foundation partner | 17/01/2022 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 15,000 | CERs | Retired on behalf of Star Garments Group, Sri Lanka towards their ZeroCarbon® Certification 2021 | 16/02/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “WSP (Asia) Limited” for Annual Dinner in 2021 (Transaction ID: 703) | 18/02/2021 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 144,814 | CERs | This request is submitted to cancel the 144,814 CERs of Sihwa Tidal Power Plant CDM Project and use them as offset in Korean Emissions Trading Scheme. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 09/05/2019 | Attestation letter |
| 5112 | Green House Gas Abatement through installation of a wind power project for export to the Grid. | Energy industries (renewable - / non-renewable sources) | India | 87,989 | CERs | Retired on behalf of ClimatePartner’s customers. | 24/02/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 238 | CERs | Région NPC | 05/04/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Convención de Directivos ACCIONA Construcción 2020 | 02/08/2021 | Attestation letter |
| 8344 | Hebei Wuqiao Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 70 | CERs | Cancelled to neutralize 2142 pieces of Maxi EU AC W22-C5 produced from 2022-01-01 to 2022-06-30 | 05/09/2022 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 6,486 | CERs | “Voluntary offset retirement made by ecosecurities on behalf of Banco Bradesco S.A. to compensate 6486 tCO2e corresponding to its operational GHG emissions from Scope 1, 2 and 3 generated in 2019.” | 29/03/2021 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 98 | CERs | Voluntary cancellation on behalf of Pricerite Home Limited to offset its carbon footprint | 23/09/2022 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 10,000 | CERs | "Retired on behalf of N. Ranga Rao and Sons (Pvt) Ltd, India towards their ZeroCarbon® Certification 2021-22" | 16/02/2022 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 7,129 | CERs | Naturgas – Verbrauch 2021 CO2-neutrales Erdgas des Energieversorgers: Städtische Werke AG Königstor 3-13 34117 Kassel Deutschland (Germany) Kompensation der CO2-Emissionen aus der Verbrennung von Erdgas für Kunden der Städtische Werke AG. | 30/03/2022 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 15,000 | CERs | Retired on behalf of Evonik Operations GmbH, Business Line Oil Additives. | 05/01/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 35 | CERs | These credits are retired on behalf of Furthr for its monthly subscribers between 15th October 2020 and 14th January 2021. | 19/01/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,397 | CERs | 2020-0035 | 2020 | 11/11/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 37,782 | CERs | Compensation of carbon footprint for year 2018 of Acciona Energia | 11/06/2019 | Attestation letter |
| 8244 | Moldova Community Forestry Development Project | Afforestation and reforestation | Republic of Moldova | 35,396 | tCERs | Cancellation requested by Syngenta Foundation for Sustainable Agriculture per their request dd. October 27, 2015 | 16/09/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,325 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT-860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 12/08/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 169 | CERs | Retirement- Beneficiary: FACO (Franz Amrhein y Compañía) S.A. Retirement reason details: Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compañía) S.A. to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of March 2019. For more information please visit: www.hondacostarica.com/co2 | 16/05/2019 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 524 | CERs | Enabling everyday climate action through Doconomy | 10/01/2020 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 104 | CERs | CITEOS | 10/03/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 123 | CERs | Voluntary cancellation to offset the GHG emissions generated during September 20, 2021 to March 30, 2022 from the operation of HUANQIU DADAO, Tongzhou District, Beijing by Beijing BCEG Guotong Construction Engineering Co., LTD. | 07/04/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 55 | CERs | Retirement – Beneficiary: Anaconda Carbon ; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 218 769,0 kms of riders using UberECO during April 2020 made by A-CO2 | 15/05/2020 | Attestation letter |
| 2475 | LG Chem Naju plant fuel switching project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 55,162 | CERs | We are requesting Voluntary cancellation of total CERs in order to switch them into KOCs(Korea Offset Credets) by submitting an attestation letter to Korea government under Korea ETS. | 23/11/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 534 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Inmobiliaria | 12/05/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 52 | CERs | MV2566 | 2020 | 16/12/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,497 | CERs | 2019-0894 | 2020 | 09/11/2020 | Attestation letter |
| 5992 | Inner Mongolia China Water Group Huade Niujiafangzi Wind Farm 49.5MW Project | Energy industries (renewable - / non-renewable sources) | China | 51,772 | CERs | Entwertung der CO2-Zertfikate (CP2 CER) für Grüngasprodukte von Eprimo | 27/08/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 320 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by EASYFLY S.A. NIT 900088915-7, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6 | CERs | Mitigación de la Huella de Carbono de Lilian Isabel Morales Nava | 05/05/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 100 | CERs | Compensación voluntaria de emisiones mediante el manejo responsable de residuos de la empresa ESSITY HIGIENE Y SALUD MÉXICO, S.A. de C.V. planta Monterrey (Octubre-Diciembre 2020) | 22/02/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 1,200 | CERs | These carbon credits have been bought and retired on behalf of CarbonClick users for the purpose of offsetting their emissions. | 20/11/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 614 | CERs | On behalf of Cool Effect. | 09/09/2019 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 400 | CERs | OFFSET ON BEHALF OF: LIMPIEZAS LAS HERENCIAS CASTELLANAS REASON FOR COMPENSATION: Compensación huella 2021 | 06/05/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 19,232 | CERs | Offset on behalf of Santander Facility Management España S.L.R. Reason for Compensation: Compensación Huella Grupo Santander España | 11/01/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,850 | CERs | Retiro a favor de PRIMAX COLOMBIA identificado con NIT 860002554-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles. TON Co2 generadas 1.850. Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 14/10/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 135 | CERs | Beneficiary: FACO (Franz Amrhein y Compania S.A.) Retirement reason: Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compania S.A.) to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of February 2019. For more Information please visit: www.hondacostarica.com/co2 | 17/04/2019 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 30 | CERs | Voluntary Cancellation of 30 CERs for transaction no. 355 (15 CERs), 356 (10 CERs) and 357 (5 CERs) on www.clpcarboncredits.com | 24/06/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 165 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 12/10/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6,016 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de INOLASA para compensar las emisiones GEI generadas por la empresa durante el año 2018 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático. | 30/10/2019 | Attestation letter |
| 8591 | Wind power project in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 69,214 | CERs | Jera Global Markets | 12/07/2019 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 204 | CERs | Voluntary cancellation to offset the GHG (estimated) generated from operations of BANK OF GUANGZHOU CO.,LTD FOSHAN JIHUA SUB-BRANCH from January 1, 2022 to December 31, 2024. | 09/02/2022 | Attestation letter |
| 5293 | Hebei Shangyi Dongshan Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 9,715 | CERs | Cancelled on behalf of Energie Direct Mineralölhandelsges.m.b.H. | 25/01/2019 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 487 | CERs | Retired on behalf of Planetly GmbH. | 05/05/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 50 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by VEOLIA ASEO SUROCCIDENTE (NIT 805.015.900-1, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 3 | CERs | This voluntary cancellation of CERs was made on behalf of DHL Logistics Brazil / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 2,300,000 | CERs | Cancelamento voluntário em favor da IMETAME TERMELÉTRICA LTDA. (CNPJ 23.857.764/0001-01) com a finalidade de neutralizar emissões do ativo UTE Prosperidade III (UTE.GN.BA.033467-7.03), de acordo com o previsto no DESPACHO Nº 3.397, DE 4 DE DEZEMBRO DE 2020 e na RESOLUÇÃO AUTORIZATIVA Nº 9.711, DE 9 DE MARÇO DE 2021, ambos publicados pela Agencia Nacional de Energia Elétrica (ANEEL), seguindo as premissas do Plano de Mitigação e Compensação de Emissões de Gases de Efeito Estufa aprovado pelo MME. | 19/10/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 20 | CERs | In the months 15th June - 14th August Furthr retired 20 tons of carbon with Carbonbay | 27/08/2020 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 11/02/2021 | Attestation letter |
| 9176 | Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” | Energy demand | Honduras | 443 | CERs | Retired on behalf of Luftfartsverket to offset emissions generated by our operations during 2017. | 21/12/2018 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3,000 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de BANCO MACHALA para compensar las emisiones GEI generadas por su operación en el periodo 2020. | 28/12/2021 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 5,000 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 12/12/2018 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 471 | CERs | CO2-neutraler Erdgasbezug für die durch die Hamburg Team Property Management GmbH verwalteten Liegenschaften in 2022-2025 | 08/12/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 2,929 | CERs | Aposentadoria permanente de circulação do mercado em nome da XP Inc. referente as emissões corporativas de Escopo 3 do ano de 2021 / Retirement on behalf of XP Inc. referring to corporate emissions of Scope 3 of the year 2021. | 15/09/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2018-0355 | 2020 | 11/11/2020 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 9,795 | CERs | Credits allocated to 667 Technology GmbH/ Planetly | 25/03/2020 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 69 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 69 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: June 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 69 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Junho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 08/08/2022 | Attestation letter |
| 3970 | Southern Nicaragua CDM Reforestation Project | Afforestation and reforestation | Nicaragua | 6,971 | tCERs | Per Eco-Carbonne's cancellation request dated January 26, 2017 | 18/07/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación Carbono | Costa Rica 5-17 Diciembre | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 10/01/2022 | Attestation letter |
| 3303 | CGN Inner Mongolia Huitengliang Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 36,180 | CERs | Cancelled on behalf of Energie Direct Mineralölhandelsges.m.b.H. | 25/01/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 404 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of May 2019 | 12/06/2019 | Attestation letter |
| 9935 | Improved Cook Stove Project 2, Nkhata Bay District, Malawi | Energy demand | Malawi | 500 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 30/04/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Ryan Lam” for Annual Dinner in 2021 (Transaction ID: 724) | 22/02/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 24 | CERs | Voluntary Cancellation of 24 CERs for transaction no. 640, 645 to 649 on www.clpcarboncredits.com | 28/09/2020 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 5,286 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften "Wohnen I" der Deutsche Investment Kapitalverwaltungsgesellschaft mbH in 2025 | 22/10/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 167 | CERs | Purpose and/or the beneficiary of the cancellation: Pozzi-Arosio Reason for cancellation: Offsetting of 2021 Scope 1 and 2 emissions | 19/10/2022 | Attestation letter |
| 2600 | Amaime Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 20,000 | CERs | Voluntary cancellation in favor of EMPRESA COLOMBIANA DE PETRÓLEOS SA - ECOPETROL SA (Nit 899999068-1) for neutralization of the GHG emissions, in orden to not cause the national carbon tax. | 11/03/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 10,222 | CERs | 2020-0079 | 2020 | 09/11/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 25 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - Escritório Chile. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 6003 | Wind power project by Sterling Agro Industries Ltd. | Energy industries (renewable - / non-renewable sources) | India | 74,258 | CERs | “On behalf of Lenovo Clients 3 June 2022 – 30 June 2022, Program Managed by Lenovo.” | 30/06/2022 | Attestation letter |
| 10238 | 10MW Solar Power Project (EnvironmentFirst-213) | Energy industries (renewable - / non-renewable sources) | India | 56,610 | CERs | “Retired on behalf of EcoAct’s client - Y2022-9672” | 30/05/2022 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 13,699 | CERs | Retired on behalf of Adyen N.V. for offsetting purposes. | 28/11/2019 | Attestation letter |
| 1052 | Chacabuquito Hydroelectric Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1,522 | CERs | BP Technology Ventures Limited requested IBRD as Trustee of the Carbon Funds to cancel all emission reductions resulting from its participation in Chile Chacabuquito Project (CDM Ref# 1052) per instructions in Cancellation Letter dated 14/01/2021. | 03/02/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 6,345 | CERs | Retiro a favor de TERPEL S.A identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 6.345 Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1,000 | CERs | Klimapositiver Geschäftsbetrieb der MATSEN CHEMIE AG und klimaneutrale Chemieprodukte. Dieses Zertifikat bestätigt hierzu die Neutralisierung von 1000 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 1000 Gold Standard CERs aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 19/07/2022 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 48,000 | CERs | Motivo: Compensación Huella de Carbono 2022 Titular: Prosegur Gestión de Activos, S.L.U. | 20/01/2022 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 25,941 | CERs | to offset the direct and energy indirect greenhouse gas emissions made by Dongguan Paihong Industry Co., Ltd. in 2021 | 15/09/2022 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 1,633 | CERs | CERs cancelled to render EBRD’s operations in 2018 carbon neutral | 11/02/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 109 | CERs | Compensación de las emisiones de GEI generadas en la XXXVI Convención de La Cámara Nacional de la Industria de Conservas Alimenticias (CANAINCA) 2022. | 31/05/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 12,390 | CERs | 2019-1563 | 2020 | 09/11/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 15 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Silence | 12/05/2022 | Attestation letter |
| 2486 | Conversion of SF6 to the alternative cover gas SO2 at RIMA magnesium production | Metal production | Brazil | 8,089 | CERs | This operation of voluntary cancellation of Certified Emission Reductions units issued by the Clean Development Mechanism is made for: “Carbon credits retired from AzzeroCO₂ on behalf of Danone Nutricia SpA - Voluntary offset of GHG emissions from production and end-of-life of Food & Milk Mellin product's packaging (sales 2021)” | 08/04/2022 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 67,331 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 11/10/2019 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 182 | CERs | Voluntary cancellation in favours of Distribuidora Andina de Combustibles SAS (NIT 8600002554-8) for neutralization of the GHG emissions associated, to be used by Coltugs (NIT 900485260-4), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 207 | CERs | Voluntary Cancellation of 207 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during second quarter (April-June) of 2020. | 18/11/2020 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 2,217 | CERs | Voluntary cancellation to offset the GHG generated from operation of The Crystal Palace Hotel Tianjin in No.28, Youyi Road, Hexi district, Tianjin from January 1,2021 to December 31. | 20/07/2022 | Attestation letter |
| 10379 | Wonju Landfill Gas Recovery Project for Electricity Generation |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 18,181 | CERs | To transfer and use CERs as Korean Offset Credit | 25/06/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 388 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 388 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 388 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 21/02/2019 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 90 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 90 ton of greenhouse gas (GHG) emissions of the CBO Anita vessel fuel consumption.” Reference month: February 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 90 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Anita.” Mês de referência: Fevereiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 24/03/2022 | Attestation letter |
| 0328 | Dolowal, Salar and Bhanubhura Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 650 | CERs | Bristlecone India Limited & Bristlecone Inc, is offsetting their company’s emission to become Carbon-Neutral for year 2021-22 (i.e. FY22) | 07/03/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 1,257 | CERs | Voluntary cancellation to offset the GHG generated from operation of YINHUA FUND MANAGEMENT CO.,LTD. and branches from January 1, 2021 to December 31, 2021. | 06/05/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 18,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT 901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 12/08/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 100,000 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles. | 20/01/2022 | Attestation letter |
| 8344 | Hebei Wuqiao Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 31 | CERs | Cancelled to neutralize the Carbon Emissions generated by Autel New Energy Co., Ltd. from 2022-01-01 to 2022-06-30 | 05/09/2022 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 50,030 | CERs | retired on behalf of FZ | 30/06/2022 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 175,476 | CERs | For DL 2021 Carbon Neutrality. | 07/01/2022 | Attestation letter |
| 8480 | Distribution of ONIL Stoves—Guatemala | Energy demand | Guatemala | 60,287 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 09/08/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 30 | CERs | OFFSET ON BEHALF OF: Pure Proof Of Steak REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 25/02/2022 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 626 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 4,906 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | Retired for Dilmah Ceylon Tea Company PLC. | 03/03/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 40 | CERs | Festival International du Film | 05/04/2022 | Attestation letter |
| 3858 | Nam Ngan Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 10,240 | CERs | Retired on behalf of Lindblad Expeditions to achieve carbon neutrality | 15/11/2021 | Attestation letter |
| 9977 | West African Biodigester Programme of Activities | Energy industries (renewable - / non-renewable sources) | Benin, Burkina Faso | 24,448 | CERs | CERs that the UK Department for Business, Energy and Industrial Strategy (BEIS) purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated June 03,2020. | 05/06/2020 | Attestation letter |
| 1366 | Biomass generation project, in Sheyang county, Jiangsu province, P.R. China | Energy industries (renewable - / non-renewable sources) | China | 100,000 | CERs | Voluntary Cancellation on behalf of IGS Energy Carbon-Neutral Natural Gas customers for 2022 | 14/01/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 31,366 | CERs | Wah Kwong Maritime Transport Holdings Limited for 2021 Internal Carbon Offset | 15/06/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 11,815 | CERs | OFFSET ON BEHALF OF: Banco Santander Argentina SA Huella Banco Santander Argentina | 03/06/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 42 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Popular Pensiones para compensar las emisiones GEI generadas por la huella operacional en Costa Rica durante el año 2020, para cumplir con los requisitos del PPCN. | 12/05/2021 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 171,904 | CERs | Voluntary cancellation of 171,904 CERs for the purpose of conversion to Gold Standard VERs from project GS4426. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 21/06/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,464 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ESTRELLA INTERNATIONAL ENERGY SERVICE (NIT 860.515.770-4), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 10415 | Clean Energy Program Supported by Republic of Korea | Energy demand | Myanmar | 205,369 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 20/05/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 32,703 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 13/09/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 300,000 | CERs | Retirement on behalf of Friedrich Scharr KG. | 30/06/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,197 | CERs | 2019-0509 | 2020 | 11/11/2020 | Attestation letter |
| 4466 | Uganda Nile Basin Reforestation Project No.5 | Afforestation and reforestation | Uganda | 2,100 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 16/11/2020 | Attestation letter |
| 0835 | Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
Republic of Korea | 9,504 | CERs | It is to be offset for domestic carbon emission trading in South Korea. | 03/07/2019 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Mitigación de la Huella de Carbono de Francisco Octavio Ibañez Moreno | 09/06/2022 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 30,000 | CERs | This certificate represents the retirement of carbon credits equivalent to the carbon emissions generated during the manufacture process of Radar brand of tires from January 2022 to December 2022 | 27/07/2022 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 1 | CERs | Cancelled in compliance with Air Protection Law in the Czech Republic | 25/01/2021 | Attestation letter |
| 3056 | Poyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 33,468 | CERs | SGS Société Générale de Surveillance SA - 2021 offsetting | 28/02/2022 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 86,511 | CERs | 17er Oberlandenergie GmbH – CO2 neutrales Erdgas | 18/11/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1 | CERs | OFFSET ON BEHALF OF: CLIMATETRADE SL REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 04/02/2022 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 18,578 | tCERs | Cancellation for conversion to VCUs | 30/12/2020 | Attestation letter |
| 3880 | (ABGSPL): Methane recovery in waste water treatment & Methane/Biomass Energy Generation Project | Energy industries (renewable - / non-renewable sources) | India | 10,000 | CERs | “Retired on behalf of OVO Energy to comply with with Climate Active certification.” | 19/04/2022 | Attestation letter |
| 0925 | EnviroServ Chloorkop Landfill Gas Recovery Project. | Waste handling and disposal | South Africa | 54,099 | CERs | The credits are cancelled for the specific purpose of being used in the South African Carbon Tax Offset Scheme. | 21/04/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 80 | CERs | For Furthr’s subscribers between 15th May - 14th September | 25/10/2021 | Attestation letter |
| 2347 | 150 MW grid connected Wind Power based electricity generation project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 12,400 | CERs | Purpose: "Voluntary cancellation in favor for offsetting GHG emissions of the Asian Development Bank’s Headquarters in Manila, Philippines for 2019" Beneficiary: "Asian Development Bank" | 14/09/2020 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 42,264 | CERs | On behalf of Interstate Gas Supply, Inc. (for IGS Carbon-Neutral Natural Gas customers for 2021) | 25/11/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 85 | CERs | Compensación voluntaria a favor de EMPRESAS MELO, S.A. por la neutralización de 85tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100,000 | tCERs | Carbon credits avaliable for voluntary uses - TR 2 | 22/12/2020 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 3,370 | CERs | "Pure Leapfrog_AA2021" | 23/03/2022 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 146 | CERs | Cancelación de créditos para abatir Emisiones de Flota vehicular operativa VEMO, alcances 1 y 2. Cancellation of credits to reduce Emissions of the VEMO operational vehicle fleet, scopes 1 and 2. | 04/07/2022 | Attestation letter |
| 4930 | Vaayu India Wind Power Project in Tamilnadu | Energy industries (renewable - / non-renewable sources) | India | 9,228 | CERs | Voluntarily cancellation of 9,228 CERs for conversion to Gold Standard VERs for project GS4425. These units have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 06/07/2020 | Attestation letter |
| 2600 | Amaime Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,022 | CERs | Voluntary cancellation in favor of EMPRESA COLOMBIANA DE PETRÓLEOS SA - ECOPETROL SA (Nit 899999068-1) for neutralization of the GHG emissions, in orden to not cause the national carbon tax. | 11/03/2020 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 18,745 | CERs | CO2-Kompensationen von Produkten oder diversen Klimaschutzmaßnahmen der Kasseler Verkehrs- und Versorgungs- GmbH (KVV) sowie allen Beteiligungsgesellschaften und Allianzen der KVV. | 19/05/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 37 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES INTEGRADOS METROPOLITANOS (NIT 900.297.797-0, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 9472 | Chakala wind power project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 15,996 | CERs | Jera Global Markets | 12/07/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 274 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES CENTRO VALLE (NIT 890.301.071-4 , project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 500 | tCERs | Cancelled on Behalf of Norauto And the program “programa dos ruedas un árbol” | 20/02/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 946 | CERs | Nordqvist compensation for 2021, part 1 | 04/04/2022 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 40,000 | CERs | Retired on behalf of ClimatePartner´s customer #53687 | 08/10/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1,200 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EUROMOBILIA S.A. para compensar las emisiones GEI generadas durante el año 2020 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 25/02/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 408 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 408 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 408 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 843 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 4 036 090,0 kms of riders using UberX during July 2020 made by A-CO2 | 10/08/2020 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 35,354 | CERs | Voluntary cancellation made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of Banco Itaú SA, to offset CO2 emissions related to the reported GHG Emissions from 2018. | 10/01/2020 | Attestation letter |
| 2165 | Rialma Companhia Energética III S/A. – Santa Edwiges III Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 32,262 | CERs | On behalf of WeNow’s customers | 28/11/2018 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 16/02/2022 | Attestation letter |
| 6560 | Patrind Hydropower Project | Energy industries (renewable - / non-renewable sources) | Pakistan | 266,635 | CERs | This request is submitted to cancel the CERs issued from Patrind Hydropower Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation ("K-water"). | 12/08/2021 | Attestation letter |
| 9124 | Grid connected natural gas based power project in Raigad District, Maharastra, India | Energy industries (renewable - / non-renewable sources) | India | 43,162 | CERs | This is because an ERPA has been signed with a Korean entity, and the committed CERs are being cancelled so to as transfer into KOC | 07/12/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 100 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 399 865,65 kms of riders using UberECO during September 2020 made by A-CO2 | 14/10/2020 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 1,000 | CERs | Meliá Hotels International, S.A,:Programa Meliá Rewards | 20/11/2020 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 252 | CERs | PURPOSE/BENEFICIARY: MR. MASAYOSHI SHIBAYAMA - FUJIKAGU INDUSTRIES, INC.- HEADQUARTERS OFFICE AT 1 KAMISUGO MIYOSHI NISHIKAMO, AICHI 470-0024, JAPAN REASON FOR RETIREMENT: OFFSET REMAINING CARBON FOOTPRINT FROM SCOPE 1, SCOPE 2 AND PARTIAL SCOPE 3 CARBON EMISSIONS DURING THE 2020 REPORTING YEAR | 27/09/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon credits available for voluntary uses - TR 56 | 22/12/2020 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,534 | CERs | Voluntary cancellation in favor of Distribuidora Andina de Combustibles S.A (NIT 860002554-8) for neutralization of the GHG emissions associated with fossil fuels used by CEMEX TRANSPORTES (NIT 830078000-7), in order to not cause the national carbon tax. | 13/12/2018 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 343 | CERs | Voluntary cancellation of 343 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-5 | 25/02/2022 | Attestation letter |
| 3520 | Federal Intertrade Haiyuan Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 5,155 | CERs | Retirement on behalf of ClimatePartner GmbH | 10/07/2020 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 150,000 | CERs | IFood.com Agencia de Restaurantes Online S.A. CNPJ 14.380.200/0001-21 voluntary initiative to offset Greenhouse Gas emissions (GHG) and to mitigate the impacts on the climate change causes. / Iniciativa voluntaria do IFood.com Agencia de Restaurantes Online S.A. CNPJ 14.380.200/0001-21 para compensar as emissões de Gases de Efeito Estufa (GEE) e mitigar os impactos sobre as causas das mudanças climáticas. | 15/09/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 294 | CERs | Retired for HKIE Civil Division’s Souvenir to Guests for Session 2020 and 2021 (14 CERs to each Guest) (from Transaction ID: 751 to 771) | 22/02/2021 | Attestation letter |
| 1026 | A.T. Biopower Rice Husk Power Project in Pichit, Thailand | Energy industries (renewable - / non-renewable sources) | Thailand | 33,235 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S.A. | 27/09/2021 | Attestation letter |
| 8198 | 21 MW Wind energy farm at Palladam, TamilNadu by HZL | Energy industries (renewable - / non-renewable sources) | India | 59 | CERs | These credits are retired on behalf of Furthr for its monthly subscribers between 15th April 2021 and 14th May 2021 | 01/06/2021 | Attestation letter |
| 10286 | Brazilian PoA for NAMA incentivized NCRE Projects | Energy industries (renewable - / non-renewable sources) | Brazil | 17,008 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CPA 10286-P1-0004-CP1: Paracatu Solar Power Complex, fully owned by ENGIE Solar Paracatu Geração Centralizada Holding S.A., on behalf of ITAÚ UNIBANCO S.A., to offset CO2 emissions related to the reported GHG Emissions from 2019. | 08/01/2021 | Attestation letter |
| 0258 | Nueva Aldea Biomass Power Plant Phase 1 | Energy industries (renewable - / non-renewable sources) | Chile | 74,508 | CERs | 17er Oberlandenergie GmbH – CO2 neutrales Erdgas | 18/11/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 24,000 | CERs | Not shared | 27/03/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 25 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary cancellation made by Anaconda Carbon on behalf of Vet and Breakfast Pet Hotel to offset all GHG emissions generated from their operation during 2019 | 18/02/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 956 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor Los Arallanes Sociedad Anónima (AFZ) para compensar las emisiones GEI generadas de su operación durante el periodo 2021 y para propósitos de cumplir con los requisitos del PPCN. | 16/03/2022 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 19,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT 901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustibles fósiles | 18/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 42 | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5,556 | CERs | BBVA Mexico's corporate carbon emissions 2020 | 19/03/2021 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 5,729 | CERs | WBG Carbon offset FY2020, PO 1521004, Guacamaya Hydro Honduras, cancellation on behalf of WB | 29/06/2020 | Attestation letter |
| 1259 | Enercon Wind Farm (Hindustan) Ltd in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 84,000 | CERs | Cancelled for KfW | 19/12/2018 | Attestation letter |
| 7609 | Conversion of Open Cycle Gas Turbines to Combined Cycle at Kallpa Thermoelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Peru | 37,000 | CERs | DL Carbon Neutrality 2021 | 26/04/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 384 | CERs | Voluntary cancellation made by Anaconda Carbon S.A. on behalf of Agrícola el Cántaro S.A (Finca y Beneficio de Café Santa Anita) to offset emissions generated by the company Operations during the year of 2018 | 30/10/2019 | Attestation letter |
| 1229 | Catalytic N2O destruction project in the tail gas of the nitric acid plant PANNA 3 of Enaex S.A. | Chemical industries | Chile | 162,573 | CERs | Voluntary cancellation of CERs in favor of iSi GmbH to offset GHG emissions | 21/06/2022 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 1,332 | CERs | To offset emissions for Trees4Travel clients | 24/01/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 3,717 | CERs | Compensación voluntaria realizada por Anaconda Carbón a favor del Conglomerado BNCR para compensar las emisiones GEI generadas durante el periodo 2021 para cumplir con los requisitos del PPCN | 09/05/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 29 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 113 704,0 kms of riders using UberFLASH during October 2020 made by A-CO2 | 23/11/2020 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 12,348 | CERs | Not shared | 20/04/2020 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 13,041 | CERs | on behalf of GP-14 | 09/08/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 210 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 837.442,0 kms of riders using UberECO during March 2020 made by A-CO2 | 09/04/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,317 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 11.095.970,0 kms of riders using UberX during March 2020 made by A-CO2 | 09/04/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 191 | CERs | To Retire Carbon Credit Capital's Webstore sales for 2020 and 2021. | 07/03/2022 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 1,017 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00077699 | 30/09/2021 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 22,690 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00077699 | 30/09/2021 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 12,283 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00075772 | 30/09/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 96 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Montacargas ODIO S.A para compensar las emisiones GEI generadas por las operaciones de la compañía durante el año 2020. | 27/10/2021 | Attestation letter |
| 0165 | ESTRE’s Paulínia Landfill Gas Project (EPLGP) | Waste handling and disposal | Brazil | 200,000 | CERs | Cancelled on behalf of EnergyAustralia's Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 25/03/2022 | Attestation letter |
| 7093 | Los Cocos Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 10,000 | CERs | Retirement Beneficiary : RON BARCELO Carbon Neutrality Program 2021. Retirement for the offset of the entire corporate activity and product life cycle emissions in 2020, this in accordance with Carbon Neutral Protocol, ISO14064-1 and ISO14067 standards. The Carbon Neutrality Program covers (1) controlled activities in own process including agricultural operations, processing plants and employee transportation; but also (2) uncontrolled activities resulting from the transportation and manufacture of raw materials (glass bottles, plastics, metals,…), worldwide maritime and land distribution of products, and final disposal of packaging material. | 25/03/2021 | Attestation letter |
| 1247 | URBAM/ARAUNA - Landfill Gas Project (UALGP) | Waste handling and disposal | Brazil | 4,000 | CERs | Cancelamento para compensação das emissões de Gases do Efeito Estufa referente ao Inventário Ano-Base de 2021 da obra Vistta Alto da Lapa para os escopos 1, 2 e 3 no ano de 2021. / Voluntay cancellation to offset corporate emissions on behalf of Vistta Alto da Lapa Building by 2021 GHG Inventory for scopes 1, 2 and 3 in 2021. | 11/11/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 166 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of The Grand Lounge Elite to offset GEI emissions generated from their 2017 operation of TGLE Lounges @ Mexico City´s International Airport, Mexico City | 20/12/2018 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 15 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de KETSIN COSTA RICA para compensar las emisiones GEI generadas por las operaciones de la compañía durante el año 2021. | 07/09/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 2 | CERs | This voluntary cancellation of CERs was made on behalf of Componentes e Módulos Automotivos - CMA / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1,577 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften der Dr. Reichardt & Co. Gesellschaft für Immobilienverwaltung m.b.H. 2023-2025 | 22/10/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 776 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CONSORCIO VIAL MAGDALENA MEDIO (NIT 901.070.071-0, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Ms. Veenu Jain Director and Admin, Consulting Engineers Group Ltd., EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 128,173 | CERs | Retiro a favor de Biomax S.A. NIT 830136799-1. Este retiro cumple con los requerimientos de la no causación del impuesto al carbono en Colombia, de acuerdo con el Decreto 926 de 2017 | 17/10/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 228 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SOCIEDAD PORTUARIA RIO CORDOBA S.A (NIT 819.005.181-9), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 15,000 | CERs | Voluntary cancellation of CDM CERs to offset German emissions of - Land Hesse 2020 | 22/12/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 45 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by TRANSATELLITAL SAS, NIT 811035903-9,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Huakai | Cancelación voluntaria de 2tCO2 por viaje a Asturias y Cantabria Surf Camp | 08 - 15 agosto | 02/09/2020 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 9 | CERs | OFFSET ON BEHALF OF: 21 GRAMOS REASON FOR COMPENSATION: Offsetting double the tonnes of carbon emitted during 2021 | 06/05/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Huakai – Cancelación voluntaria de 2tCO2 por viaje a Cabo de Gata 7-11 agosto | 02/09/2020 | Attestation letter |
| 6083 | Omnia N2O Abatement Project II | Chemical industries | South Africa | 175,341 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 24/11/2020 | Attestation letter |
| 2341 | Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Cañaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia | Waste handling and disposal | Colombia | 2,088 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Transportempo SAS (NIT 800051673-7), in order to not cause the national carbon tax. | 10/12/2020 | Attestation letter |
| 4928 | Huaneng Changyi Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 100,000 | CERs | Voluntary cancellation by Carbon Neutral Britain Ltd | 21/03/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 16/04/2021 | Attestation letter |
| 0085 | Hapugastenne and Hulu Ganga Small Hydropower Projects. | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 55,200 | CERs | Voluntary cancellation on behalf of Natural Capital Partners' client. | 30/11/2018 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Huakai | Cancelación voluntaria de 1tCO2 por viaje a Ibiza en coche | 01 - 08 agosto | 02/09/2020 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 15,779 | CERs | Aposentadoria em nome da Lojas Americanas S.A. para neutralização das emissões de Escopo 1 e 2 do ano de 2019 / retirement on behalf of Lojas Americanas S.A. to offset emissions from Scope 1 and 2 – 2019 | 14/06/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 55 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by AGREGADOS DE LA SIERRA (NIT 900.318.997-9, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Not shared | 25/03/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Retired on behalf of FZ. | 15/03/2021 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 77 | CERs | Purpose: Compensação de emissão de CONFECCOES DI SELEN S.A. Localizada em RUA CANDIDO PINHEIRO DE BARCELLOS (DISTRITO INDUSTRIAL), 170 Alvorada/RS. Beneficiary: CONFECCOES DI SELEN S.A | 19/03/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 2742 | Zafarana KfW IV Wind Farm Project, Arab Republic of Egypt | Energy industries (renewable - / non-renewable sources) | Egypt | 13,399 | CERs | First Climate for Adolf Roth GmbH & Co. KG: ROTH Energie Projekt Windkraft Ägypten | 20/10/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 575 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 575 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 575 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 20/07/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 600 | CERs | For Cool Effect on Behalf of Ecovadis | 03/11/2021 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 42 | tCERs | Not shared | 12/05/2020 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 99 | CERs | This voluntary cancellation of CERs was made on behalf of PSMM Componentes Automotivos / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 0922 | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of Korea | Chemical industries | Republic of Korea | 397,062 | CERs | CERs to be cancelled in exchange for Korean Offset Credits(KOC), issued by Korean Offset Program to hanwha Corp. The beneficiary of CERs cancelled is Hanwha Corp. | 25/03/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Espectáculo multimedia Cabalgata de Reyes Leganés 2020 | 05/02/2020 | Attestation letter |
| 4140 | Shenmu County Hengsheng Coal Chemical Co., Ltd. 30MW Semi-coke Waste Gas Power Generation Project |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 106,210 | CERs | CO2-Kompensationen von Produkten oder diversen Klimaschutzmaßnahmen der Kasseler Verkehrs- und Versorgungs- GmbH (KVV) sowie allen Beteiligungsgesellschaften und Allianzen der KVV. | 19/05/2022 | Attestation letter |
| 0331 | Biomass based independent power project at Malwa Power Private Limited, Mukatsar, Punjab | Energy industries (renewable - / non-renewable sources) | India | 14,147 | CERs | Beneficial Owner: EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA ESP (EAAB-ESP). Voluntary cancellation of CERs to offset the carbon footprint of EAAB - ESP in order to reach a carbon neutral condition. | 12/03/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Presentación del equipo ACCIONA Sainz 2020 | 30/07/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,997 | CERs | 2020-0796 | 2020 | 16/12/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 100,000 | CERs | "Takeda Pharmaceutical Company Limited’s Scope 3 Emissions" | 22/09/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 40 | CERs | Sustainable Planet Holding Ltd I am offsetting the carbon footprint of my clients | 06/10/2021 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 103 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 103 tons of greenhouse gas (GHG) emissions of the CBO BIANCA vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 103 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO BIANCA.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 9977 | West African Biodigester Programme of Activities | Energy industries (renewable - / non-renewable sources) | Benin, Burkina Faso | 14,304 | CERs | CERs that the UK purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated October 29, 2018 | 26/06/2019 | Attestation letter |
| 1166 | Bundled wind energy power projects (2004 policy) in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 72,064 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,974 | CERs | Retiro a favor de WORLD FUEL SERVICES identificado con NIT 830.112.215-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 15/03/2022 | Attestation letter |
| 5619 | Modelo del Callao Landfill Gas Capture and Flaring System | Waste handling and disposal | Peru | 8,826 | CERs | ENTREGA DE 8,826 CERS POR PARTE DE "PETRAMAS SAC" PARA LA NEUTRALIZACION DE LA HUELLA DE CARBONO AL "PROYECTO ESPECIAL PARA LA PREPARACIÓN Y DESARROLLO DE LOS XVIII JUEGOS PANAMERICANOS DEL 2019" - "EL PROYECTO LIMA 2019" | 05/09/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 429 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ENERGIZAR SAS | 12/10/2022 | Attestation letter |
| 5112 | Green House Gas Abatement through installation of a wind power project for export to the Grid. | Energy industries (renewable - / non-renewable sources) | India | 12,011 | CERs | "Since 2010, Esenboga Airport has been participating in Airport Council International’s (ACI) Airport Carbon Accreditation Program for greenhouse gas emissions management. Esenboga Airport achieved “Level-1 : Mapping” in 2010 and “Level 3+ : Neutrality” in 2014 and continue Level 3+ by offsetting its Scope 1, Scope 2 and Scope 3 (staff business travel) emissions for the year 2019, by purchasing 12.011 Certified Emission Reductions (equivalent to 12.011 tons of CO2)." | 11/11/2021 | Attestation letter |
| 6042 | CDM Project SHP Santa Carolina | Energy industries (renewable - / non-renewable sources) | Brazil | 12,000 | CERs | Retired on behalf of OVO Energy to comply with with Climate Active certification | 07/01/2022 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 2,723 | CERs | Stilllegung im Auftrag der KlimAktiv Consulting GmbH zur Kompensation von THG-Emissionen der Interline System Logistik GmbH | 28/12/2018 | Attestation letter |
| 0073 | "Las Vacas" Hydroelectric project | Energy industries (renewable - / non-renewable sources) | Guatemala | 5,540 | CERs | ERMES GAS & POWER S.R.L. – Compensazione quote emissioni GAS anno 2022 per conto di ERMES GAS & POWER S.R.L. | 28/09/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Ms. Bistriti Poddar Founder, Paperless Postcards. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 9074 | Mampuri Wind Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 31,908 | CERs | We are hereby confirming Voluntary cancellation of 31,908 CERs for the purpose of conversion to Gold Standard VERs from project GS4300. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose | 01/03/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 17,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT 901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustibles fósiles | 20/09/2021 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 25,525 | CERs | SGS Société Générale de Surveillance SA - 2021 offsetting | 28/02/2022 | Attestation letter |
| 0198 | San Jacinto Tizate geothermal project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 179,606 | CERs | Retirement on behalf of Sphere 3D Mining Corp. to offset current and future carbon emissions | 29/03/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,000 | CERs | These carbon credits have been retired on behalf of CarbonClick users, for the purpose of offsetting their carbon emissions. | 15/02/2022 | Attestation letter |
| 7100 | Los Cocos II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 19,500 | CERs | Retirement Beneficiary: SEA MILAN AIRPORTS. Retirement for the offset of Milan Linate Airport controlled emissions in 2019 in accordance with Level 4+ requirements of the Airport Carbon Accreditation program. The retirement covers (1) scope 1, direct emissions from own process and activities; (2) scope 2, indirect emissions due to the use heat and electricity; and (3) scope 3, business travel emissions. | 10/09/2021 | Attestation letter |
| 6008 | Recovery and Utilization of Associated Gas at Pondok Tengah LPG Plant – PT. Yudistira Energy | Fugitive emissions from fuels (solid, oil and gas) | Indonesia | 74,608 | CERs | ACT Financial Solutions B.V. - TM00173654 | 14/10/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 39 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 155 904,0 kms of riders using UberFLASH during January 2021 made by A-CO2 | 05/02/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 5,446 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 16/03/2022 | Attestation letter |
| 4463 | Metro Delhi, India | Transport | India | 50,973 | CERs | "Retired on behalf of South Pole client #103748" | 14/09/2021 | Attestation letter |
| 2247 | 13.25 MW Wind Power Generation by RMTL, in Kutch, Gujarat | Energy industries (renewable - / non-renewable sources) | India | 2,481 | CERs | Retirement Beneficiary - Plenish Drinks | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 29/07/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,704 | CERs | El Grupo Bolsa Mexicana de Valores realiza la mitigación de 1,704 toneladas de CO2 emitidas en el año 2020. | 10/12/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 2,736 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis Motores Campo Largo. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 1167 | Bundled wind energy power projects (2003 policy) in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 1,150 | CERs | Beneficiary Name: Al Taiseer Aluminium Company (TALCO), Kingdom of Saudi Arabia. Purpose: Offsetting the Carbon Footprints partially, against the “Purchased Electricity and Direct On-site Emissions” accounted during the year 2020. | 09/08/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 25 | CERs | Year 2019 Emissions Offset for the P. Rajesh Ship Breaking Pvt. Ltd. | 23/08/2021 | Attestation letter |
| 3599 | Bajo Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 3,158 | CERs | Voluntary cancellation in favor of Primax Colombia S.A. (NIT860.002.554 - 8) for the neutralization of 3,158 tons of CO2 associated with fossil fuels to be used by COMERCIALIZADORA DE BIENES Y SERVICOS CB&S S.A. (NIT 830.061.125-4) in order not to cause the national carbon tax. | 05/09/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 288 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by EMPRESA DE TRANSPORTE RIO CALI (NIT 800.125.299-4 ), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 17 | CERs | Retirement – Beneficiary: MOOG MDG S.R.L. Retirement Reason Details: Cancelación voluntaria realizada por Distribuidora MOOG MDG S.R.L. para compensar sus emisiones de CO2 equivalente correspondientes al año 2019. | 15/12/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1,839 | CERs | Retired on behalf of Cool Effect for the month of March 2021. | 16/04/2021 | Attestation letter |
| 0258 | Nueva Aldea Biomass Power Plant Phase 1 | Energy industries (renewable - / non-renewable sources) | Chile | 5,000 | CERs | Neutralization of 2019 Carbon footprint/colgate University, Hamilton, NY, USA | 30/06/2020 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 2,777 | CERs | Xi'an Geely Automobile Co., Ltd. purchases 2777 tons of CERs to offset the direct greenhouse gas emissions generated from its operation activities from 1st January 2022 to 30th June 2022. | 26/09/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Mitigación de la Huella de Carbono de Francisco Javier Ibañez Oteiza | 09/06/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 643 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 643 tons of greenhouse gas (GHG) emissions of the CBO Flamengo vessel fuel consumption.” Reference month: April 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 643 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Flamengo.” Mês de referência: Abril de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 30/05/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 34 | CERs | Extende SA | 10/03/2022 | Attestation letter |
| 1247 | URBAM/ARAUNA - Landfill Gas Project (UALGP) | Waste handling and disposal | Brazil | 6,582 | CERs | Cancelamento para compensação das emissões de Gases do Efeito Estufa referente ao Inventário Ano-Base de 2021 da obra Facto Paulista para os escopos 1, 2 e 3 no ano de 2021. / Voluntay cancellation to offset corporate emissions on behalf of Facto Paulista Building by 2021 GHG Inventory for scopes 1, 2 and 3 in 2021. | 11/11/2021 | Attestation letter |
| 0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | Waste handling and disposal | Brazil | 6,697 | CERs | Retired for DL 2021 Carbon Neutrality | 01/03/2022 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 100,000 | tCERs | Cancellation for conversion to VCUs | 16/12/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Dr YUEN Pak Leung” for Annual Dinner in 2021 (Transaction ID: 710) | 18/02/2021 | Attestation letter |
| 8500 | SHP ITAGUACU CDM PROJECT (JUN 1146), BRAZIL | Energy industries (renewable - / non-renewable sources) | Brazil | 2,000 | CERs | Purpose: Neutralização de emissões - Lote 86: Neutralize Carbono (CNPJ.: 11.639.463/0001-14) Beneficiary: Lote 86 - Neutralize Carbono | 15/03/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 12,250 | CERs | Titular: Sociedad Estatal Correos y Telégrafos, S.A. Concepto: Compensación de huella de carbono 2020 | 30/12/2020 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 88,103 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 20/10/2021 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 1,626,613 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named Sasol South Africa Limited, with the carbon offset administration system account number 101044, into which the offsets must be listed. | 18/01/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 17/10/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Stand Fotocasa SIMED 2020 | 05/02/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 90 | CERs | Beneficiary: FACO (Franz Amrhein y Compañía) S.A. Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compañía) S.A. to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of October 2018. For more information visit: www.hondacostarica.com/co2 | 18/01/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 411 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by IMPOCOMA S.A.S (NIT 830.078.780), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 119 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by PALMERAS DE LA COSTA S.A (NIT 860.031.768-0), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 7834 | Xinjiang Gonggeer Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 130,000 | CERs | Retired on behalf of Simply Energy ABN 67 269 241 237 as part of its carbon neutral commitments under Climate Active (retail gas) for products sold between 1 July 2022 and 30 June 2023 | 12/09/2022 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 40,000 | CERs | Retired on behalf of ReNew Power Private Limited to offset its scope 1 and scope 2 emissions from its operations in 2020-21. | 01/12/2021 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 5,629 | CERs | CO2-neutraler Erdgasbezug für die durch die CBRE GmbH verwalteten Liegenschaften in 2022-2025 | 06/12/2021 | Attestation letter |
| 2600 | Amaime Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 20,000 | CERs | Voluntary cancellation in favor of EMPRESA COLOMBIANA DE PETRÓLEOS SA - ECOPETROL SA (NIT 899999068-1) for neutralization of the GHG emissions, in orden to not cause the national carbon tax. | 11/03/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 16 | CERs | Compensación voluntaria a favor de GEO F. NOVEY INC. por la neutralización de 16tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 536 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 569 172,00 kms of riders using UberX during February 2021 made by A-CO2 | 09/03/2021 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 5,227 | CERs | Not shared | 31/03/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 531 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 539 748,0 kms of riders using UberX during December 2020 made by A-CO2 | 22/01/2021 | Attestation letter |
| 8012 | Grid connected electricity generation from renewable source: Windfarm Complex Santa Vitória do Palmar and Chuí | Energy industries (renewable - / non-renewable sources) | Brazil | 19,957 | CERs | IFood.com Agência de Restaurantes Online S.A. | 15/03/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 40,000 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA S.A. (NIT 860.002.554-8) for the neutralization of 40.000 tons of CO2 associated with fossil fuels in order not to cause the national carbon tax. | 07/06/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 156 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by OPERADORES DEL CAMPO (NIT 900.107.259), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 15,151 | CERs | OFFSET ON BEHALF OF: BANCO SANTANDER, S.A. REASON FOR COMPENSATION: SANTANDER HUELLA DE CARBONO 2021 ALEMANIA | 16/02/2022 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 8,000 | CERs | Aposentadoria em nome da AMARO para neutralização das emissões dos escopos 1 , 2, e 3 de 2020; neutralização de pegada de carbono de seus produtos do primeiro semestre de 2021 / Retirement on behalf of AMARO to offset emissions from scope 1, 2 and 3 from 2020; and offsetting of AMARO’s products carbon footprint from 1st semester of 2021. | 16/08/2021 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 9 | tCERs | Retired for MAILBOX MARKETING UK LIMITED | 31/01/2020 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 350,000 | CERs | For DL 2021 Carbon Neutrality. | 07/01/2022 | Attestation letter |
| 9306 | Choloma Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 5,985 | CERs | 2018 ECOCERT Group carbon compensation/ECOCERT SA | 30/07/2019 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 2,420 | CERs | “Retired on behalf of ISA Intervial - Neutralización 2021 - SCX ID 0125-E0817B09 – 0126-E0817B10” | 05/08/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 83 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - FCA Autopeças Jaboatão dos Guararapes under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,167 | CERs | Voluntary compensation from Uber Mexico to offset GHG emissions made by A-CO2 | 08/04/2021 | Attestation letter |
| 5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 86,631 | CERs | "Retired towards DL 2022" | 26/09/2022 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 2,097 | CERs | Voluntary cancellation for offsetting GHG emissions within organization boundary of Hexagon Manufacturing Intelligence (Qingdao) Co., Ltd. | 13/09/2022 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 80,639 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 29/04/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SERVICIOS Y TRANSPORTES LTDA (NIT 800.189.925-1, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 8,881 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 15/06/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 60 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 12/05/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 220,000 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT-860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles. | 18/06/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 6,299 | CERs | 2019-1549 | 2020 | 09/11/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 39 | CERs | Retirement – Beneficiary: Agencia DatsunS.A. Retirement Reason Details: Cancelación voluntaria hecha por Anaconda Carbon para la carbono compensación de 10,000 kms iniciales de recorrido para 13 unidades Nissan Urvan adquiridas por la Asociación Cruz Roja Costarricense a Agencia Datsun S.A. | 13/08/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Offsetting the tonnes of carbon emitted in the production of Amaka-Zara Social Media | 09/12/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100,000 | tCERs | Carbon removal credits for voluntary climate action - TR 3 | 22/12/2020 | Attestation letter |
| 3599 | Bajo Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,348 | CERs | Voluntary cancellation in favor of Terpel S.A (NIT 830.095.213-0) for the neutralization of 1,348 tons of CO2 associated with fossil fuels to be used by COMERCIALIZADORA DE BIENES Y SERVICOS CB&S S.A. (NIT 830.061.125-4) in order not to cause the national carbon tax. | 05/09/2019 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 600 | CERs | This cancellation is for usage in the offsetting of GRUPO JORGE'S corporate carbon footprint in the year 2019. | 30/07/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 40,000 | CERs | Cancelación voluntaria a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS (NIT 900497906-5) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 19/10/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 8 | CERs | Compensación de emisiones de GEI generadas por actividades relacionadas al desarrollo del evento de Design Week México 2019. | 20/01/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 100 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Antojese Travel for all air tickets, hotels and car rentals bookings issued for the period from January 1st to April 30th 2021. | 29/06/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1 | CERs | OFFSET ON BEHALF OF Shelpin REASON FOR COMPENSATION I am offsetting the carbon footprint of my organization | 06/04/2022 | Attestation letter |
| 0571 | 10.6 MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan. | Energy industries (renewable - / non-renewable sources) | India | 4,686 | CERs | This is to certify that Mahendra Brothers Exports Private Limited has purchased 4686 Tons of Carbon Credit to offset their Carbon Emissions for the Financial Year 2021- 2022 and there by to become Carbon Neutral entity for 2021-22. | 08/06/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,555 | CERs | UPMISC2018 – June Sales | 02/08/2021 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1 | CERs | Cancellation on behalf of Facundo Barbosa to offset the carbon footprint of his direct emissions (Scope 1) | 03/08/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 111 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 111 tons of greenhouse gas (GHG) emissions of the REM Mistral vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 111 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação REM Mistral.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 4,648 | CERs | Retired for Carbon Neutrality for Kirloskar Oil Engines limited for FY 2019-20. | 07/01/2022 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 2,432 | CERs | Cancelamento voluntário em nome da SCAPINI. CERs foram voluntariamente canceladas referente a compensação de 20% das emissões de gases de efeito estufa da SCAPINI (Escopo 1 e 2), no ano de 2020. | 26/08/2021 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 64 | CERs | Purpose: Compensação de emissão da KFK INDUSTRIA E COMERCIO DE CONFECCOES EIRELI, localizada em RUA FRANCA, 150 Brusque / SC. Beneficiary: KFK INDUSTRIA E COMERCIO DE CONFECCOES EIRELI | 19/03/2021 | Attestation letter |
| 7577 | Use of Charcoal from Renewable Biomass Plantations as Reducing Agent in Pig Iron Mill in Brazil | Metal production | Brazil | 12,618 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of the Carbon Fund to cancel all emissions reductions resulting from its participation in the Fund | 22/03/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 59,665 | CERs | Not shared | 26/05/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 100,000 | CERs | For DL 2021 Carbon Neutrality | 05/01/2022 | Attestation letter |
| 10261 | Oeste de Caucaia Landfill Project Activity | Waste handling and disposal | Brazil | 1,059,508 | CERs | CERs are canceled for conversion to VCUs | 03/09/2021 | Attestation letter |
| 8150 | 5X0.8 MW Wind Power Project by Texmo Industries | Energy industries (renewable - / non-renewable sources) | India | 114 | CERs | First Climate, Klimaneutralstellung Green by Choice 2021 v1.0 und optional v1.1 | 02/06/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 39 282,0 kms of riders using UberCOMFORT during October 2020 made by A-CO2 | 23/11/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 46 | 22/12/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10 | tCERs | P4C - People for Climate Initiative | 30/12/2020 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 2,891 | CERs | Beneficiary: ECOCERT Purpose: Compensation of carbon footprint | 08/09/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 881 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by RH GROUP S.A.S (NIT 900394217-6), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 212 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SOLUTRANS (NIT 805.007.853-8), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 1 | CERs | Voluntary cancellation made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of L'Oréal Brasil - Active Cosmetic Division, to offset CO2 emissions related energy consumption originated during the Dermatology Congresses in 2019 promoted by L'Oréal in Brazil as a sponsor. | 15/05/2019 | Attestation letter |
| 4677 | Vaayu India Wind Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 106,412 | CERs | Voluntary cancellation of 145,953 CERs for the purpose of conversion to Gold Standard VERs from project GS4603. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 11/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 850 | CERs | 2019-0446 | 2020 | 11/11/2020 | Attestation letter |
| 2954 | Guangdong Taishan Shangchuandao Island Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 25,813 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance | 01/11/2019 | Attestation letter |
| 3056 | Poyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 45,529 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 06/01/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 2,989,398 | CERs | compensação voluntária das emissões de CO2 dos veículos financiados pelo BV - Banco Votorantim S/A | 05/10/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 33,460 | CERs | Compensation of carbon footprint for year 2019 of Acciona Service | 18/05/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2017-1026 | 2020 | 11/11/2020 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 2,444 | CERs | Operational emissions and customer emissions neutralization by Industrial Bank Co.,Ltd. | 10/12/2021 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 119 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 119 tons of greenhouse gas (GHG) emissions of the CBO Valentina vessel fuel consumption.” Reference month: May 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 119 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Valentina.” Mês de referência: Maio de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 110,000 | CERs | To offset CO2 emissions from fuel gallons delivered. | 05/01/2022 | Attestation letter |
| 0851 | Daegu Bangcheon-Ri Landfill Gas CDM Project | Waste handling and disposal | Republic of Korea | 955 | CERs | This cancellation is for usage to offset Ecoeye's carbon emission, and Ecoeye is beneficiary of this cancellation. | 31/12/2020 | Attestation letter |
| 2742 | Zafarana KfW IV Wind Farm Project, Arab Republic of Egypt | Energy industries (renewable - / non-renewable sources) | Egypt | 207,120 | CERs | First Climate for AVIA AG | 30/03/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 64,900 | CERs | Cancelación voluntaria a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS (NIT. 900497906-5) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 19/04/2021 | Attestation letter |
| 1993 | Siam Quality Starch Wastewater Treatment and Energy Generation Project in Chaiyaphum, Thailand |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Thailand | 15,992 | CERs | Beneficial Owner: EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA ESP (EAAB-ESP). Voluntary cancellation of CERs to offset the carbon footprint of EAAB - ESP in order to reach a carbon neutral condition | 28/02/2019 | Attestation letter |
| 3611 | Roaring 40’s Wind Farms (Khandke) Private Limited – Phase III | Energy industries (renewable - / non-renewable sources) | India | 300 | CERs | Voluntary Cancellation of 300 CERs for transaction no. 848-872 and 875-909 (5 CERs each) | 10/05/2021 | Attestation letter |
| 0851 | Daegu Bangcheon-Ri Landfill Gas CDM Project | Waste handling and disposal | Republic of Korea | 260,812 | CERs | The amount of 260,812 CERs will be converted to Korean Offset Credit in Korea Emissions Trading Scheme. | 31/05/2021 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 196 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Antojese Travel for all air tickets, hotels and car rentals bookings issued for the period from October 1st, 2021 to February 28, 2022 | 18/08/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 253 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Cemex Transportes (NIT 830078000-7), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 265 | CERs | Compensación de las emisiones de Comercial de Potencia y Maquinaria S.A. – Costa Rica, en el periodo comprendido del 1 de enero al 31 de diciembre del 2020 para demostrar la Carbono Neutralidad ante el PPCN 2.0 y la norma INTE B5 de Costa Rica | 09/07/2021 | Attestation letter |
| 6797 | Joburg Landfill Gas to Energy Project | Waste handling and disposal | South Africa | 256,117 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 and specifying the organisation’s name and carbon offset administration system account number into which the offsets must be listed | 30/04/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Raymond HO Chung Tai, SBS, S.B. St. J., JP” for Annual Dinner in 2021 (Transaction ID: 712) | 18/02/2021 | Attestation letter |
| 9708 | Niger Acacia Senegal Plantation Project | Afforestation and reforestation | Niger | 44,056 | tCERs | Conversion of these tCERs into VCUs. | 27/10/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 1 | CERs | Voluntary cancellation of 1 CERs to offset the CO2e emissions of “Karen Gonzalez Birthday Party” which took place the 8th of September of 2018. | 05/12/2018 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 100 | CERs | Compensación voluntaria de emisiones mediante el manejo responsable de residuos de la empresa ESSITY HIGIENE Y SALUD MÉXICO, S.A. de C.V. planta Monterrey (Enero-Marzo de 2022) | 06/05/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 524 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 524 ton of greenhouse gas (GHG) emissions of the CBO Flamengo vessel fuel consumption.” Reference month: March 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 524 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Flamengo.” Mês de referência: Março de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 14/04/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mrs Monica YUEN” for Annual Dinner in 2021 (Transaction ID: 730) | 22/02/2021 | Attestation letter |
| 2475 | LG Chem Naju plant fuel switching project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 24,082 | CERs | We are requesting Voluntary cancellation of total CERs in order to switch them into KOCs(Korea Offset Credets) by submitting an attestation letter to Korea government under Korea ETS. | 23/11/2018 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 1 | CERs | PURPOSE/BENEFICIARY: CINDY GONZALEZ MONCADA PRAT DE LA RIBA 43 3-1 08290 CERDANYOLA DEL VALLES BARCELONA, SPAIN REASON FOR RETIREMENT: "AIR TRAVEL BETWEEN BARCELONA AND BRUSSELS" POWERED BY WWW.PRISMAVENTURE.COM/CDMUNFCCCINT/PROJECTS/6848/14 | 06/12/2021 | Attestation letter |
| 7609 | Conversion of Open Cycle Gas Turbines to Combined Cycle at Kallpa Thermoelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Peru | 193,000 | CERs | DL Carbon Neutrality 2021 | 26/04/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 176 | CERs | Retired for Furthr's subscribers & benefit users in January - March 2022 | 25/04/2022 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 29 | CERs | Sustainable Planet Holdings Ltd. Offsetting the carbon footprint of company's trips. | 06/10/2021 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 24 | CERs | Voluntary Cancellation of 24 CERs for transaction no. 1141-1146 | 10/12/2021 | Attestation letter |
| 8103 | 9 MW Wind Energy Farm at Jodhpur Rajasthan by HZL | Energy industries (renewable - / non-renewable sources) | India | 131 | CERs | Retired on behalf of Furthr for its monthly subscribers between 15th November 2020 and 14th December 2020 | 06/01/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 500 | CERs | Klimaneutraler Geschäftsbetrieb der MATSEN CHEMIE AG im Jahr 2020 sowie klimaneutrale Produkte. Dieses Zertifikat bestätigt hierzu die Neutralisierung von 500 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 500 Gold Standard CERs des Projekts "Solar Water Heater Program in India" aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 19/11/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 63 | CERs | Compensación voluntaria a favor de CERVECERIA NACIONAL, S.A. por la neutralización de 63tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 16 | CERs | Compensación voluntaria a favor de PROCESADORA MONTE AZUL, S.A. por la neutralización de 16tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 7,171 | CERs | Voluntary cancellation of CERs was made on behalf of FCA Betim Powertrain under Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 05/09/2019 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 13,868 | CERs | Retired on behalf of Buhck Umweltservices GmbH & Co. KG for the offsetting of carbon emissions | 13/01/2021 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 50,000 | CERs | “Stadtwerke Herford GmbH” | 20/12/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir John K W Chan” for Annual Dinner in 2021 (Transaction ID: 715) | 18/02/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 151 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 151 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 151 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 15/12/2020 | Attestation letter |
| 5845 | Grid Connected Wind Power Project by M/s. Giriraj Enterprises at Tejuva, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 13,377 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 4537 | DakRTih Hydropower Project, Vietnam | Energy industries (renewable - / non-renewable sources) | Viet Nam | 44,762 | CERs | Carbon credits retired by AzzeroCO2 on behalf of Fastweb Spa - estimated value of Scope 3 emissions related to use of products by customers in 2024 | 14/09/2022 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 313,772 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 07/01/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,554 | CERs | 2019-0049 | 2020 | 11/11/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 769 | CERs | On behalf of Cool Effect | 11/12/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1,249 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EQUAIR para compensar las emisiones GEI generadas por todos los pasajeros transportados durante el mes de febrero 2022. | 07/04/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 33 | CERs | Voluntary Cancellation of 33 CERs for transaction no. 367 to 399 on www.clpcarboncredits.com | 27/06/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,659 | CERs | Cool Effect Platform Sales August 2021 | 05/10/2021 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 1,200 | CERs | Carbon offset for CLP Group’s Business Travel in 2020 | 21/04/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 09/12/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 16 | 22/12/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 900 | CERs | Compensación voluntaria realizada por Boston Scientific SRL / Planta Heredia para compensar las emisiones GEI derivadas de su operación para el periodo 2020 y cumplir con los requisitos del PPCN | 26/05/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,019 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INGENIO LA CABAÑA (NIT 891.501.133-4 , project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 10 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften der Barings Core Fund Gotha S.á r.l. in 2020 | 06/12/2021 | Attestation letter |
| 5923 | Wind Power Project in Rajasthan, India by M/s Devki Builders Pvt. Ltd. | Energy industries (renewable - / non-renewable sources) | India | 58,405 | CERs | “Retired on behalf of HANWHA ENERGY RETAIL AUSTRALIA PTY LTD trading as NECTR for FY21/22 and FY22/23 Climate Active certification” | 10/02/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 4 | tCERs | Eu, Marcio Artiaga de Almeida Castro, compensei minha pegada de carbono! | 14/10/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,460 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by METROBUS S.A (NIT 830.073.662-5), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,004 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SATOR S.A.S (NIT 890.110.985-0), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 923 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Molinos de Costa Rica S.A para compensar las emisiones GEI generadas durante el año 2018 y cumplir con la Declaratoria de Carbono Neutralidad de la Direccion de Cambio Climático y el PPCN | 04/08/2020 | Attestation letter |
| 6008 | Recovery and Utilization of Associated Gas at Pondok Tengah LPG Plant – PT. Yudistira Energy | Fugitive emissions from fuels (solid, oil and gas) | Indonesia | 13,453 | CERs | ACT Financial Solutions B.V. - TM00178700 | 13/12/2019 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 5,000 | CERs | To offset emissions for Trees4Travel clients | 24/01/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 25 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Tica Bus y Liga Deportiva Alajuelense , para compensar las emisiones de GEI generadas por la operación del bus de los Leones por los próximos 20.000 kilometros | 06/08/2021 | Attestation letter |
| 0171 | Caieiras landfill gas emission reduction | Waste handling and disposal | Brazil | 1,059 | CERs | Voluntary Cancellation of 1059 CERs to neutralize the carbon footprint of all the operations of Innova Ambiental S.A., RUC 20302891452, during 2019 in the solid waste management in the city of Lima (Cercado de Lima and Municipalidad de Miraflores) | 26/06/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 69,500 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 14/06/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 22,496 | CERs | 2019-0237 | 2020 | 09/11/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100,000 | tCERs | Carbon credits available for voluntary use - TR 4 | 22/12/2020 | Attestation letter |
| 3307 | Pingtou 180MW Hydropower Project in Sichuan Province | Energy industries (renewable - / non-renewable sources) | China | 106,829 | CERs | “retired on behalf of Nordic Leisure Travel Group AB for Scope emissions of 2022/2023” | 26/09/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 7 | CERs | Voluntary Cancellation of 07 CERs for transaction no. 330 on www.clpcarboncredits.com | 06/03/2019 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 24,157 | CERs | to offset the direct and energy indirect greenhouse gas emissions made by Thomas Dynamic Material (Jiangsu) Co., Ltd. in 2021 | 15/09/2022 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1,754 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EQUAIR para compensar las emisiones GEI generadas por todos los pasajeros transportados durante el mes de Marzo 2022. | 19/05/2022 | Attestation letter |
| 0752 | Omnia Fertilizer Limited Nitrous Oxide (N2O) Reduction Project | Chemical industries | South Africa | 195,069 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 23/11/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | OFFSET ON BEHALF OF: ACCIONA REASON FOR COMPENSATION: Jornada de Inversores Sau Paulo 2020 | 16/02/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 386 | CERs | CO2-Offset der Stiftung Mercator für das Geschäftsjahr 2020. | 29/07/2021 | Attestation letter |
| 1259 | Enercon Wind Farm (Hindustan) Ltd in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 200 | CERs | Retired on behalf of Husqvarna AB – Climate Neutral for Life | 19/12/2018 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 1,802 | CERs | Voluntary cancellation in favour of ORGANIZACIÓN TERPEL SA (NIT 830095213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by CONSORCIO FARALLONES (NIT 900.815.553-4), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Ringo YU Shek Man” for Annual Dinner in 2021 (Transaction ID: 708) | 18/02/2021 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 576 | CERs | Voluntary compensation from Macnaughton Blair Limited to offset GHG emissions related to energy supply contracts for the period 10/03/21 to 10/03/23. | 17/08/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,007 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ADISPETROL S.A (NIT 860054978-1, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,736 | CERs | Retiro a favor de WORLD FUEL SERVICES identificado con NIT 830112215-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 12/04/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 846 | CERs | Voluntary cancellation to offset the GHG generated from operation of Dacheng Fund Management Co.,Ltd. and branches from January 1, 2021 to December 31, 2021. | 23/05/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 14 | CERs | Compensación de las emisiones de GEI generadas por las actividades relacionadas al desarrollo de la campaña ‘México Verde 2020’ de marca Indio | 29/09/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 451 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 451 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 451 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 20/09/2021 | Attestation letter |
| 5992 | Inner Mongolia China Water Group Huade Niujiafangzi Wind Farm 49.5MW Project | Energy industries (renewable - / non-renewable sources) | China | 1,130 | CERs | Klimaneutrales Erdgas der Adolf Föhl GmbH + Co KG für das Lieferjahr 2021 | 23/11/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | OFFSET ON BEHALF OF: Compensación carbono | Grandvalira 19-23 enero | Huakai Travel S.L. REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 04/02/2022 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 132,525 | CERs | Voluntary cancellation of CERs in favor of iSi GmbH to offset GHG emissions | 21/06/2022 | Attestation letter |
| 10496 | 19.2 MWp Solar Power Project by HZL at Debari and Dariba, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 29,178 | CERs | “Voluntary cancellation for the purpose of conversion to Gold Standard VERs from project GS6279. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose.” | 16/09/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Congreso Internacional de Innovación Social - V Centenario Magallanes-El Cano | 30/07/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 382 | CERs | Retirement – Beneficiary: Moog MDG SRL Retirement Reason Details: Voluntary cancellation on behalf of Moog MDG SRL for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018 | 04/10/2019 | Attestation letter |
| 2486 | Conversion of SF6 to the alternative cover gas SO2 at RIMA magnesium production | Metal production | Brazil | 1,500 | CERs | This operation of voluntary cancellation of Certified Emission Reductions units issued by the Clean Development Mechanism is made for: “Offsetting part of Scope 1 greenhouse gas emissions from operations and facilities in 2021 of Ocyan S.A., as part of our strategy to meet our environmental commitments.” | 18/07/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 192 | CERs | For Furthr subscribers from October - December 2021 | 11/02/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de GRUPO DANISSA para compensar las emisiones GEI del voluntariado PV del Este (Agencia Datsun Curridabat) | 29/09/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Jeevraj Pillai,Joint President – Packaging and New Product Development Uflex Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 229 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Mobility | 11/05/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon removal credits for voluntary climate action - TR 49 | 22/12/2020 | Attestation letter |
| 1364 | N2O abatement project at nitric acid plant No. 11 at African Explosives Ltd. (AEL), South Africa | Chemical industries | South Africa | 242,647 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization AEL Mining Services Limited, to be listed in COAS Account number 100015. | 09/10/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 3,000 | CERs | Retired on behalf of planetly GmbH. | 12/10/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,573 | CERs | Grupo Agroindustrial Numar, S.A., División Tostadora Café 1820 | 29/03/2019 | Attestation letter |
| 3464 | Exploitation of the biogas from Controlled Landfill in Solid Waste Management Central – CTRS / BR.040 | Waste handling and disposal | Brazil | 368,791 | CERs | Beneficial Owner: BV - Banco Votorantim S.A. Reason for Cancellation: Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 24/06/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1,080 | CERs | Compensación voluntaria realizada por Boston Scientific SRL / Planta Heredia para compensar las emisiones GEI derivadas de su operación para el periodo 2021 y cumplir con los requisitos del PPCN. | 25/02/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,461 | CERs | Voluntary cancellation on behalf of SERVICIOS DE VIAJEROS SUIZA S.A. for its Greenhouse Gas (GHG)management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2019 | 28/03/2022 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 350 | CERs | Voluntary cancellation on behalf of Mercia Asset Management PLC to offset its carbon footprint | 07/07/2022 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 48,000 | CERs | Huella de carbono Prosegur 2021 | 05/03/2021 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 10,354 | CERs | CERs cancelled to render EBRD’s operations in 2019 carbon neutral | 14/04/2022 | Attestation letter |
| 3222 | BRASCARBON Methane Recovery Project BCA-BRA-08, Brazil. | Waste handling and disposal | Brazil | 3,840 | CERs | Retirement on behalf of the following real state enterprises, Arte Arquitetura Moema (1.322 tCO2e), Condominio Arte Arquitetura Pinheiros 2 (810 tCO2e), Edificio Galeria Morais De Barros (460 tCO2e), Edificio Madrigal Alto de Pinheiros (556 tCO2e), Motion Avanhandava (688 tCO2e) referring to the GHG emissions of scopes 1, 2 and 3 related to their constructions. | 25/03/2021 | Attestation letter |
| 1115 | 75MW wind power project in Maharashtra by Essel Mining Industries Limited | Energy industries (renewable - / non-renewable sources) | India | 178,188 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 10004 | City of Cape Town Landfill Gas Extraction and Utilisation Programme | Waste handling and disposal | South Africa | 123,749 | CERs | The voluntary cancellation is in accordance with the Regulations on carbon offsets under Section 19 of the South African Carbon Tax Act, as published in Government Notice 1556 Government Gazette 42873 on 29 November 2019. | 30/07/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 4 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for September 2021 sales | 15/10/2021 | Attestation letter |
| 4940 | Uganda Nile Basin Reforestation Project No 2 | Afforestation and reforestation | Uganda | 529 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 09/12/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 100 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Verdad Informática de Costa Rica S.A (EQUIFAX) para compensar las emisiones GEI generadas de su operación durante el periodo 2020 y cumplir con la normativa del PPCN. | 29/11/2021 | Attestation letter |
| 9925 | SHPs Tambaú, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil | Energy industries (renewable - / non-renewable sources) | Brazil | 817 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 817 ton of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 817 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Certificate 1 of 2 for 1.699 tCO2e on total Certificado 1 de 2 para um total de 1.699 tCO2e Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 10/02/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 15,557 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT-860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 19/05/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3 | CERs | Mitigación de la Huella de Carbono de Lourdes Guadalupe Zamora García | 05/05/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 26 | CERs | I am offsetting my organization's greenhouse gas emissions | 29/05/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5,594 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de INOLASA para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 24/09/2020 | Attestation letter |
| 0941 | Sudokwon Landfill Gas Electricity Generation Project (50MW) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 785,559 | CERs | 785559 CERs Cancellation in exchange for Korean Offset Credit (KOC) to be issued by Korean Offset Program to SL Corp. | 23/08/2022 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 3,316 | CERs | Retired on behalf of DNB ASA | 15/05/2020 | Attestation letter |
| 4928 | Huaneng Changyi Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 883 | CERs | Carbon credits retired by AzzeroCO2 on behalf of Favini Spa - offsetting of GHG emissions of the papers: Crush, Refit, Remake, Alga Carta, Shiro Echo, Tree free and Favini Art in 2021 and Wkloud Paper in 2022. | 06/04/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 69,493 | CERs | “Voluntarily offsetting CO2 emissions from fuel gallons delivered.” | 26/04/2022 | Attestation letter |
| 10004 | City of Cape Town Landfill Gas Extraction and Utilisation Programme | Waste handling and disposal | South Africa | 1 | CERs | The voluntary cancellation is in accordance with the Regulations on carbon offsets under Section 19 of the South African Carbon Tax Act, as published in Government Notice 1556 Government Gazette 42873 on 29 November 2019. | 08/06/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 8 | CERs | Voluntary compensation made by Anaconda Carbon on behalf of Coalicion Costarricense de Iniciativas de Desarrollo (CINDE), to offset all GHG emissions from the operation of their website for the 2nd year and 200K visits | 03/12/2021 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 17,471 | CERs | Offsetting emissions occurred in 2023 – Van Kessel Olie B.V | 16/09/2022 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 243,690 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 21/12/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 18 | 22/12/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Wai Chi Sing, GBS, JP, FHKEng” for Annual Dinner in 2021 (Transaction ID: 740) | 22/02/2021 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 15,000 | CERs | Retirement Beneficiary - idverde UK Ltd | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 06/10/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Huakai | Cancelación voluntaria de 1tCO2 por viaje a Cabo de Gata | 14 - 18 agosto | 02/09/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 4 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 09/09/2022 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 7 | CERs | Retiro a nombre de IDEAPAIS para compensar su huella de carbono 2021 | 23/03/2022 | Attestation letter |
| 9887 | 3.7 MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 32,947 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 1 | CERs | Voluntary cancellation of 1 CER to offset the emissions of the British Embassy of Lima, event: “Precio al Carbono como Instrumento para Alcanzar los NDC’s del Perú” which took place the 8th of November of 2018 in Lima, Peru. | 05/12/2018 | Attestation letter |
| 1456 | 5 MW Wind Power Project of Alembic Ltd at Bhavnagar , Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 17,137 | CERs | Retirement Beneficiary - AFRIFLORA, Reason for cancellation - I want to contribute to climate action. | 23/07/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. P. Balaji Chief Regulatory & Corporate Affairs Officer, Vodafone Idea Ltd. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 1,963 | CERs | "For Climate Neutrality Purposes" | 21/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 4,975 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON S.A. identificado con NIT 811.026.709-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 13/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 32 | 22/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,250 | CERs | Retirement- Beneficiary: Anaconda Carbon Retirement reason details: Voluntary compensation from Uber Costa Rica to offset GHG emissions for 5.85M kilometers made by Anaconda Carbon | 29/10/2019 | Attestation letter |
| 7289 | Jiangxi Xiajiang Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 799,485 | CERs | “Entwertung der CO2-Zertifikate für Grüngasprodukte von Eprimo” | 22/12/2021 | Attestation letter |
| 0363 | Angkor Bio Cogen Rice Husk Power Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal ; Agriculture |
Cambodia | 2,000 | CERs | Voluntary certification as for the benefit to Ministry of Environment of Cambodia | 19/09/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,076 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Airport | 11/05/2022 | Attestation letter |
| 2347 | 150 MW grid connected Wind Power based electricity generation project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 4,000 | CERs | Purpose: "Voluntary cancellation in favor of offsetting GHG emissions of the Asian Development Bank’s Headquarters in Manila, Philippines for 2020" Beneficiary: "Asian Development Bank" | 29/09/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Cancelación voluntaria realizada por Anaconda Carbón a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 43 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de mayo 2022. | 22/09/2022 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 1,271 | CERs | on behalf of GP-29 | 09/08/2022 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 11,500 | CERs | Neutralizacao das emissoes de gases de efeito estufa dos escopos 1, 2 e 3 do periodo de 1999 a 2019 da AES Brasil Energia S.A., cujas emissoes foram estimadas por meio de um estudo realizado por uma consultoria contratada. | 11/10/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 28 | CERs | In the months 15th August - 14th October Furthr retired 28 tons of carbon with Carbonbay | 20/10/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 28 | 22/12/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 3,000 | CERs | ACT Commodities Retired on behalf of Provisions Carbon Better Energy Customers | 13/10/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | OFFSET ON BEHALF OF: Compensación carbono | Islandia 11-18 enero | Huakai Travel S.L. REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 10/02/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 579 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften der Captiva GmbH in den Lieferjahren 2021-2023 | 22/10/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 36 | CERs | Voluntary cancellation made by Anaconda Carbon S.A. on behalf of Agrícola el Cántaro S.A (Finca y Beneficio de Café Santa Anita) to offset emissions for 36 CERs aditional generated by the company Operations during the year of 2018 | 12/11/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 21,996 | CERs | Cancelación voluntaria a favor de BIOMAX COMBUSTIBLE S.A (NIT 830136799-1) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/11/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 500 | CERs | Klimaneutraler Geschäftsbetrieb der MATSEN CHEMIE AG im Jahr 2020 sowie klimaneutrale Produkte. Dieses Zertifikat bestätigt hierzu die Neutralisierung von 500 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 500 Gold Standard CERs des Projekts "IOT Mabagas Limited power plant, Pudhuchatram" aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 18/11/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 216 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 216 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 216 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 18/11/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 424 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by DESTILERIA RIOPAILA (NIT 900.196.493-3, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 256 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by BOGOTÁ LIMPIA S.A.S E.S.P (NIT 901.144.843-9), (modified from : “BUS BENZ S.A.S (NIT 900.013.269-5)”), in order to not cause the national carbon tax. | 28/12/2018 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 709 | CERs | Voluntary cancellation in favours of Distribuidora Andina de Combustibles SAS (NIT 8600002554-8) for neutralization of the GHG emissions associated, to be used by Cemex Colombia (NIT 860002523-1), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,768 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by RENTING COLOMBIA S.A.S (NIT 811.011.779-8), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 9933 | Improved Cook Stove Project 1, Nkhata Bay District, Malawi | Energy demand | Malawi | 1 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 25/05/2022 | Attestation letter |
| 3570 | Alto Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 17,042 | CERs | Voluntary cancellation in favor of PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) for the neutralization of 17,042 tons of CO2 associated with fossil fuels to be used by PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) in order not to cause the national carbon tax. | 05/09/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Ali Hussein. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 30 | CERs | Retirement – Beneficiary: Anaconda Carbon Retirement Reason Details: Voluntary cancellation made by Anaconda Carbon on behalf of VIDA STUDIO for all GHG emissions originated from their operations during the year of 2019. | 23/01/2020 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 123 | CERs | Grupo BMV comprometido con la Sostenibilidad otorga un apoyo económico a favor del proyecto de conversión de gas de vertedero en energía, establecido en Durango, México y desarrollado por Biogas Technology Ltd., con el propósito de compensar 123 emisiones GEI generadas por el 11vo Foro de Emisoras. BMV Group, committed to Sustainability, grants economic support in favor of the project to convert landfill gas into energy, established in Durango, Mexico and developed by Biogas Technology Ltd., with the purpose of offsetting 123 GHG emissions generated by the 11th Forum of Stations. | 04/07/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 13 | CERs | Voluntary Cancellation of 13 CERs for transaction no. 941-945 (KAL) | 17/12/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 73 | CERs | Environconsult | 05/04/2022 | Attestation letter |
| 9154 | Wind Power Project at Jath, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 112,954 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 31/05/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 1,036 | CERs | Ministère de l'Europe et des Affaires Étrangères (MEAE) | 10/03/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 602 | CERs | October 2021 Cool Effect Platform Sales: UPMSIC2016 | 29/11/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 93 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ABUCHAIBE RAMIREZ (NIT 900.971.341, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 8344 | Hebei Wuqiao Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 3,048 | CERs | Retired on behalf of Ecohai Co., Ltd. | 06/09/2022 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 53,696 | CERs | on behalf of GP-2 | 09/08/2022 | Attestation letter |
| 6797 | Joburg Landfill Gas to Energy Project | Waste handling and disposal | South Africa | 224,814 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 and specifying the organisation’s name and carbon offset administration system account number into which the offsets must be listed | 19/10/2020 | Attestation letter |
| 4844 | Zhangjiakou Chabei Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 652,129 | CERs | ClimatePartner GmbH submits these Carbon Offsets on behalf of GE Renewable Management to offset the carbon and carbon equivalent emissions of GE Renewable Energy specifically for GE Renewable Energy’s CarbonNeutral® company certification (year 2020) | 11/06/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Indian Oil Corporation Ltd . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4338 | Thanh Thuy Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 8,325 | CERs | Retired on behalf of Eni Gas and Power to offset carbon footprint of its clients | 10/09/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 6 | CERs | CERs Donated by Hangzhou Chaoteng Energy Technology Co.,Ltd to offset GHG Emissions generated from the Third "Environmental Steward" Forum -- Market Opportunities for Environmental Consulting under the Background of Carbon Peak and Carbon Neutralization | 23/09/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 12 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for January and February 2022 sales | 22/03/2022 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 122,624 | CERs | This request is submitted to cancel the 122,624 CERs issued from Sihwa Tidal Power Plant CDM Project and use them as offest in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 24/07/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 468 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 348 999,00 kms of riders using UberPLANET and 3 497 890,00 kms of riders using UberX during April 2021 made by A-CO2 | 11/05/2021 | Attestation letter |
| 6083 | Omnia N2O Abatement Project II | Chemical industries | South Africa | 1 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 16/11/2020 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 9 | CERs | OFFSET ON BEHALF OF: Oquendo Capital SGEIC-SA REASON FOR COMPENSATION: 2021 - Organization Carbon Footprint | 19/05/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 139 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Accenture para compensar las emisiones GEI generadas durante el periodo 2019-2020 y cumplir con la Declaratoria de Carbono Neutralidad de la Direccion de Cambio Climático y el PPCN. | 18/08/2021 | Attestation letter |
| 4930 | Vaayu India Wind Power Project in Tamilnadu | Energy industries (renewable - / non-renewable sources) | India | 160,551 | CERs | Voluntary cancellation of 160,551 CERs for the purpose of conversion to Gold Standard VERs from project GS4425. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 04/08/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 6,926 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis Betim Powertrain. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 8474 | Maracanã Small Hydropower Project | Energy industries (renewable - / non-renewable sources) | Brazil | 20,000 | CERs | Purpose: Crédito Coche Carbono Neutral Beneficiary: Banco Santander S.A. | 13/06/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 99 | CERs | Por la compensación de 99 toneladas de CO2 e generadas en la XXXIV Convención de la Cámara Nacional de la Industria de Conservas Alimenticias (CANAINCA) | 06/08/2019 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Energy Efficiency Services Limited (EESL). EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 830 | CERs | 2020-0008 | 2020 | 11/11/2020 | Attestation letter |
| 0941 | Sudokwon Landfill Gas Electricity Generation Project (50MW) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 5 | CERs | Sudokwon Landfill Site Management Corp. aims to offset GHG emissions generated from the GHG Reduction Declaration Ceremony to Build the Environmentally Friendly and Low-Carbon Landfill on 16/12/2019 and programs to educate engineers how to reduce GHG emissions in the field(16/l2/2019~31/12/2019). Participants include: - SL Corp: JooWon Seo (President), SangPyung Kim, DonSik Ryu, WonGu Hwang, SeeWon Kim, HyunGyung Kang, HyunJeong Kim, SeongHoon Gwak, YeaSeop Shim, WooRam Jin, JunByeong Lee, GiWoon Kwon, Yu Ri Jung, ChoonTaek Jeon, TaeHyeong Hong, SeungHo Lim, SeiYeon Jeon, SungHwan Moon, JaiKwan Ryou, JungWoo Park, BongMin Shin, DongHoon Kim, SeungByung Jeon, SangKyun Kim, JungHyun Seo, SeokGi Park, SeoHee Im, ByungChul Shin, - Presidential Committee on Green Growth : JungWk Kim (Chairperson), also a Professor Emeritus at Graduate School of Environmental Studies, SNU - Green Energy Development Co., Ltd: SongHo Yun - Eco&Partners : DongHyeok Kwon, SeJun Son | 09/12/2019 | Attestation letter |
| 7093 | Los Cocos Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 1,000 | CERs | Retirement Beneficiary : MEZCAL AMORES Carbon Neutrality Program 2020. Retirement for the offset of the entire product life cycle emissions in 2019, this in accordance with GHG Protocol and ISO14064-1. The Carbon Neutrality Program covers controlled activities in agricultural operations and processing plants, but also includes uncontrolled activities resulting from the transportation and manufacture of raw materials (glass bottles, plastics, metals,…), worldwide maritime and land distribution of products, and final disposal of packaging material. | 18/11/2020 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 855 | CERs | Retired on behalf of Ubisoft Entertainment. | 18/05/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mr Roger Francis BAYLISS” for Annual Dinner in 2021 (Transaction ID: 742) | 22/02/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,997 | CERs | MV0615 | 2020 | 16/12/2020 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1 | CERs | Voluntary cancellation on behalf of Pricerite Home Limited to offset its carbon footprint | 23/09/2022 | Attestation letter |
| 9973 | Biomass based power plant in Mahendargarh, Haryana | Energy industries (renewable - / non-renewable sources) | India | 300 | CERs | “I want to contribute to the fight against climate change” | 20/08/2019 | Attestation letter |
| 1575 | Kadamane Mini Hydel Scheme-1 (KMHS-1) | Energy industries (renewable - / non-renewable sources) | India | 4,002 | CERs | Voluntary carbon offsetting - transaction no. CE-202208603 | 29/08/2022 | Attestation letter |
| 9973 | Biomass based power plant in Mahendargarh, Haryana | Energy industries (renewable - / non-renewable sources) | India | 10,192 | CERs | "Carbon Neutrality for Prishtina International Airport" | 29/05/2019 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 67,450 | CERs | on behalf of ESB Energy | 10/12/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 37 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de APROCETU para compensar las emisiones de GEI generadas por la huella operacional en Costa Rica durante el año 2020, para cumplir con loa requisitos del PPCN. | 10/05/2021 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 123 | CERs | Purpose: Compensação de emissão da TUSSOR CONFECCOES LTDA, localizada em RUA MAURO, 150 Rio de Janeiro/RJ. Beneficiary: TUSSOR CONFECCOES LTDA | 19/03/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 166 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 166 ton of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” Reference month: March 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 166 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Mês de referência: Março de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 14/04/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Kickoff CBL Altran (digital) | 30/07/2021 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 200 | CERs | Offset the GHG emissions from exhibition arrangement, venue operation and staff's daily life and transportation during Shenzhen Creative Week and the 37th Shenzhen International Furniture Exhibition | 07/07/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 493 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by EASYFLY S.A. NIT 900088915-7, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 73 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 73 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: April 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 73 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Abril de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Stand ACCIONA COP 25 Madrid 2019 | 07/04/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 6,300 | CERs | Cancelación voluntaria a favor de DISTRIBUIDORA DE COMBUSTIBLES DISCOM SAS (NIT 901160786-4) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/11/2021 | Attestation letter |
| 2746 | Dagachhu Hydropower Project, Bhutan | Energy industries (renewable - / non-renewable sources) | Bhutan | 4,056 | CERs | "To offset greenhouse gas emissions attributable to the 52nd Annual Meeting of the Board of Governors of the Asian Development Bank held in Nadi, Fiji on 2-5 May 2019." Beneficiary: Asian Development Bank | 23/06/2020 | Attestation letter |
| 8606 | Wind Power Project at Vaspet, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 377,235 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 31/05/2022 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 13 | CERs | Voluntary cancellation on behalf of BAIA BELLA to offset carbon emissions for 2021's season of their beach club in France. | 04/07/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 935 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 935 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 935 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 04/04/2022 | Attestation letter |
| 3937 | Nanyang Landfill Site LFG Recovery to Electricity Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
China | 22,012 | CERs | Cancelled on behalf of STX client with ID number: POS-30482-39537 for 2022/2023 usage. | 16/03/2022 | Attestation letter |
| 8012 | Grid connected electricity generation from renewable source: Windfarm Complex Santa Vitória do Palmar and Chuí | Energy industries (renewable - / non-renewable sources) | Brazil | 1,931 | CERs | Transbrasa Transitária Brasileira Ltda Compensação de 1.931 toneladas de CO2e referente as emissões de GEE (gases de efeito estufa) provenientes das operações logísticas da Transbrasa no ano de 2021. Offsetting of 1,931 tons of CO2e referring to GHG emissions (greenhouse gases) from the logistics operations of Transbrasa in 2021. | 08/07/2022 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 2,620 | CERs | Not shared | 27/03/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1 | CERs | OFFSET ON BEHALF OF Orchlon E REASON FOR COMPENSATION Offsetting my personal footprint. | 30/08/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 320 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TEAM ALLIANCE LTDA (NIT 900.178.152-0), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 257 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES MEDELLIN CASTILLA (NIT 890.902.816-3, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación Carbono | Nueva York 29 Diciembre- 3 Enero | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 10/01/2022 | Attestation letter |
| 0693 | Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 15,925 | CERs | On behalf of WeNow’s customers | 19/12/2018 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 830 | CERs | These credits were retired on behalf of Fristads AB to compensate for greenhouse gas emissions associated with the production of their Outdoor collection. | 09/02/2022 | Attestation letter |
| 0258 | Nueva Aldea Biomass Power Plant Phase 1 | Energy industries (renewable - / non-renewable sources) | Chile | 15,630 | CERs | Retired on behalf of SCX - Banco de Chile- "Neutralización HdC 2016 - SCX ID 0074-E2004A57" | 14/06/2019 | Attestation letter |
| 6560 | Patrind Hydropower Project | Energy industries (renewable - / non-renewable sources) | Pakistan | 225,276 | CERs | This requst is submitted to cancel the CERs issued from Patrind Hydropower Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 04/08/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 13 | CERs | Voluntary cancellation of 13 CERS to offset the CO2e emissions of Diamond Hotels Playacar, employee and laundry transportation of 2018 | 15/02/2019 | Attestation letter |
| 3057 | Qichun Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 22,242 | CERs | CO2-Neutralstellung der Kasseler Verkehrs- und Versorgungs-GmbH (KVV), Städtische Werke Netz + Service GmbH (NSG), Städtische Werke AG und der Kasseler Verkehrs-Gesellschaft (KVG)* im Zeitraum vom 01/2019 bis 12/2019. * Dies beinhaltet zusätzlich auch die Fahrleistungen, die von den von der KVG beauftragten Subunternehmen erbracht wurden. | 28/01/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 500 | CERs | Voluntary cancellation to offset the GHG generated from operation of Shatoujiao Street Office in Yantian District, Shenzhen City from January 1, 2021 to December 31, 2021. | 23/05/2022 | Attestation letter |
| 8917 | 10 MW Solar Photovoltaic Power Plant in Rajkot, Gujarat (India) | Energy industries (renewable - / non-renewable sources) | India | 56,340 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients | 06/10/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2,337 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - EROM | 12/05/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 7,308 | CERs | Titular: Santander Consumer USA Concepto: Santander Bank carbon footprint offsetting 2020 Titular: Santander Consumer USA Concepto: Santander Bank carbon footprint offsetting 2020 | 05/11/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de GRUPO DANISSA para compensar las emisiones GEI del voluntariado Marino Baulas (PV Agencia Datsun Liberia) | 29/09/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 825 | CERs | Retirement-Beneficiary: Asociación de Servicios Médicos Costarricenses (ASEMECO). Retirement reason details: Cancelación Voluntaria realizada por la Asociación de Servicios Médicos Costarricenses (ASEMECO) para compensar sus emisiones de CO2 equivalente correspondientes al período de 1 de enero al 31 de diciembre del año 2018, como requerimiento para cumplir con su Programa de Carbono Neutralidad. | 20/06/2019 | Attestation letter |
| 3307 | Pingtou 180MW Hydropower Project in Sichuan Province | Energy industries (renewable - / non-renewable sources) | China | 29,537 | CERs | “retired on behalf of Nordic Leisure Travel Group AB for Scope emissions of 2022/2023” | 26/09/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 679 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 679 tons of greenhouse gas (GHG) emissions of the CBO FLAMENGO vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 679 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO FLAMENGO.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 0373 | São João Landfill Gas to Energy Project (SJ) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 38,525 | CERs | Retirada permanente de circulação do mercado em nome da GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. referente a neutralização das emissões corporativas de Escopo 3 do ano de 2018. O inventário de gases de efeito estufa foi auditado pela Associação Brasileira de Normas Técnicas - ABNT. Retirement on behalf of GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. referring to corporate emissions of Scope 3 of the year 2018. The greenhouse gas inventory was audited by Associação Brasileira de Normas Técnicas - ABNT.” | 25/11/2019 | Attestation letter |
| 5425 | Wind Power Project of Hindustan Platinum in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 45 | CERs | Retired for the Carbon Neutrality of Family of Mr. Vasant Nath | 27/11/2018 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 102 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 102 tons of greenhouse gas (GHG) emissions of the CBO BIANCA vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 102 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO BIANCA.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 3065 | Hunan Yueyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 39,127 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 06/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 30 | 22/12/2020 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 3,300 | CERs | Compensación de la huella de carbono – Certificado de Compensación B650_10 | 23/12/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Sandeep Singh,Chief Executive Officer Shuddhoday PMPL. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4531 | Improving Rural Livelihoods Through Carbon Sequestration By Adopting Environment Friendly Technology based Agroforestry Practices | Afforestation and reforestation | India | 3,057 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 25/06/2020 | Attestation letter |
| 7650 | West Huaybong 2 wind farm project | Energy industries (renewable - / non-renewable sources) | Thailand | 50,000 | CERs | Retired on behalf of Ecologi Action Ltd | 19/10/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,997 | CERs | 2018-0554 | 2020 | 11/11/2020 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 44,024 | tCERs | Beneficiary Company: Sterling and Wilson Solar Limited Remarks: “Offsetting our Carbon Footprint for FY 2019-20, to Empower a Renewable Future”. | 20/07/2020 | Attestation letter |
| 7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | Energy industries (renewable - / non-renewable sources) | Madagascar, Ethiopia, Kenya, Malawi, Mozambique, Nigeria, Uganda, Zambia, Chad, Dominican Republic, Côte d`Ivoire, Liberia, Rwanda, Sierra Leone, Namibia, Zimbabwe, Ghana, South Africa, Somalia | 34,076 | CERs | CERs that the UK Department for Business, Energy and Industrial Strategy (BEIS) purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated June 03, 2020 | 09/06/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2018-0377 | 2020 | 11/11/2020 | Attestation letter |
| 1797 | 15 MW grid-connected wind power project by MMTC in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 26,700 | CERs | Schlagmann Poroton GmbH & Co. KG is offsetting GHG emissions associated with the production of premium clay brick products at the production site in Zeilarn (Bavaria/Germany) in the year 2021 | 08/12/2020 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | Retired on behalf of Schüller Möbelwerk KG | 30/09/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,622 | CERs | 2019-1199 | 2020 | 11/11/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 86 | CERs | Retiro a favor de PETROBRAS COLOMBIA COMBUSTIBLES SA identificado con NIT 900047822-5 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 86 Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3 | CERs | Mitigación de la Huella de Carbono de Andrea A Jimenez Labra | 05/05/2022 | Attestation letter |
| 10269 | Renewable Power Project by Hindustan Gum (EKIESL-CDM.August-15-01) | Energy industries (renewable - / non-renewable sources) | India | 781 | CERs | DEW21 Öko Erdgas 2021/2022 | 01/04/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 380 | CERs | Offset on behalf of: Nunsys S.L. Reason of compensation: I am offsetting the carbon footprint of my company's trips | 17/11/2021 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 846 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Cooklane Tetuán para compensar la generación de GEI derivadas de su operación para el periodo de setiembre 2020 a setiembre 2021 | 30/03/2021 | Attestation letter |
| 3057 | Qichun Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 9,283 | CERs | CO2-Neutralstellung der Kasseler Verkehrs- und Versorgungs-GmbH (KVV), Städtische Werke Netz + Service GmbH (NSG), Städtische Werke AG und der Kasseler Verkehrs-Gesellschaft (KVG)* im Zeitraum vom 01/2018 bis 12/2018. * Dies beinhaltet zusätzlich auch die Fahrleistungen, die von den von der KVG beauftragten Subunternehmen erbracht wurden. | 28/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action - TR 39 | 22/12/2020 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 163 | CERs | Beneficiary of the cancellation: SAIP Reason for cancellation: Offsetting of 2021 Scope 1 and 2 emissions | 19/10/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 20 | 22/12/2020 | Attestation letter |
| 2954 | Guangdong Taishan Shangchuandao Island Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 39,519 | CERs | Retired on behalf of Fokus Zukunft GmbH & Co. KG | 01/11/2019 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 15/09/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 35 | CERs | Partenariat Français de l'Eau | 05/04/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 5 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CEMEX COLOMBIA (NIT 860.002.523, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 4,000 | CERs | These carbon credits have been brought and retired on behalf of CarbonClick users for the purpose of offsetting their emissions | 28/06/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Uflex Limited. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 3531 | Adavikanda, Kuruwita Division Mini Hydro Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 3,123 | CERs | To offset GHG-emissions from Tailor Store business activities in July 2018 - June 2020 | 30/12/2020 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 19 | CERs | REESO | 05/04/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 23 | CERs | Concepto: Carbon footprint offseting of the company trips. Beneficiario: Vandersol Unipessoal Lda | 12/02/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 52 | CERs | Voluntary Cancellation of 52 CERs for transaction no. 473 on www.clpcarboncredits.com | 08/10/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 27 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 105 848,0 kms of riders using UberFLASH during August 2020 made by A-CO2 | 09/09/2020 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 2,888 | CERs | Retired on behalf of Concha y Toro - Neutralización SUNRISE 2020 - SCX ID 0035-E0102A17 | 01/02/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Yashraj Bharadwaj CEO, Co-Founder, Zenith Vipers Group. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,372 | CERs | 2019-1604 | 2020 | 11/11/2020 | Attestation letter |
| 3222 | BRASCARBON Methane Recovery Project BCA-BRA-08, Brazil. | Waste handling and disposal | Brazil | 20,000 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 26/05/2020 | Attestation letter |
| 5136 | CGN Guangdong Duanfen Wind Power Project | Energy industries (renewable - / non-renewable sources) | China | 306 | CERs | Operational emissions and customer emissions neutralization by Industrial Bank Co.,Ltd. | 10/12/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,272 | CERs | 2019-1432 | 2020 | 11/11/2020 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 1 | CERs | Cancelled for the purposes of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 05/11/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 30,477 | CERs | Compensation of Carbon Footprint for year 2019 of Acciona Energia | 18/05/2020 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 150,000 | CERs | LifeGate Impatto Zero per Postepay | 27/05/2022 | Attestation letter |
| 7100 | Los Cocos II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 1,469 | CERs | “Retirement Beneficiary : Cibao International Airport (AIC). Retirement for the offset of controlled emissions in 2019 in accordance with the Airport Carbon Accreditation program, Level 3+ Carbon Neutrality. The retirement covers direct emissions from own process and activities; indirect emissions due to the use of electricity; and business travel emissions”. | 14/02/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 169 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 169 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 182 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 20/09/2021 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 890 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften Lange Str. 31, 10243 Berlin, Mohrenstr. 32, 10117 Berlin, Hausvogteiplatz 13, 10117 Berlin, Leipziger Platz 11, 10117 und Holzmarktstr. 15, 10179 Berlin der Art-Invest Real Estate Funds GmbH in 2025 | 06/12/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 91,979 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT-860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 12/08/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3,242 | CERs | PwC 2019 Carbon Offset Purchase | 24/04/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 10 | CERs | Voluntary cancellation in favor of ENERGIZAR; NIT 830095213-0 for neutralization of the GHG emissions, to be used by EASYFLY S.A., NIT 900088915-7,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 823 | CERs | “Compensação voluntária em nome da UNIMED CAMPINAS. 823 toneladas de CO2 foram voluntariamente compensadas, referentes as emissões de gases de efeito estufa da UNIMED CAMPINAS (Escopo 1, 2 e 3), do ano de 2020.” | 12/11/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 769 | CERs | Voluntary cancellation in favours of Distribuidora Andina de Combustibles SAS (NIT 8600002554-8) for neutralization of the GHG emissions associated, to be used by Ingenio Carmelita (NIT 891900196-1), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 3,300 | CERs | Delhi’s IGI Airport is the first “Level 4+, Transition” accredited Airport in the Asia Pacific region, under ACI’s Airport Carbon Accreditation Program. The airport is offsetting the residual emissions under Scope 1, Scope 2 & Scope 3 (employee business travel related emissions) for the year 2020, through these carbon credits. The airport has also aligned its long term emission reduction targets in line with IPCC’s 1.5 Degree scenario and currently working towards becoming a “net zero carbon emission airport by 2030”. | 12/07/2021 | Attestation letter |
| 9181 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – India |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
India | 46,504 | CERs | Retirement on behalf of Climate Impact Partners for Customer ID 00080835 | 08/09/2022 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 362,379 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 11/10/2019 | Attestation letter |
| 0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | Waste handling and disposal | Brazil | 2 | CERs | Compensación huella de carbono de mis clientes. lalfaro@itec.cat1600170989547491 | 29/10/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 376 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 376 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 376 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 18/11/2021 | Attestation letter |
| 9943 | Canhanduba Landfill Project | Waste handling and disposal | Brazil | 55 | CERs | ALLCOT Group 2019 emissions offset | 05/11/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 2,250 | CERs | Cancelamento voluntário em nome da Enel Distribuição São Paulo (Eletropaulo Metropolitana Eletricidade de São Paulo S.A.) para compensação de emissões de gases de efeito estufa de escopo 1 relativas ao ano de 2020. / Voluntary cancellation on behalf of Enel Distribuição São Paulo (Eletropaulo Metropolitana Eletricidade de São Paulo S.A.) to offset scope 1 greenhouse gas emissions of 2020. | 09/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by PISCANO S.A.S (NIT 815.003.256-9, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1,006 | CERs | UPMISC2018 – July Sales | 30/08/2021 | Attestation letter |
| 3858 | Nam Ngan Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 1,752 | CERs | Retired on behalf of Natural Habitat Adventures to achieve carbon neutrality | 15/11/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 10,000 | CERs | Retired on behalf of FZ | 30/09/2022 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 50 | CERs | To Neutralize the Carbon Emission generated by Beijing Jinshuo Law Firm in 2021. | 10/10/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 5,009 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 13/01/2022 | Attestation letter |
| 0275 | Santa Ana Hydroelectric Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 6,745 | CERs | Voluntary cancellation in favor of Puma Energy Colombia Combustibles SAS (NIT 900497906-5) for neutralization of the GHG emissions associated with fossil fuels used by Puma Energy Colombia Combustibles SAS (NIT 900497906-5), in order to not cause the national carbon tax. | 13/12/2018 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 25 | CERs | To offset 2020 carbon footprint of Fiorino Architects LLC, 221 N Maple St Addison, IL 60101 USA | 05/03/2021 | Attestation letter |
| 6143 | EOLO Wind Power Project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 40,000 | CERs | Cancellation by ClimateCare on behalf of the Worldbank to offset Worldbank 2018 Operational Emissions | 14/06/2019 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 13,112 | CERs | on behalf of GP-7 | 09/08/2022 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 10,143 | CERs | Cancelled on behalf of Motor Depot | 11/11/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Cancelled for FZ | 06/02/2020 | Attestation letter |
| 8480 | Distribution of ONIL Stoves—Guatemala | Energy demand | Guatemala | 739 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 05/03/2020 | Attestation letter |
| 4939 | Uganda Nile Basin Reforestation Project No 1 | Afforestation and reforestation | Uganda | 61 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 16/11/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Prabhat Kumar,National Programme Manager (Technical) Energy Efficiency Services Limited (EESL). EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Inshu Minocha,Principal Consultant Steer Group India. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 29,838 | CERs | Voluntary cancellation of CERs was made on behalf of FCA Goiana - Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 05/09/2019 | Attestation letter |
| 6160 | Wind Power Project in Tinwari, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 35,465 | CERs | Voluntary cancellation of 35,465 CERs for the purpose of conversion to Gold Standard VERs from project GS6004. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 11/05/2021 | Attestation letter |
| 8918 | Palmeras POME Co-composting Project | Waste handling and disposal | Colombia | 74,576 | CERs | PUMA ENERGY COLOMBIA COMBUSTIBLES S A S., identificada con NIT 900.497.906 -5 ha neutralizado en el mes de octubre 2020, 74576 toneladas de CO2 para no causar impuesto sobre el carbono | 16/10/2020 | Attestation letter |
| 10476 | KOKO Kenya - Ethanol Cookstoves Program | Energy industries (renewable - / non-renewable sources) | Kenya | 2,156 | CERs | Voluntary cancellation for use in converting to i-KOCs under the Korean ETS | 28/09/2021 | Attestation letter |
| 4818 | 24 MW Dummagudem Hydel project by SLS Power Corporation Limited | Energy industries (renewable - / non-renewable sources) | India | 47,199 | CERs | 'To Compensate JETBLUE AIRWAY'S 2022 Domestic Emissions' | 24/01/2022 | Attestation letter |
| 4294 | Gwangju metropolitan city sanitary landfill LFG power plant CDM project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 18,904 | CERs | Cancelled CERs will turn into be KOCs(Korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea. | 06/01/2020 | Attestation letter |
| 10392 | 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 60,048 | CERs | Voluntary cancellation of 60,048 CERs for the purpose of conversion to Gold Standard VERs from project GS5575. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 06/05/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 1,040 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 1040 tons of greenhouse gas (GHG) emissions of the AH VALLETTA vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 1040 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH VALLETTA.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 7,364 | CERs | Purpose: I am offsetting greenhouse gas emissions for my companies : TERRA SOL CORP S.A., AGROEDEN CIA LTDA. and SIIM – year 2020 Beneficiary: TERRA SOL CORP S.A., AGROEDEN CIA LTDA. and SIIM | 12/05/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 22 | 22/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 18 | CERs | Beneficiary: Agencia Datsun, S.A. Retirement reason details: Compensación voluntaria hecha por Anaconda Carbon para la carbono compensación de 10,000 kms iniciales de recorrido para 4 unidaded Nissan adquiridas por el Instituto de Desarrollo Rural y 1 unidad Nissan adquirida por la Asociación de Desarrollo Integral de Santa Barbara de Heredia a la Agencia Datsun S.A. | 20/02/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 4,497 | CERs | 2019-0158 | 2020 | 09/11/2020 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 3,993 | CERs | ECOCERT 2021 carbon footprint offset | 01/09/2022 | Attestation letter |
| 5537 | 23.1 MW Wind power project in Telagi, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 136,302 | CERs | Retired on behalf of Takeda Pharmaceutical Company Limited | 31/08/2022 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 518 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of ITB – EQUIPAMENTOS ELÉTRICOS LTDA., to offset CO2 emissions related to the reported GHG Emissions from 2020. | 24/08/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 11,596 | tCERs | Compensação de 11.596 toneladas de CO2 referentes as emissões de GEE provenientes das operações da KPMG no Brasil no ano de 2021. Offsetting of 11.596 tons of CO2 related to GHG emissions produced by KPMG's operations in Brazil in the year of 2021. | 25/03/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 306 | CERs | Retirement – Beneficiary: Comercial de Potencia y Maquinaria S. A.; Retirement Reason Details: Cancelación voluntaria hecha por Comercial de Potencia y Maquinaria S.A. para su estrategia de reducción de emisiones para el Programa de Carbono Neutralidad de Costa Rica de sus emisiones del o1 de enero al 31 de diciembre del 2019. | 15/06/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,515 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - CMA Goiana. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 826 | CERs | Cancelled to neutralize the Carbon Emissions generated by Nanping Ronghuashan Sewage Treatment Co. Ltd in 2021 | 20/07/2022 | Attestation letter |
| 1145 | 8.75MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 10,715 | CERs | Retirement Beneficiary - AFRIFLORA, Reason for cancellation - I want to contribute to climate action. | 26/07/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Voluntary compensation made by Anaconda Carbon on behalf of Coalicion Costarricense de Inicitavas de Desarrollo ( CINDE ) , to offset all GHG emissions from development/operation of their new website for the 1st year of operation and 200K visits | 03/12/2020 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 46 | CERs | Voluntary cancellation of 46 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-11 | 25/02/2022 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 11,924 | CERs | Aposentadoria em nome de Ifood.com Agência de Restaurantes Online S.A., CNPJ 14.380.200/0001-21 | 10/03/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Cancelación evento: Reunión de Directivos de Acciona Infraestructuras 2018 | 25/09/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Deepak Jain Partner - Bain & Company, New Delhi office. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 35,000 | CERs | Retired on behalf of ClimatePartner's customer | 17/05/2021 | Attestation letter |
| 7864 | Recovery and Avoidance of Methane from Industrial Wastewater Treatment Projects | Waste handling and disposal | Indonesia | 13,871 | CERs | Retirement entity: Becton, Dickinson and Company Retirement reason/details: Retired for 2021 sustainability goals | 22/10/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 145 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - Escritório Chile under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 128 | CERs | For Furthr subscribers from October - December | 28/01/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 25 | CERs | Voluntary Cancellation of 25 CERs for transaction no.1152-1156 (MC&CL) | 10/12/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 7 | CERs | Voluntary Cancellation of 7 CERs for transaction no. 548 on www.clpcarboncredits.com | 12/06/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 400 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: WORLD FUEL SERVICES COLOMBIA | 07/09/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 38 | CERs | Retired on behalf of Green Story Inc's and SimpliZero Clients to offset the carbon footprint of their products sales, employee and lifestyle footprint for Jan 2022 to Aug 2022. | 26/09/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mr CHUNG Man Kit, Ivan, JP” for Annual Dinner in 2021 (Transaction ID: 737) | 22/02/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 10,144 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CONSORCIO EXPRESS S.A. (NIT 900.365.740-3, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 0165 | ESTRE’s Paulínia Landfill Gas Project (EPLGP) | Waste handling and disposal | Brazil | 42,100 | CERs | Cancelled on behalf of EnergyAustralia's Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 25/03/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 15 | CERs | Convención Santalucía 2020 | 05/02/2020 | Attestation letter |
| 2486 | Conversion of SF6 to the alternative cover gas SO2 at RIMA magnesium production | Metal production | Brazil | 15,345 | CERs | This operation of voluntary cancellation of Certified Emission Reductions units issued by the Clean Development Mechanism is made for: Créditos de carbono aposentados em nome da Liberty Seguros SA. A Liberty Seguros tem uma estratégia focada na agenda ASG e, a compensação de Carbono faz parte de iniciativas ambientais em que a Liberty tem o compromisso de agir com responsabilidade. | 30/05/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 8,000 | CERs | Retired for Cool Effect on Behalf of Climate Neutral | 30/08/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 37 273,0 kms of riders using UberCOMFORT during June 2020 made by A-CO2 | 06/07/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Raghvinder Singh,Managing Director Continental Carbon India Limited. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 34 | 22/12/2020 | Attestation letter |
| 1259 | Enercon Wind Farm (Hindustan) Ltd in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 4,562 | CERs | Retired on behalf of DNB ASA | 29/05/2019 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 80,543 | CERs | Voluntary cancellation for the purpose of conversion to Gold Standard VERs from project GS4426. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 21/01/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon credits available for voluntary uses - TR 52 | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Convención KIA (digital) | 30/07/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 559 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 676 820,00 kms of riders using UberX during August 2021 made by Anaconda Carbon. | 17/09/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 20 | CERs | OFFSET ON BEHALF OF Sustainable Planet Holdings Ltd | 14/12/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 37 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 07/09/2022 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 113,272 | CERs | “ClimatePartner GmbH submits these Carbon Offsets on behalf of GE Renewable Management to offset the carbon and carbon equivalent emissions of GE Renewable Energy specifically for GE Renewable Energy’s CarbonNeutral® company certification (calendar year 2020).” | 26/07/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 141 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Distribuidora La Florida ( 3-101-295868 ) para compensar las emisiones GEI generadas por la huella operacional en Costa Rica durante el año 2021 y para cumplir con los requisitos del PPCN. | 29/07/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,937 | CERs | 2019-1478 | 2020 | 11/11/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2019-0858 | 2020 | 11/11/2020 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 129,295 | CERs | Naturgas – Verbrauch 2021 CO2-neutrales Erdgas des Energieversorgers: Städtische Werke AG Königstor 3-13 34117 Kassel Deutschland (Germany) Kompensation der CO2-Emissionen aus der Verbrennung von Erdgas für Kunden der Städtische Werke AG. | 15/02/2022 | Attestation letter |
| 9007 | Distribution of Improved Cook Stoves in Sub-Saharan Africa | Energy demand | Senegal, Ghana, Nigeria, Malawi, Zambia, Zimbabwe | 332 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 02/03/2020 | Attestation letter |
| 0258 | Nueva Aldea Biomass Power Plant Phase 1 | Energy industries (renewable - / non-renewable sources) | Chile | 103,544 | CERs | "On behalf of Azura Group Climate Neutral products and offices to offset carbon emissions by additional carbon offset projects for the campaign 2021-2022" | 26/08/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “China Geo-Engineering Corporation” for Annual Dinner in 2021 (Transaction ID: 695) | 18/02/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 136 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 541 809,19 kms of riders using UberECO during August 2020 made by A-CO2 | 09/09/2020 | Attestation letter |
| 2742 | Zafarana KfW IV Wind Farm Project, Arab Republic of Egypt | Energy industries (renewable - / non-renewable sources) | Egypt | 59,244 | CERs | First Climate for Adolf Roth GmbH & Co. KG: ROTH Energie Projekt Windkraft Ägypten | 20/10/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3,451 | CERs | Voluntary compensation from Uber Mexico to offset GHG emissions made by Anaconda Carbon | 06/01/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 26 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 111 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de diciembre 2021. | 24/02/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 894 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - AFS | 12/05/2022 | Attestation letter |
| 6152 | Coke oven gas comprehensive utilization for co-generation project in Shandong Jikuang Morningsun Thermal Power Co., Ltd |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 1,649 | CERs | Offsetting the non-electricity consumption emissions of Scope 1 and Scope 2, for Beijing Wanshou Hotel, located at No.A12 Wanshou Road, Haidian District, Beijing 100036, China, in respect of the reporting period 2021-01-01 to 2021-12-31. | 24/10/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 511 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by BUS BENZ S.A.S (NIT 900.013.269-5), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 549 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 549 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 549 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 09/09/2022 | Attestation letter |
| 0171 | Caieiras landfill gas emission reduction | Waste handling and disposal | Brazil | 7,672 | CERs | Retirada permanente de circulação do mercado em nome da GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A referente a neutralização das emissões corporativas de Escopos 2 e 3 do ano de 2020. O inventário de gases de efeito estufa foi auditado pela Associação Brasileira de Normas Técnicas - ABNT / Retirement on behalf of GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. referring to the neutralization of Scope 2 and 3 corporate emissions of the year 2020. The greenhouse gas inventory was audited by Associação Brasileira de Normas Técnicas – ABNT. | 18/11/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 32 | CERs | This voluntary cancellation of CERs was made on behalf of Adler Pelzer Industria e Comercio de Produtos Plasticos / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,014 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by COLTANQUES SAS NIT 860040576-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 700 | CERs | Contribute to Climate action and become a carbon neutral company(ROBUS) | 03/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,747 | CERs | 2018-0787 | 2020 | 09/11/2020 | Attestation letter |
| 0073 | "Las Vacas" Hydroelectric project | Energy industries (renewable - / non-renewable sources) | Guatemala | 14,085 | CERs | GOPOWER S.R.L. – Compensazione quote emissioni GAS anno 2022 per conto di GOPOWER S.R.L. | 28/09/2022 | Attestation letter |
| 3061 | Tongcheng Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 5,717 | CERs | CO2-Neutralstellung der Kasseler Verkehrs- und Versorgungs-GmbH (KVV), Städtische Werke Netz + Service GmbH (NSG), Städtische Werke AG und der Kasseler Verkehrs-Gesellschaft (KVG)* im Zeitraum vom 01/2018 bis 12/2018. * Dies beinhaltet zusätzlich auch die Fahrleistungen, die von den von der KVG beauftragten Subunternehmen erbracht wurden. | 28/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 6,247 | CERs | 2018-0735 | 2020 | 09/11/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 730 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by LATINOAMERICANA DE CONSTRUCCIONES S.A.S (NIT 800.233.881-4, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 158,681 | CERs | ZEUSS PETROLEUM S.A.S NIT:811043174-1 | 18/09/2019 | Attestation letter |
| 0922 | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of Korea | Chemical industries | Republic of Korea | 287,290 | CERs | CERs to be cancelled in exchange for Korean Offset Credits(KOC), issued by Korean Offset Program to Hanwha Corp. The beneficiary of CERs Cancelled is Hanwha Corp. | 19/01/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 200,000 | CERs | Offset on behalf of Lavazza Group Reason for Compensation: Corporate Carbon Footprint | 11/01/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 368 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of February 2019 | 12/03/2019 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 2,000 | CERs | Retired on behalf of Planetly GmbH. | 06/05/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 753 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 753 tons of CO2 associated with fossil fuels to be used by CONSTRUCCIONES EL CONDOR S.A. (NIT 890.922.447-4) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 1286 | Enercon Wind Farms in Karnataka Bundled Project - 73.60 MW | Energy industries (renewable - / non-renewable sources) | India | 21,506 | CERs | “Offsetting the operational emission of the Hungarian Gas Storage Ltd. in 2022 and 2023.” | 21/09/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 56 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 218.151 kms of riders using UberCOMFORT during January 2020 made by A-CO2 | 12/02/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 320 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CI FRONTIER COAL S.A.S (NIT 802.022.622-5), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 35,000 | CERs | Schlagmann Poroton GmbH & Co. KG is offsetting GHG emissions associated with the production of premium clay brick products at the production site in Zeilarn (Bavaria/Germany) in the year 2020 | 06/12/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 2,534 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by COLTANQUES SAS NIT 860040576-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 8759 | Providencia III: 9.11MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 640 | CERs | Purpose: to offset the Colombian Carbon Tax under Decree 926 of 2017. Beneficiary:CHEVRON PETROLEUM COMPANY with corporate identification number (NIT): 860005223 | 22/04/2022 | Attestation letter |
| 1167 | Bundled wind energy power projects (2003 policy) in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 1,330 | CERs | Beneficiary Name: Al Taiseer Aluminium Company (TALCO), Kingdom of Saudi Arabia Purpose: Offsetting the Carbon Footprints partially, against the “Purchased Electricity and Direct On-site Emissions” accounted during the year 2021" | 16/02/2022 | Attestation letter |
| 3072 | Hunan Yiyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 139,503 | CERs | On behalf of Interstate Gas Supply, Inc. (for IGS Carbon-Neutral Natural Gas customers for 2022) | 25/11/2021 | Attestation letter |
| 5461 | Fatima N2O Abatement Project | Chemical industries | Pakistan | 6,100 | CERs | Retirement-Beneficiary: JoCo Cruise (JPSD Partners, LLC). Retirement Reason Details: Voluntary cancellation on behalf of JoCo Cruise for its estimated marine fuel emissions during the following seven day charter cruise sailings: March 7, 2020 (projected); March 9, 2019; and February 8, 2018. Part of the JoCo Cruise Carbon Roadmap, more details at jococruise.com/carbon | 17/10/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 50 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by CRUSSAR SAS, NIT 901122635-9,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 72,948 | CERs | Retiro a favor de PETROLEOS DEL MILENIO SAS - PETROMIL SAS identificado con NIT 819001667-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 23/09/2022 | Attestation letter |
| 4940 | Uganda Nile Basin Reforestation Project No 2 | Afforestation and reforestation | Uganda | 441 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 09/12/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,229 | CERs | Voluntary cancellation in favours of Distribuidora Andina de Combustibles SAS (NIT 8600002554-8) for neutralization of the GHG emissions associated, to be used by Cemex Transportes (NIT 830078000-7), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 163,755 | CERs | Purpose: Aposentadoria em nome da Unidas S.A. para compensação das emissões dos escopos 1, 2 e Escopo 3, relativos aos inventários dos anos de 2021 a 2025. Beneficiary: Unidas S.A. | 30/07/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8 | CERs | Stand ACCIONA Inmobiliaria – Salón Inmobiliario Internacional de Madrid (SIMA) | 20/09/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 200 | CERs | Retired on behalf of Cool Effect for the month of March 2021. | 16/04/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “HKUST Civil and Environmental Engineering Alumni Association” for Annual Dinner in 2021 (Transaction ID: 699) | 18/02/2021 | Attestation letter |
| 7369 | Wind Power Project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 7,351 | CERs | Retirement on behalf of Fokus Zukunft GmbH & Co. KG | 11/07/2019 | Attestation letter |
| 0547 | Facilitating Reforestation for Guangxi Watershed Management in Pearl River Basin | Afforestation and reforestation | China | 18,619 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 04/12/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 251 | CERs | Algorand offsetting the carbon footprint of company events | 14/12/2021 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 656 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 656 tons of greenhouse gas (GHG) emissions of the CBO Wiser vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 656 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Wiser.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 186,695 | CERs | Retired on behalf of Eni Gas and Power to offset carbon footprint of its clients | 01/09/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA (NIT 899.999.094-1) | 09/10/2020 | Attestation letter |
| 9990 | Mampuri Wind Power Project 3 | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 2,083 | CERs | To compensate for CO2 emissions from 142 political rallies of His Excellency Gotabaya Rajapaksa's Presidential Campaign in 2019 | 23/01/2020 | Attestation letter |
| 9342 | Kaladonger wind power project in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 124,176 | CERs | Jera Global Markets | 12/07/2019 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 100 | tCERs | Cancellation for conversion to VCUs. | 01/12/2020 | Attestation letter |
| 0806 | Demand side energy efficiency programmes for specific technologies at ITC Bhadrachalam pulp and paper making facility in India |
Energy industries (renewable - / non-renewable sources)
; Energy demand ; Manufacturing industries |
India | 170 | CERs | Voluntary cancellation for Carbon neutrality of ITC Diary 2022 | 14/12/2021 | Attestation letter |
| 8756 | Providencia I: 1.8MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 14,300 | CERs | Purpose: internal offsetting and reporting of the corporate carbon footprint. Beneficiary: Mineros Aluvial S.A.S. BIC with corporate identification number (NIT) 901.218.630-6 | 22/04/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 318 | CERs | Retirement- Beneficiary: Anaconda Carbon Retirement reason details: Voluntary compensation to offset GHG emissions related to 1.3 million kms of riders using UberECO during November 2019 made by Anaconda Carbon | 05/12/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación carbono | Egipto 1-12 diciembre |Huakai Travel S.L. | 22/12/2021 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 18,236 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of DIAGNÓSTICOS DA AMÉRICA S.A., to offset CO2 emissions related to the reported GHG Emissions from 2020. | 07/07/2022 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 10,500 | CERs | " Offsetting Carbon emissions by Nouveau Diamonds LLP for FY 2020-21 " | 19/07/2021 | Attestation letter |
| 4634 | Piedra Larga Wind Farm | Energy industries (renewable - / non-renewable sources) | Mexico | 51,072 | CERs | Clientes de TIP | 27/06/2022 | Attestation letter |
| 2199 | 48 MW Duduluo River Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | China | 30,000 | CERs | Retired on behalf of FZ | 01/03/2022 | Attestation letter |
| 3958 | CTR Candeias Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 352,735 | CERs | Retired on behalf of DL 2021 CN | 27/09/2021 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 989 | CERs | To Neutralize the Carbon Emission generated by Beijing Poly Ying Real Estate Development Co.,Ltd. in 2021. | 21/10/2022 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 223,216 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 07/05/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 862 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by CEMEX COLOMBIA SA NIT 860002523-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 48 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de Asociación Hogar de Ancianos San Vicente de Paúl de San Carlos, para compensar las emisiones GEI generadas por la institución durante el año 2019 | 22/01/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,497 | CERs | 2015-339 | 2020 | 11/11/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 208 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 208 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 208 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 20/07/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 615 | CERs | Cool Effect December Platform Sales: UPMSIC2019 | 01/02/2022 | Attestation letter |
| 3558 | Small-Scale Hydropower Project Sahanivotry in Madagascar | Energy industries (renewable - / non-renewable sources) | Madagascar | 30,000 | CERs | MANE Group 2019 | 23/12/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,471 | CERs | Voluntary cancellation on behalf of Adobe Rent A Car in Costa Rica, in order to offset the net greenhouse gas emissions associated with the operation during calendar year 2019 (from January 1st to December 31, 2019). | 10/05/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 228 | CERs | Retired for Furthr's subscribers & benefit users in January - March 2022 | 25/04/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,996 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 07/09/2022 | Attestation letter |
| 4677 | Vaayu India Wind Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 37,368 | CERs | Voluntary cancellation of 145,953 CERs for the purpose of conversion to Gold Standard VERs from project GS4603. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 11/08/2022 | Attestation letter |
| 1366 | Biomass generation project, in Sheyang county, Jiangsu province, P.R. China | Energy industries (renewable - / non-renewable sources) | China | 100,000 | CERs | Voluntary Cancellation on behalf of IGS Energy Carbon-Neutral Natural Gas customers for 2023 | 14/01/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 862 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by COLTUGS NIT 900485260-4, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 59,011 | CERs | Voluntary Cancellation of CERs made by Lages Bioenergética, owned by ENGIE Brasil Energia, on behalf of AMBEV S.A. and its Units, to offset CO2 emissions related to the GHG Emissions from 2021. This Certificate is part of the total 206.087 tCO2e covering the following entities (Unit Name and CNPJ): F. Sta. Catarina (07.526.557/0029-00), F. Jaguariuna (07.526.557/0005-33), F. Pernambuco (07.526.557/0021-53), F. Aquiraz (07.526.557/0008-86), F. Camacari (07.526.557/0015-05), F. Teresina (07.526.557/0018-58), F. Cebrasa (07.526.557/0010-09), F. Curitibana (07.526.557/0034-78), F. Rio Janeiro (07.526.557/0046-01), F. Nova Minas (07.526.557/0049-54), F. Jundiai (07.526.557/0053-30), F. Ag. Claras Sul (07.526.557/0040-16), F. Jacareí (07.526.557/0006-14), F. Sapucaia (07.526.557/0039-82), F. Contagem (07.526.557/0051-79), F. Guarulhos (07.526.557/0054-11), F. A. Claras (07.526.557/0012-62), F. Minas (07.526.557/0050-98), F. Agudos (07.526.557/0052-50), F. N. Paraná (07.526.557/0027-49), F. Ccl Pirai (07.526.557/0063-02), F. Uberlandia (33.719.311/0002-45), C. Cachoeiro Macacu (07.526.557/0068-17), C. Wals (01.131.570/0005-07), F. Bohemia (07.526.557/0043-69), Malt Passo Fundo (07.526.557/0042-88), Label SP (07.526.557/0055-00) and Latas Minas (07.526.557/0103-34). | 21/05/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 15,100 | CERs | Retirada permanente de circulação do mercado em nome da GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A referente a neutralização das emissões corporativas de Escopos 1, 2 e 3 do ano de 2021. O inventário de gases de efeito estufa foi auditado pela Ernst & Young. / Retirement on behalf of GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. referring to the neutralization of Scope 1, 2 and 3 corporate emissions of the year 2021. The greenhouse gas inventory was audited by Ernst & Young. | 23/05/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 11,000 | CERs | Voluntary cancellation in favour of PUMA ENERGY COLOMBIA COMBUSTIBLES S.A.S (NIT 900.497.906-5) for the neutralization of the GHG emissions associated with the fossil fuil in order to not cause the national carbon tax according to Dec. 926 de 2017. | 19/06/2019 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 6,391 | CERs | This voluntary cancellation of CERs was made on behalf of FMM Componentes Automotivos / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 1413 | Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project | Waste handling and disposal | Thailand | 111,113 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S.A | 29/12/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 9 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - ISVOR. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 315 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by COLVANES SAS, NIT 860002523-1,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,258 | CERs | Für den durchschnittlichen Verbrauch von Wärme, Wasser und Strom aller OIL! Stationen in Deutschland ist der Ausgleich von 7.752 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der im Jahr 2021 entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung der folgenden Goldstandard CERs aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen: 2.258 Stück aus dem Projekt Sichuan Rural Poor-Household Biogas Development Programme (PoA 2898). | 31/08/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 552 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 552 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” Reference month: January 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 552 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Mês de referência: Janeiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 10/03/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Huakai | Cancelación voluntaria de 1tCO2 por viaje a Asturias y Cantabria Surf Camp | 25 julio - 01 agosto | 02/09/2020 | Attestation letter |
| 8456 | Azito Energie, Phase 3 Expansion from Single Cycle to Combined Cycle | Energy industries (renewable - / non-renewable sources) | Côte d`Ivoire | 474,731 | CERs | DL Carbon Neutrality 2021 | 12/04/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 73 | CERs | Thales Disfrance SA | 10/03/2022 | Attestation letter |
| 0606 | El Canadá Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 6,714 | CERs | BP Technology Ventures Limited requested IBRD as Trustee of the Carbon Funds to cancel emission reductions resulting from its participation in El Canada Project (CDM Ref# 606) per instructions in Cancellation Letter dated 14/01/2021. | 03/02/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Mitigación de la Huella de Carbono de Santiago Higuera Valdés | 05/05/2022 | Attestation letter |
| 3531 | Adavikanda, Kuruwita Division Mini Hydro Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 878 | CERs | To offset the carbon emission of Latex Green Pvt ltd | 30/07/2019 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 5,655 | CERs | Beneficiary: Cabify Mobility International, S.L. Purpose: Compensación huella Cabify 2 trimestre 2021 | 17/08/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 165 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 165 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 165 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 19/12/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 4,247 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de INOLASA para compensar las emisiones GEI generadas durante el año 2020 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climaìtico y el PPCN | 13/10/2021 | Attestation letter |
| 0373 | São João Landfill Gas to Energy Project (SJ) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 779 | CERs | On behalf of BlockC, CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. Em nome da BlockC, os CERs estão sendo voluntariamente cancelados para serem transferidos para o Programa VCS e não foram usados para fins de compensação, nem conformidade obrigatória ou voluntária. | 15/04/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 8,563 | CERs | "Beneficiary: GL Events - COP22 Carbon Offsetting" | 26/06/2019 | Attestation letter |
| 7093 | Los Cocos Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 5,250 | CERs | Retirement Beneficiary : RON BARCELO Carbon Neutrality Program 2020. Retirement for the offset of the entire product life cycle emissions and corporate activity in 2019, this in accordance with GHG Protocol, ISO14067 and ISO14064-1. The Carbon Neutrality Program covers controlled activities in agricultural operations and processing plants, but also includes uncontrolled activities resulting from the transportation and manufacture of raw materials (glass bottles, plastics, metals,…), worldwide maritime and land distribution of products, and final disposal of packaging material. | 18/11/2020 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 421 | CERs | retired on behalf of Planetly GmbH | 15/03/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 67 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade de Serviços de Telecomunicações, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade de Serviços de Telecomunicações by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 40 | CERs | Association Oriane | 05/04/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 19 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Vet and Breakfast Pet Hotel to offset all GHG emissions generated from their operation during 2020 | 05/11/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 171 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: WORLD FUEL SERVICES COLOMBIA | 12/10/2022 | Attestation letter |
| 0194 | Jepirachi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Colombia | 6,047 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Carbon Funds. | 04/06/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,997 | CERs | 2020-0342 | 2020 | 11/11/2020 | Attestation letter |
| 8323 | Grid Connected Gas based Combined Cycle Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 116,417 | CERs | For DL 2021 Carbon Neutrality. | 10/01/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 72 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EUROMOBILIA S.A. para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 04/12/2020 | Attestation letter |
| 4665 | N2O Abatement Project of Capro Corporation | Chemical industries | Republic of Korea | 50,319 | CERs | Cancelled CERs will turn into be KOCs(Korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea. | 19/05/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 44 | CERs | Voluntary cancellation to offset the GHG generated from Bosera Asset Management (International) Co., Limited from January 1, 2021 to December 31,2021. | 20/06/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 769 | CERs | On behalf of Cool Effect. | 10/10/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 145 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 145 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 145 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 15/12/2020 | Attestation letter |
| 3870 | 37.95 MW Wind power project in Bharmasagar, Karnataka by BPEIPL | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients | 12/10/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 50 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 205 344,00 kms of riders using UberPLANET during December 2021 made by Anaconda Carbon. | 14/01/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 13/05/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Sandeep Chandna,Chief Sustainability Officer Tech Mahindra. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 946 | CERs | MV0062 | 2020 | 16/12/2020 | Attestation letter |
| 3858 | Nam Ngan Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 28,062 | CERs | Retirement on behalf of Luigi Lavazza Spa | 02/03/2022 | Attestation letter |
| 3066 | Hunan Qidong Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 7,014 | CERs | Retirement on Behalf of GreenEnergy GPO Members | 14/02/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 33,000 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL S.A identificado con NIT 830.095.213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ORGANIZACIÓN TERPEL S.A | 07/09/2022 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 24 | CERs | Voluntary Cancellation of 24 CERs for transaction no. 684 (7 CERs), 688 (14 CERs) and 772 (3 CERs) on www.clpcarboncredits.com | 21/12/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 36 | CERs | ompensacion voluntaria realizada por anaconda carbon a favor de Popular Seguros para compensar las emisiones GEI generadas por la Escuela San Francisco de Peñas Blancas en el 2019 | 14/12/2020 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 19,749 | CERs | Not shared | 27/03/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 7,064 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by EASYFLY S.A., NIT 900088915-7,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 0809 | Garganta da Jararaca Small Hydroelectric Power Plant (SHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 4,250 | CERs | Voluntary cancellation in favor of PJM Empreendimento Imobiliário Ltda., CNPJ 09.347.935/0001-13, to neutralize the GHG emissions of the construction phase of the building, including materials. | 19/12/2018 | Attestation letter |
| 9007 | Distribution of Improved Cook Stoves in Sub-Saharan Africa | Energy demand | Senegal, Ghana, Nigeria, Malawi, Zambia, Zimbabwe | 748 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 02/03/2020 | Attestation letter |
| 4140 | Shenmu County Hengsheng Coal Chemical Co., Ltd. 30MW Semi-coke Waste Gas Power Generation Project |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 30,436 | CERs | Netjets - Transportes Aéreos, S.A.´s redemption for the compensation of 2021 emissions | 23/03/2022 | Attestation letter |
| 2993 | China Niaoerchao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 50,664 | CERs | Entwertung der CO2-Zertifikate für Grüngasprodukte von Eprimo | 19/11/2021 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 64,474 | CERs | Cancelled on behalf of the Foundation "Zukunft des Kohlenstoffmarktes" | 15/02/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 51 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Forwarding | 12/05/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 71,496 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 03/08/2022 | Attestation letter |
| 0693 | Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 204,247 | CERs | On behalf of WeNow’s customers | 19/12/2018 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 361 | CERs | OFFSET ON BEHALF OF: Club Nàutic S'Arenal REASON FOR COMPENSATION: I am offsetting the carbon footprint of my organization | 28/02/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1 | CERs | OFFSET ON BEHALF OF World Spry Services S.L. REASON FOR COMPENSATION I am offsetting the carbon footprint of my organization | 22/08/2022 | Attestation letter |
| 2025 | Chutak Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | India | 55,377 | CERs | To offset CO2 emissions from fuel gallons delivered. | 28/01/2022 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 1,084 | CERs | Purpose: For every sold XStream separator in Q1 2021, we made a donation to these 2 projects. The amount is based on the CO2 savings that the separators realize on an annual basis for the heating systems. In this way we double the CO2 savings of the XStream! Beneficiary: Flamco Group (Aalberts hydronic flow control) | 28/05/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 8 | CERs | OFFSET ON BEHALF OF NEXOLUB SL REASON FOR COMPENSATION I am offsetting the carbon footprint of my company's freight transport | 10/02/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 622 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Molinos de Costa Rica S.A para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Direccion de Cambio Climático y el PPCN | 10/08/2021 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 20 | CERs | Voluntary Cancellation of 20 CERs for transaction no. 342 on www.clpcarboncredits.com | 20/05/2019 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 25,000 | CERs | “Retired on behalf of Simply Energy ABN 67 269 241 237 as part of its carbon neutral commitments under Climate Active (retail gas) for products sold from 1 January 2021" | 22/10/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 14,303 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Energía | 11/05/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action - TR 13 | 22/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 324 | CERs | Retirement - beneficiary: Comercial de Potencia y Maquinaria S.A. Retirement reason details: Voluntary Cancellation on behalf of Comercial de Potencia y Maquinaria S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018. | 11/06/2019 | Attestation letter |
| 8890 | Bundled Wind Power Project by Peethambra Granites Pvt Ltd (EKIESL-CDM. November -11-01) | Energy industries (renewable - / non-renewable sources) | India | 40 | CERs | “ Following the United Nations theme of CLIMATE NEUTRAL NOW, VNV Advisory Services requests to cancel 40 CERs generated from Bundled Wind Power Project by Peethambra Granites Pvt Ltd (EKIESL-CDM. November -11-01) project for the purpose of making Value Network Venture Advisory Services LLP a carbon neutral company for the FY 2017-18. “ | 04/03/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1 | CERs | "OFFSET ON BEHALF OF Fundación Cotec REASON FOR COMPENSATION I am offsetting the carbon footprint of my company´s events" | 30/03/2022 | Attestation letter |
| 7100 | Los Cocos II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 387,769 | CERs | Towards Delta’s 2020 CN goal | 09/06/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10 | tCERs | P4C - People for Climate Initiative | 30/12/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | Eu, David da Silva Paiva, compensei minha pegada de carbono! | 21/10/2022 | Attestation letter |
| 9973 | Biomass based power plant in Mahendargarh, Haryana | Energy industries (renewable - / non-renewable sources) | India | 15,837 | CERs | Presented to: Kirloskar Oil Engines Limited Reason for cancellation I am offsetting greenhouse gas emissions for my company | 25/07/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,244 | CERs | Offset on behalf of: Banco Santander México, S.A. Reason For Compensation: Huella Banco Santander México | 14/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | Eu, Agnaldo Juarez Pereira, compensei minha pegada de carbono! | 21/10/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 55 | CERs | To offset Only Natural Pet's Mindful Meals product line in the 2nd-4th quarter of 2021. | 07/03/2022 | Attestation letter |
| 9212 | 4.80 MWrenewable energy project by Aleo Manali Hydropower Pvt. Ltd. | Energy industries (renewable - / non-renewable sources) | India | 82,026 | CERs | Retired on the behalf of Ecologi Action Ltd | 20/01/2022 | Attestation letter |
| 5293 | Hebei Shangyi Dongshan Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 26,151 | CERs | Cancelled on behalf of Company | 04/12/2018 | Attestation letter |
| 3773 | Olkaria II Geothermal Expansion Project | Energy industries (renewable - / non-renewable sources) | Kenya | 806 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 03/09/2019 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 2,225 | CERs | Retired on behalf of Signify | 09/09/2020 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 11,108 | CERs | CO2-neutraler Erdgasbezug der Deutsche Investment Kapitalverwaltungsgesellschaft mbH und ihrer Objektgesellschaften für die Lieferjahre 2021-2024 | 22/10/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 18 | CERs | Voluntary Cancellation of 18 CERs for transaction no. 578 on www.clpcarboncredits.com | 12/06/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 19,191 | CERs | Compensation of carbon footprint for year 2020 of Acciona Agua | 15/04/2021 | Attestation letter |
| 9306 | Choloma Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 7,523 | CERs | 2017 ECOCERT Group carbon compensation/ECOCERT SA | 18/12/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 49,245 | CERs | "2018-0393 | 2020" | 26/10/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50 | tCERs | COMPENSAÇÃO DE EMISSÕES DO "CSN 3ª HRC EQUESTRIAN FESTIVAL 2022 + SELETIVAS DA JUVENTUDE CBH". DATA DO EVENTO: 06 A 10 DE ABRIL DE 2022. REALIZAÇÃO: HRC - HELVETIA RIDING CENTER | 13/04/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 862 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by CEMEX COLOMBIA SA, NIT 860002523-1,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 11,674 | CERs | On Behalf of WeNow's customers | 04/12/2018 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 11,407 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 150 | CERs | Offset on behalf of THREAD and TONIC | 29/06/2021 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 25 | CERs | Voluntary carbon footprint offset of GHG emissions related to product deliveries made by CASA ISABEL during the months of September and October 2020. | 16/12/2020 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 7 | CERs | Voluntary Cancellation of 7 CERs for transaction no. 329 on www.clpcarboncredits.com | 06/03/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 33 | 22/12/2020 | Attestation letter |
| 2692 | Bethlehem Hydroelectric project | Energy industries (renewable - / non-renewable sources) | South Africa | 158,119 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019. The offsets are to be listed into the COAS Registry account number 101024 of Bethlehem Hydro Proprietary Limited. | 07/02/2022 | Attestation letter |
| 0073 | "Las Vacas" Hydroelectric project | Energy industries (renewable - / non-renewable sources) | Guatemala | 5,429 | CERs | ENEGAN S.P.A. – Compensazione quote emissioni GAS 1°semestre anno 2022 per conto di ENEGAN S.P.A. | 28/09/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 40 | 22/12/2020 | Attestation letter |
| 9062 | Liaoning Guoli Fuxin Wangsiyingzi Wind Power Project | Energy industries (renewable - / non-renewable sources) | China | 21,283 | CERs | Voluntary cancellation of 21,283tCO2e on behalf of Budapest Airport Zrt. to offset residual emissions of year 2019 and renew Level 3+ carbon neutrality in the Airport Carbon Accreditation scheme | 23/07/2021 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 171,019 | CERs | Retired on behalf of Natural Capital Partners' Clients | 30/03/2022 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 19,500 | CERs | ABB FIA Formula E | Certified carbon neutrality| Seasons 1 - 6 | Offer No. 2020 – 0982 | 07/09/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 365 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSTECOL S.A.S (NIT 804.004.470-3, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 10360 | 5 MW Solar Power Project by Baba Group (EKIESL-CDM-May-16-03) | Energy industries (renewable - / non-renewable sources) | India | 3,400 | CERs | Beneficial owner: LEGAMI SRL Retirement reason details: Carbon neutrality esercizio aziendale annuale | 03/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,497 | CERs | 2018-0957 | 2020 | 11/11/2020 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 15,450 | CERs | "On behalf of Carbonfund.org Foundation partner" | 14/02/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 350 | CERs | Voluntary Cancellation of 350 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during the first quarter (January - March) of 2020. | 18/11/2020 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 1,720 | CERs | Aposentadoria permanente de circulação do mercado em nome do Banco PAN referente as emissões corporativas de Escopo 3 do ano de 2021. / Retirement on behalf of Banco PAN referring to corporate emissions of Scope 3 of the year 2021. | 24/05/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | Espectáculo Luz Toledo 2019 | 16/10/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,196 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ALPINA PRODUCTOS ALIMENTICIOS S.A (NIT 860.025.900-2), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 16 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 61 439,0 kms of riders using UberCOMFORT during December 2020 made by A-CO2 | 22/01/2021 | Attestation letter |
| 1658 | Yinshan Profiled Iron Co., Ltd. 25 MW Waste Gas Power Generation Project of Laiwu Iron & Steel Group Corp. | Energy industries (renewable - / non-renewable sources) | China | 163,000 | CERs | CO2-Kompensationen von Produkten oder diversen Klimaschutzmaßnahmen der Kasseler Verkehrs- und Versorgungs- GmbH (KVV) sowie allen Beteiligungsgesellschaften und Allianzen der KVV. | 19/05/2022 | Attestation letter |
| 4274 | SF6 recovery and reclamation project, South Korea | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | Republic of Korea | 120,780 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Fluorine Korea Co., Ltd.. The beneficiary of all cancelled CERs is Fluorine Korea Co., Ltd.. | 01/12/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 1,000 | CERs | These carbon credits have been retired on behalf of CarbonClick users for the purposes of carbon offsetting | 29/04/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 753 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 753 tons of CO2 associated with fossil fuels to be used by CONSTRUCCIONES EL CONDOR S.A. (NIT 890.922.447-4) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 59,479 | CERs | Retired on behalf of ClimateCare/Natural Capital Partners for Customer ID 110793CCL | 30/03/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 115 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 115 ton of greenhouse gas (GHG) emissions of the CBO Flamengo vessel fuel consumption.” Reference month: January 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 115 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Flamengo.” Mês de referência: Janeiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 10/03/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 452 | CERs | Voluntary cancellation to offset the GHG generated from operations of TS Capital Partners Management Limited from November 2020 to October 2021. | 24/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 497 | CERs | MV3273 | 2020 | 16/12/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 400,000 | CERs | "Entwertung der CO2-Zertfikate für das Grüngasprodukt von Eprimo.“ | 21/02/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,095 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by VALORES Y CONTRATOS SA (NIT 800.182.330-8), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 15 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de KETSIN COSTA RICA para compensar las emisiones GEI generadas por las operaciones de la compañía durante el año 2020. | 24/09/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 218 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - Mopar Hortolândia. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 121 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - FCA Saúde. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 2,468 | CERs | Compensação da pegada de carbono do Grupo VAMOS 2021 – Escopo 1 e 2 / Compensation of the carbon footprint of Grupo VAMOS 2021 – SCOPE 1 and 2. | 27/09/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3 | CERs | XVIII Conferencia Anual de Inversores Bestinver 2019 Madrid | 16/10/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 645 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 645 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 645 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 11/01/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “MTR - Engineering Division” for Annual Dinner in 2021 (Transaction ID: 701) | 18/02/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,184 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia S.A. (NIT 891300238-6), in order to not cause the national carbon tax. | 13/03/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 53 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by MASMETRO (NIT 900.506.474-4, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 52 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TÉCNICA VIAL S.A.S (NIT 860.015.067-9), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 100,000 | CERs | Retired on behalf of ClimatePartner | 12/03/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 1,500 | CERs | Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00076444) | 08/03/2021 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 2 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de SkyView Costa Rica para compensar las emisiones GEI generadas por 9.13 horas de vuelo en CESSNA C206 y Robinson R44 y PIPER PA34, durante evento el 18 y 19 de junio de 2022. | 17/08/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 648,0 kms of riders using UberCOMFORT during May 2020 made by A-CO2 | 05/06/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 130 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 516 904,0 kms of riders using UberECO during May 2020 made by A-CO2 | 05/06/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 90 | CERs | Retirement – Beneficiary: Asociación Coalición Costarricense de Iniciativas de Desarrollo (CINDE); Retirement Reason Details: Cancelación voluntaria hecha por Asociación Coalición Costarricense de Iniciativas de Desarrollo (CINDE) para su estrategia de reducción de emisiones para el Programa de Carbono Neutralidad de Costa Rica de sus emisiones del 01 de enero al 31 de diciembre del 2019 | 28/05/2020 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 201 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of Panasonic do Brasil Limitada., to offset CO2 emissions related to the reported GHG Emissions from April 2020 to March 2021. | 01/12/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 26 | CERs | Voluntary cancellation in favor of PUMA ENERGY COLOMBIA COMBUSTIBLES SAS; NIT 900497906-5 for neutralization of the GHG emissions, to be used by EASYFLY S.A., NIT 900088915-7,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 93 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ABUCHAIBE RAMIREZ (NIT 900.971.341, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 9610 | 5MW Solar PV Power Plant by AEPL | Energy industries (renewable - / non-renewable sources) | India | 7,816 | CERs | Voluntary cancellation of 7816 GS CERs for the purpose of conversion to Gold Standard VERs from project GS4824. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 16/03/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 1,868 | CERs | FIRRIATO SRL | 27/05/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 673 | CERs | For Cool Effect on Behalf of The Martin Agency | 09/06/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,000 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860002554-8 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 20/04/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 150 | CERs | William Shepard - For offsetting 150 metric tonnes of CO2e on March 22, 2021 to mitigate the estimated emissions associated with your annual light jet travel. | 27/05/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8,000 | CERs | Offset on behalf of: Sociedad Estatal de Correos y Telégrafos, S.A. S.M.E. Reason for cancellation: I am offsetting the carbon footprint of my organization | 29/11/2021 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 22 | CERs | Voluntary cancellation on behalf of GLOBAL FRAGRANCES LABS, S.L. to offset its carbon footprint | 23/09/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,058 | CERs | Voluntary compensation from Uber Mexico to offset GHG emissions made by Anaconda Carbon | 03/02/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 73 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INGENIO MARIA LUISA (NIT 800.210.144-5, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 4174 | India: Himachal Pradesh Reforestation Project – Improving Livelihoods and Watersheds | Afforestation and reforestation | India | 9,653 | tCERs | Per Syngenta's cancellation request dd.August 12, 2019 | 14/04/2020 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 2,158 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 912 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by FRIMAC S.A (NIT 800197456-2), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 0922 | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of Korea | Chemical industries | Republic of Korea | 281,620 | CERs | CERs to be cancelled in exchange for Korean Offset Credits(KOC),issued by Korean Offset Program to Hanwha Corp. The beneficiary of CERs cancelled is Hanwha Corp. | 02/04/2019 | Attestation letter |
| 7260 | DEWA Chiller Station L | Energy industries (renewable - / non-renewable sources) | United Arab Emirates | 2 | CERs | Reference to the annual celebrations of Earth Hour, DEWA aims to achieve a carbon neutral event also for the year 2019. The carbon neutrality of Earth Hour 2019 will be provided by means of carbon credits from the DEWA Chiller Station L - CDM Project. | 10/09/2019 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 5,153 | CERs | Retirement on behalf of Pafos International Airport 2019 and 2020 emissions | 14/03/2022 | Attestation letter |
| 6008 | Recovery and Utilization of Associated Gas at Pondok Tengah LPG Plant – PT. Yudistira Energy | Fugitive emissions from fuels (solid, oil and gas) | Indonesia | 4,187 | CERs | Cancelled for the purpose of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 27/11/2020 | Attestation letter |
| 10006 | Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System | Energy industries (renewable - / non-renewable sources) | Saudi Arabia | 49,120 | CERs | Carbon Neutrality for Saudi Basic Industries Corporation (SABIC) HQ in accordance with BSI PAS2060:2014 specifications and period from 01.01.2019 to 31.12.2020. | 15/06/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 323 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by BIMBO DE COLOMBIA S.A (NIT 830002366-0), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 22 767,0 kms of riders using UberCOMFORT during September 2020 made by A-CO2 | 14/10/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 43 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by CRUSSAR SAS NIT 901122635-9, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 30 | CERs | To Neutralize the Carbon Emission generated by Shanghai Chunlu Paper Products Co.,LTD in 2021. | 18/08/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 900 | CERs | Cancelacion voluntaria llevada a cabo por Anaconda Carbon a favor de Grupo Danissa (Agencia Datsun, S.A; Corporación Motortec, S.A; Línea de Acción, S.A; Corporación D, S.A; Danissa, S.A) para compensar emisiones GEI del periodo 2020 y cumplir con el PPCN | 05/10/2021 | Attestation letter |
| 10535 | Cam Lam VN Solar Power Plant | Energy industries (renewable - / non-renewable sources) | Viet Nam | 23,504 | CERs | Cancelled CERs will turn into be KOCs(Korea Offset Credits) which can be used in domestic emission trading scheme of Republic of Korea. | 05/10/2021 | Attestation letter |
| 10535 | Cam Lam VN Solar Power Plant | Energy industries (renewable - / non-renewable sources) | Viet Nam | 19,554 | CERs | Cancelled CERs will turn into be KOCs(Korea Offset Credits) which can be used in domestic emission trading scheme of Republic of Korea. | 05/10/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 15/08/2022 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 8,746 | CERs | “Retired for 2020 (3.436 tCO2) and 2021 (5.310 tCO2) Scope 1 GHG Emissions Offset on behalf of Fraport TAV Antalya Terminal Management Inc.” | 07/04/2022 | Attestation letter |
| 4165 | Huaneng Guangdong Nan'ao East Island Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 21,573 | CERs | Retired on behalf of Sharjah Airport to neutralise it’s Scope 1 & 2 and scope 3 emissions from business travel for the ACA Level 3+ application. | 28/07/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 336 | CERs | Compensation of carbon footprint for year 2018 of GRUPO BODEGAS PALACIO 1894 | 11/06/2019 | Attestation letter |
| 7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 1,998 | CERs | Voluntary cancellation by Asia Symbol (GuangDong) Paper Co., Ltd to offset GHG Emissions generated from partial offset paper products (Brand ZHU MENG SONG GE) | 21/03/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 68 | CERs | This voluntary cancellation of CERs was made on behalf of Marelli Industria e Comercio de Componentes Automotivos - MMH / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 40 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Antojese Travel for all air tickets, hotels and car rentals bookings issued for the period from January 1st to June 30th 2020. | 07/07/2020 | Attestation letter |
| 10122 | 6 MW Solar Power Project by Arhyama Solar Power | Energy industries (renewable - / non-renewable sources) | India | 3,514 | CERs | Voluntary cancellation of 3,514 CERs for the purpose of conversion to Gold Standard VERs from project GS4530. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 11/01/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 548 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 548 tons of greenhouse gas (GHG) emissions of the CBO WISER vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 548 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO WISER.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 8012 | Grid connected electricity generation from renewable source: Windfarm Complex Santa Vitória do Palmar and Chuí | Energy industries (renewable - / non-renewable sources) | Brazil | 1,100 | CERs | Compensação das emissões de GEE (gases de efeito estufa) provenientes das operações de transporte (B2B e B2C) no ano de 2021 e janeiro a agosto de 2022 da Jec Express. Offseting of GHG emissions (greenhouse gases) generated by the transport operations (B2B and B2C) of Jec Express in the year 2021 and January to August 2022 | 21/10/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 35,000 | CERs | Voluntary cancellation in favor of ZEUSS PETROLEUM S.A.S (NIT 811.043.174-1) for the neutralization of 35,000 tons of CO2 associated with fossil fuels to be used by ZEUSS PETROLEUM S.A.S (NIT 811.043.174-1) in order not to cause the national carbon tax. | 21/01/2021 | Attestation letter |
| 1052 | Chacabuquito Hydroelectric Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 8,961 | CERs | BP Technology Ventures Limited requested IBRD as Trustee of the Carbon Funds to cancel all emission reductions resulting from its participation in Chile Chacabuquito Project (CDM Ref# 1052) per instructions in Cancellation Letter dated 14/01/2021. | 03/02/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,150 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INVERSIONES Y SERVICIOS BARRANQUILLA S.A (NIT 802.010.572-3), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 415 | CERs | Retirement - Beneficiary: Asociacian de Servicios Medicos Costarricenses (ASEMECO); Retirement Reason Details: Cancelacian Voluntaria rea lizada par la Asociaci an de Servicios Medicos Costarricenses (ASEM ECO) para compensar sus emisiones de C02 equiva lente correspondientes al ano 2019, como requerimiento para cumplir con su Programa de Carbona Neutralidad. | 03/11/2020 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1 | CERs | Compensación carbono| Nueva York 4-9 diciembre |Huakai Travel S.L. | 17/12/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 347 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 348 999,00 kms of riders using UberPLANET and 3 497 890,00 kms of riders using UberX during April 2021 made by A-CO2 | 20/05/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 6,500 | CERs | OFFSET ON BEHALF OF: Aquaservice REASON FOR COMPENSATION: Compensación huella de carbono Aquaservice 2022 | 06/05/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 51 | CERs | Voluntary cancellation in favor of PETROBRAS COLOMBIA COMBUSTIBLES SA; NIT 900047822-5 for neutralization of the GHG emissions, to be used by COLVANES SAS NIT 800185306-4, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 605 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: WORLD FUEL SERVICES COLOMBIA | 12/10/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 38,656 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 12/10/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,285 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 12/10/2022 | Attestation letter |
| 0315 | 125 MW Wind Power Project in Karnataka, India | Energy industries (renewable - / non-renewable sources) | India | 274,129 | CERs | Retired on behalf of ClimatePartner‘s customers. | 08/02/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “AECOM” for Annual Dinner in 2021 (Transaction ID: 689) | 17/02/2021 | Attestation letter |
| 1259 | Enercon Wind Farm (Hindustan) Ltd in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 884 | CERs | Retired on behalf of Luftfartsverket to offset emissions generated by our operations during 2017. | 19/12/2018 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 19/07/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,535 | CERs | Offset on behalf of: CABIFY MATRIZ S.L.U. Reason for Compensation: CABIFY Huella de Carbono 2021 | 11/01/2022 | Attestation letter |
| 3611 | Roaring 40’s Wind Farms (Khandke) Private Limited – Phase III | Energy industries (renewable - / non-renewable sources) | India | 6,715 | CERs | Voluntary Cancellation of 6,715 CERs for Pacific Basin Shipping Limited | 23/11/2020 | Attestation letter |
| 1578 | Uganda Nile Basin Reforestation Project No.3 | Afforestation and reforestation | Uganda | 755 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 16/11/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 119 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 119 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 119 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 27/05/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación carbono | Amsterdam4-8 diciembre | Huakai Travel S.L. | 17/12/2021 | Attestation letter |
| 5584 | Cerro de Hula Wind Project | Energy industries (renewable - / non-renewable sources) | Honduras | 27,922 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Compensacion voluntaria llevada a cabo por Anaconda Carbon a favor de Banco Davivienda Costa Rica, para compensar los GEI generados por su Programa Marchamo Verde 2020 por un total de 150.000.000 kms | 19/02/2020 | Attestation letter |
| 10125 | 5 MW Solar PV Power Plant CDM Project by OPG Energy Private Ltd., - Baap, Jodhpur, Rajasthan, India | Energy industries (renewable - / non-renewable sources) | India | 39,997 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 5584 | Cerro de Hula Wind Project | Energy industries (renewable - / non-renewable sources) | Honduras | 73 | CERs | Cancelación Voluntaria realizada por Fábrica de Harinas de Centroamérica, S.A., Costa Rica | 13/10/2022 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 101,650 | CERs | ZEUSS PETROLEUM S.A.S NIT: 811043174-1 | 18/09/2019 | Attestation letter |
| 7178 | Combined Cycle at Loma de la Lata Thermo Unit Project | Energy industries (renewable - / non-renewable sources) | Argentina | 299,051 | CERs | For DL 2021 Carbon Neutrality | 21/12/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 20 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de KETSIN COSTA RICA para compensar las emisiones GEI generadas por las operaciones de la compañía durante el año 2019 | 06/11/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,612 | CERs | UPMSIC2016 - April Platform Sales | 09/06/2021 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 5,604 | CERs | retired on behalf of Nordic Leisure Travel Group AB for Scope emissions of 2022/2023 | 26/09/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 4 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de AGENCIA DATSUN SABANA para la acreditación de Bandera Azul del Punto de Venta Ag. Datsun Sabana para periodo 2020 | 15/04/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 54 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 54 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 54 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 09/09/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | Voluntary Cancellation of 5 CERs for transaction no. 927 (KAL) | 25/10/2021 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 8,468 | CERs | These CERs are being voluntarily cancelled for Ökogas für SWK Stadtwerke Krefeld AG im Auftrag der Quantum GmbH. The CERs are cancelled from Monitoring period 3d, vintage 2018. | 11/06/2021 | Attestation letter |
| 10006 | Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System | Energy industries (renewable - / non-renewable sources) | Saudi Arabia | 43,786 | CERs | Carbon Neutrality for Saudi Basic Industries Corporation (SABIC) HQ in accordance with BSI PAS2060:2014 specifications and period from 01.01.2018 to 31.12.2018. | 29/07/2019 | Attestation letter |
| 3044 | Jianli Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 50,000 | CERs | on behalf of FZ - RTWTUV1256116353.09 | 28/12/2021 | Attestation letter |
| 0115 | GHG emission reduction by thermal oxidation of HFC 23 at refrigerant (HCFC-22) manufacturing facility of SRF Ltd | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | India | 273,500 | CERs | To offset the anticipated emissions of Pearl Petroleum Company Limited in Kurdistan Region of Iraq during the year 2023. | 26/04/2022 | Attestation letter |
| 3779 | Accion Fraterna Biogas CDM project for rural communities in Anantapur, Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 13,382 | CERs | 3,178 women from 156 villages in Andhra Pradesh have reduced 13,655 tonnes of GHG emissions by using Biogas units instead of firewood. These Biogas units were built with generous contributions from IndiGo passengers who compensated a part of their travel emissions. | 17/09/2021 | Attestation letter |
| 0752 | Omnia Fertilizer Limited Nitrous Oxide (N2O) Reduction Project | Chemical industries | South Africa | 144,147 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 23/11/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 23 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona -Concesiones | 12/05/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 459 | CERs | Compensation of carbon footprint for year 2020 of Acciona Inmobiliaria | 15/04/2021 | Attestation letter |
| 0073 | "Las Vacas" Hydroelectric project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1,345 | CERs | ALPHASTAR S.R.L. – Compensazione quote emissioni GAS anno 2022 per conto di Alphastar S.R.L. | 28/09/2022 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 399,174 | CERs | Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 05/08/2021 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 7,038 | CERs | Cancelled to neutralize the greenhouse gas emissions of Scope I generated by Guangxi CNGA New Energy Technology Co., Ltd. in the first half of 2022. | 27/09/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Evento VULCO 2021 (digital) | 30/07/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 310 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Avenida Escazu para compensar las emisiones GEI generadas por la huella operacional del condominio durante el año 2019, para cumplir con los requisitos del PPCN | 30/12/2020 | Attestation letter |
| 8438 | Clean Cook Stoves in Sub-Saharan Africa by ClimateCare Limited | Energy demand | Ghana, Kenya | 500 | CERs | CERs cancellation in exchange for VCS Offset Credits (VCU) to be issued by Verified Carbon Standard Offset Program to 3degress Group Inc. These have not been used for any offsetting purposes or mandatory or voluntary compliance purpose. | 01/10/2020 | Attestation letter |
| 1027 | Transalloys Manganese Alloy Smelter Energy Efficiency Project |
Metal production
; Energy industries (renewable - / non-renewable sources) |
South Africa | 598,593 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named EcoMetrix Africa, with the carbon offset administration system account number 100014, into which the offsets must be listed. | 02/03/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 475 | CERs | Voluntary Cancellation of 475 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during fourth quarter (October-December) of 2018 | 30/12/2021 | Attestation letter |
| 0171 | Caieiras landfill gas emission reduction | Waste handling and disposal | Brazil | 3,736 | CERs | Voluntary Cancellation of 3736 CERs to neutralize the carbon footprint of all the operations of Innova Ambiental S.A., RUC 20302891452, during 2018 in the solid waste management in the city of Lima (Cercado de Lima and Municipalidad de Miraflores) | 26/06/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,520 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INGENIO PROVIDENCIA (NIT 891.300.238-6, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 72 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00076261 | 30/09/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 13,720 | CERs | Voluntary compensation of the emissions generated by PETSTAR during the year 2019 | 04/09/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for PPAP Automotive Limited . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 5251 | Korea Land & Housing Corporation (LH Corporation)’s National Rental House PV power plant bundling CDM project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 4,193 | CERs | The cancelled CERs will be in exchange for Korean Offset Credit in Korea Emissions Trading Scheme. The beneficiary of this is LH Corporation(Same as Korea Land & Housing Corporation). | 11/05/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,552 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions made by Anaconda Carbon. | 22/09/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3,897 | CERs | Compensation of carbon footprint for year 2019 of Acciona Industrial | 18/05/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 13 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary cancellation made by Anaconda Carbon on behalf of Wondermore.org to offset all GHG emissions from the air travel for Guatemala Elemental / Feb2020 and Mexico Ancestral / Nov2019 groups | 19/02/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 5,000 | CERs | Retired for Cool Effect on Behalf of Climate Neutral | 09/06/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 21 | CERs | OFFSET ON BEHALF OF: Sea 2 see REASON FOR COMPENSATION: Offseting double the tonnes of carbon emitted during 2021 | 08/03/2022 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 85,661 | CERs | BIOMAX COMBUSTIBLES S.A. NIT:830136799-1 | 19/09/2019 | Attestation letter |
| 10066 | 20 MW BEL Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 128,657 | CERs | “Voluntarily offsetting CO2 emissions from fuel gallons delivered.” | 22/04/2022 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 3,247 | CERs | Beneficiary: ECOCERT, S.A: Purpose: Compensation of Carbon Footprint | 24/11/2020 | Attestation letter |
| 4939 | Uganda Nile Basin Reforestation Project No 1 | Afforestation and reforestation | Uganda | 73 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 16/11/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,686 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de Planta Tostadora Café 1820 para compensar las emisiones GEI generadas por la empresa durante el año 2018 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático. | 31/01/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 527 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 16/03/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 25,660 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - FCA Goiana / Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 83 | CERs | Purpose: Compensação de emissão da TOP SPORT CONFECCOES LTDA, localizada em R MIGUEL MENTEM, 148 São Paulo /SP. Beneficiary: TOP SPORT CONFECCOES LTDA | 19/03/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 34 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 446 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 446 ton of greenhouse gas (GHG) emissions of the CBO Flamengo vessel fuel consumption.” Reference month: February 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 446 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Flamengo.” Mês de referência: Fevereiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/03/2022 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 12,634 | CERs | Gasversorgung Görlitz GmbH – CO2 neutrales Erdgas | 05/11/2021 | Attestation letter |
| 0935 | Methane recovery from waste water generated from wheat straw wash at Paper manufacturing unit of Shreyans Industries Limited (SIL) |
Waste handling and disposal
; Agriculture |
India | 11,285 | CERs | Energie Direct MineralolhandelsgesmbH | 12/06/2019 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 116,177 | CERs | This request is submitted to cancel the 116,177 CERs issued from Sihwa Tidal Power Plant CDM Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 26/07/2021 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 13,375 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Termoencogibles S.A. de C.V. para compensar la generación de GEI derivadas de su operación para el año 2020 | 06/04/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,850 | CERs | Retiro a favor de PRIMAX COLOMBIA identificado con NIT 860002554-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 1.850 Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Dr Anthony Ma” for Annual Dinner in 2021 (Transaction ID: 716) | 18/02/2021 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 39,199 | CERs | "In mitigation of Airport International Group residual Scope 1, 2 and business travel carbon dioxide emissions in 2020 and 2021" | 24/02/2022 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 1,052 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by A-CO2 | 21/04/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 135 | CERs | Offset on behalf of Sustainable Planet Holdings Ldt Reason for Compensation: I am offsetting the Carbon Footprint of my Clients | 11/01/2022 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 56,584 | CERs | Voluntary cancellation of 56,584 CERs for the purpose of conversion to Gold Standard VERs from project GS5519. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose | 15/09/2022 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 238,000 | CERs | “For DL 2021 Carbon Neutrality” | 06/01/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 597 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COOPERATIVA AMERICANA DE TRANSPORTADORES (NIT 891.200.427-2), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 1247 | URBAM/ARAUNA - Landfill Gas Project (UALGP) | Waste handling and disposal | Brazil | 6,646 | CERs | Cancelamento para compensação das emissões de Gases do Efeito Estufa referente ao Inventário Ano-Base de 2021 da obra Altto Vila Madalena para os escopos 1, 2 e 3 no ano de 2021. / Voluntay cancellation to offset corporate emissions on behalf of Altto Vila Madalena Building by 2021 GHG Inventory for scopes 1, 2 and 3 in 2021. | 11/11/2021 | Attestation letter |
| 0329 | Babanpur, Killa and Sahoke Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 26,427 | CERs | Cancelled on behalf on Engie SA to offer a reduced carbon product to its B2B customers in France | 08/11/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Mitigación de la Huella de Carbono de Martín Valencia Juárez | 05/05/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 683 | CERs | Beneficiary: CAFÉ BRITT COSTA RICA S.A. Voluntary cancellation on behalf of CAFÉ BRITT COSTA RICA S.A. for its Greenhouse Gas Neutrality (GHG) Strategy for their emissions emitted from January 1st to December 31, 2017 | 17/01/2019 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 50,833 | CERs | Retired 50,833 credits on behalf of Cemasys’ client, Contract number: CE-202112577. | 07/01/2022 | Attestation letter |
| 3222 | BRASCARBON Methane Recovery Project BCA-BRA-08, Brazil. | Waste handling and disposal | Brazil | 160 | CERs | Offset of Faro Energy carbon and energy footprints 2018 and 2019 | 26/05/2020 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 880 | CERs | Compensação das emissões de GEE da produção cinematográfica da 2ª temporada da minissérie Aruanas. Compensation of GHG emissions from the cinematographic production of the 2nd season of the miniserie Aruanas. | 20/12/2021 | Attestation letter |
| 6008 | Recovery and Utilization of Associated Gas at Pondok Tengah LPG Plant – PT. Yudistira Energy | Fugitive emissions from fuels (solid, oil and gas) | Indonesia | 15,810 | CERs | Cancelled for the purpose of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 27/11/2020 | Attestation letter |
| 2535 | CUIDEMOS Mexico (Campana De Uso Intelegente De Energia Mexico) - Smart Use of Energy Mexico | Energy demand | Mexico | 219,509 | CERs | Retired on behalf of The Hut Group to offset the carbon footprint of The Hut Groups’ clients, partners and suppliers. | 28/09/2021 | Attestation letter |
| 1291 | Enercon Wind Farms in Karnataka Bundled Project – 30.40 MW | Energy industries (renewable - / non-renewable sources) | India | 74,168 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 10404 | Solar Power Project by Fortum FinnSurya Energy Pvt Ltd | Energy industries (renewable - / non-renewable sources) | India | 75,000 | CERs | Voluntary cancellation of 75000 GS CERs for the purpose of conversion to Gold Standard VERs from project GS5523. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 04/06/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 10,000 | CERs | "Retired on behalf of Climaider" | 23/11/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,255 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SISTEMA INTEGRADO DE TRANSPORTE SI99 S.A (NIT 830.060.151-1), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,499 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 7 180 810,0 kms of riders using UberX during August 2020 made by A-CO2 | 09/09/2020 | Attestation letter |
| 0122 | Agua Fresca Multipurpose and environmental services project | Energy industries (renewable - / non-renewable sources) | Colombia | 43,548 | CERs | Voluntary cancellation in favor of ZEUSS PETROLEUM (NIT 811.043.174-1) for neutralization of the GHG emissions, in order to not cause the national carbon tax. | 11/02/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 137 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES LA PETROLERA VLIMAR (NIT 800.222.189-8, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 0085 | Hapugastenne and Hulu Ganga Small Hydropower Projects. | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 27,189 | CERs | Voluntary cancellation on behalf of Natural Capital Partners' client. | 09/05/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 20 | CERs | Espectáculo multimedia de Navidad A Coruña 2019 | 05/02/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Amura Centro Culinario para compensar la huella de carbono generada por la operación de sus plataformas web durante el periodo 2021 | 03/12/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 1,300 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Coltanques (NIT 860040576-1), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 99,679 | CERs | Operational emissions and customer emissions neutralization by Industrial Bank Co.,Ltd. | 10/12/2021 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 50,000 | CERs | Retired on behalf of Natural Capital Partners' Clients (Ref CNC) | 30/05/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 30 | CERs | REESO | 05/04/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 8 | tCERs | FORUM DE INVESTIMENTO E NEGOCIOS DE IMPACTO - FINI, EDICAO BELO HORIZONTE 2019 | 10/12/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 542 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 03/08/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 80 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by IMBOCAR SA, NIT 800185397-1,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 4,500 | CERs | Cancelled for the purposes of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 07/12/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 174 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 683 864,00 kms of riders using UberPLANET during November 2021 made by Anaconda Carbon. | 16/12/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 55,207 | CERs | - | 27/05/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1 | CERs | UPMSIC2018 - April Platform Sales | 09/06/2021 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 29,703 | CERs | Cancelación Voluntaria a favor de REFINERÍA DE CARTAGENA S.A.S. (NIT 900112515-7), filial de EMPRESA COLOMBIANA DE PETRÓLEOS SA - ECOPETROL SA (NIT 899999068-1) para la neutralización de emisiones de gases efecto invernadero por consumo de combustibles fósiles | 18/01/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 45 | CERs | Compra voluntaria realizada por Anaconda Carbon a favor de Horizontes Nature Tours y Fundación Horizontes para compensar las emisiones GEI de su huella organizacional durante el periodo 2020 | 05/11/2021 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 10 | CERs | Voluntary Cancellation of 10 CERs for Hung Tze Kit for transaction no. 796 on www.clpcarboncredits.com | 25/05/2021 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 460 | CERs | To Neutralize the Carbon Emission generated by Luoyang Xinding Furniture Co., Ltd in 2021 | 22/03/2022 | Attestation letter |
| 5106 | Heqing Solar Cooker Project II | Energy industries (renewable - / non-renewable sources) | China | 19,154 | CERs | Cancelled for FZ | 13/11/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,243 | CERs | Retiro a favor de PRIMAX COLOMBIA identificado con NIT 860002554-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 11/08/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Vineet Agarwal MD, Transport Corporation of India Ltd. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Sanjay Kirloskar Chairman & Managing Director – Kirloskar Brothers Ltd. & Senior Vice President AIMA.., EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org. | 16/01/2019 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 17/01/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Manoj Pande,Co-Convener, CII WUP Core Group on Sustainability & Managing Director Statcon Energiaa Pvt Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 12,487 | CERs | Retired on behalf of Livonia Print for Offsetting Scope 1, 2 and 3 emissions for climate neutrality. | 21/07/2022 | Attestation letter |
| 5884 | Use of waste gas at Namakwa Sands in South Africa |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
South Africa | 1 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 16/11/2020 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 500 | CERs | Für den klimaneutralen Geschäftsbetrieb der MATSEN CHEMIE AG im Jahr 2019 ist der Ausgleich von 855,16 Tonnen CO2-Äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung von 500 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 500 Gold Standard CERs des Projekts "Solar Water Heater Program in India" aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 20/10/2020 | Attestation letter |
| 10537 | Solar PV based power generation by Voltas Green in Mauritius | Energy industries (renewable - / non-renewable sources) | Mauritius | 7,500 | CERs | Veranda Leisure and Hospitality - Heritage Resorts 2021/22 whole guests carbon footprint offsetting (Scopes 1-2-3) | 28/09/2021 | Attestation letter |
| 9306 | Choloma Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 50 | CERs | 2018 ECOCERT Group carbon compensation/ECOCERT Group | 24/09/2019 | Attestation letter |
| 0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | Waste handling and disposal | Brazil | 2,565 | CERs | For DL 2021 Carbon Neutrality | 06/01/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 76 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 76 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 76 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 20/09/2021 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 79,453 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 17/12/2018 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 72 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 72 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 72 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 21/02/2019 | Attestation letter |
| 0822 | Loma Los Colorados Landfill Gas Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Chile | 268 | CERs | Cancelación de 268t CO2 correspondientes a las emisiones de la Estación de compresión Euskadour de Enagás S.A. durante el 2020 | 16/03/2021 | Attestation letter |
| 1687 | 24.8 MW Wind power project by Belgaum Wind Farms Private Ltd. in Gadag, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 91,787 | CERs | To offset CO2 emissions from fuel gallons delivered. | 10/08/2022 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 2,217 | CERs | Voluntary cancellation of 2217 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-24 | 25/02/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 12,496 | CERs | 2019-0740 | 2020 | 09/11/2020 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 40 | CERs | CITEOS | 11/03/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 2,762 | CERs | Purpose: Neutralizacao de emissoes - Lote 88: Neutralize Carbono (CNPJ.: 11.639.463/0001-14) Beneficiary: Lote 88 - Neutralize Carbono | 31/08/2022 | Attestation letter |
| 8500 | SHP ITAGUACU CDM PROJECT (JUN 1146), BRAZIL | Energy industries (renewable - / non-renewable sources) | Brazil | 21,815 | CERs | Purpose: Lote 87 - Neutralize Carbono, CNPJ: 11.639.463/0001-14 - offsetting greenhouse gases emissions of the production of Asiatan Kind Leather Beneficiary: ASIATAN INTERNATIONAL LIMITED | 30/05/2022 | Attestation letter |
| 7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | Energy industries (renewable - / non-renewable sources) | Madagascar, Ethiopia, Kenya, Malawi, Mozambique, Nigeria, Uganda, Zambia, Chad, Dominican Republic, Côte d`Ivoire, Liberia, Rwanda, Sierra Leone, Namibia, Zimbabwe, Ghana, South Africa, Somalia | 11,526 | CERs | This cancellation is for usage in the Korea offset programme (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 06/04/2020 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 4,029 | CERs | on behalf of GP-17 | 09/08/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 709 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Grupo Danissa para compensar 708.8 toneladas de CO2, correspondiente a las emisiones de GEI generadas durante el 2019 para cumplir con los requisitos del PPCN | 28/01/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir YEE Kwong Fai” for Annual Dinner in 2021 (Transaction ID: 713) | 18/02/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 125,000 | CERs | On behalf of Lenovo CO2 Compensated Program | 18/11/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 526 | CERs | Voluntary cancellation on behalf of SERVICIOS DE VIAJEROS SUIZA S.A. for its Greenhouse Gas (GHG)management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2020. | 28/03/2022 | Attestation letter |
| 5814 | 8.4 MW Wind Power Project in Rajasthan, India | Energy industries (renewable - / non-renewable sources) | India | 57,000 | CERs | "DL Carbon Neutrality 2021" | 12/04/2022 | Attestation letter |
| 4665 | N2O Abatement Project of Capro Corporation | Chemical industries | Republic of Korea | 136,740 | CERs | Cancelled CERs will turn into be KOCs(Korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea. | 29/12/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 15 | CERs | This voluntary cancellation of CERs was made on behalf of Denso Sistemas Térmicos do Brasil / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 0258 | Nueva Aldea Biomass Power Plant Phase 1 | Energy industries (renewable - / non-renewable sources) | Chile | 5,000 | CERs | Neutralization of 2019 Carbon footprint/Colgate University, Hamilton, NY, USA | 22/12/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 4 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de AGENCIA DATSUN SABANA para la acreditación de Bandera Azul del Punto de Venta Ag. Datsun San Carlos para periodo 2020 | 14/04/2021 | Attestation letter |
| 1366 | Biomass generation project, in Sheyang county, Jiangsu province, P.R. China | Energy industries (renewable - / non-renewable sources) | China | 150,000 | CERs | Voluntary Cancellation on behalf of IGS Energy Carbon-Neutral Natural Gas customers for 2024 | 14/01/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4,599 | CERs | Compensation of carbon footprint for year 2018 of Acciona Industrial | 11/06/2019 | Attestation letter |
| 3839 | MRMPL Wind Power Project | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | PROGAS GmbH & Co KG – KLIMA neutral | 27/06/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 500 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 14/06/2022 | Attestation letter |
| 2954 | Guangdong Taishan Shangchuandao Island Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 79,187 | CERs | Operational emissions and customer emissions neutralization by Industrial Bank Co.,Ltd. | 10/12/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 274 | CERs | Compensation of carbon footprint for year 2019 of Grupo Bodegas Palacio | 18/05/2020 | Attestation letter |
| 6008 | Recovery and Utilization of Associated Gas at Pondok Tengah LPG Plant – PT. Yudistira Energy | Fugitive emissions from fuels (solid, oil and gas) | Indonesia | 20,372 | CERs | Cancelled for the purpose of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 27/11/2020 | Attestation letter |
| 10404 | Solar Power Project by Fortum FinnSurya Energy Pvt Ltd | Energy industries (renewable - / non-renewable sources) | India | 52,709 | CERs | Voluntary cancellation of 52,709 GS CERs for the purpose of conversion to Gold Standard VERs from project GS5523. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 17/03/2022 | Attestation letter |
| 1259 | Enercon Wind Farm (Hindustan) Ltd in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 2,700 | CERs | Cancellation on behalf of Handelsbanken Finland, 2019 | 16/01/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3,500 | CERs | Acreditación a favor de Componentes Intel de Costa Rica S.A. de 3,500 certificados de emisión de reducciones CER’s, para la compensación en su equivalente a toneladas métricas de dióxido de carbono, generados en la Planta INOLASA, ubicada en Barranca de Puntarenas, documentado por la UNFCCC como proyecto número 1314: Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | 25/11/2020 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 212 | CERs | Voluntary Cancellation in favor of DAVIVIENDA (Nit 860.034.413-7 for the neutralization voluntary of 212 Ton CO2 | 30/12/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 23,211 | CERs | Compensation of carbon footprint for year 2020 of Acciona Service | 15/04/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 100 | CERs | Compensación voluntaria de emisiones mediante el manejo responsable de residuos de la empresa ESSITY HIGIENE Y SALUD MÉXICO, S.A. de C.V. planta Monterrey (Abril-Junio 2021) | 30/09/2021 | Attestation letter |
| 1326 | Jorethang Loop Hydroelectric Project, India | Energy industries (renewable - / non-renewable sources) | India | 63,158 | CERs | “To compensate GHG emissions on behalf of Flex Ltd.” | 22/02/2019 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,464 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax. | 18/04/2019 | Attestation letter |
| 6152 | Coke oven gas comprehensive utilization for co-generation project in Shandong Jikuang Morningsun Thermal Power Co., Ltd |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 756 | CERs | Freiwilliger Beitrag zum globalen Klimaschutz der Familie Dilger. | 01/07/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,392 | CERs | 2016.264 | 2020 | 11/11/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,014 | CERs | Retiro a favor de TERPEL S.A identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 1.014 Titular de la iniciativa: ISAGEN S.A. E.S.P. Metodología de cuantificación: ACM0002 - Version 16.0: Grid-connected electricity generation from renewable sources | 13/09/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 292 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Airport | 11/05/2022 | Attestation letter |
| 2023 | Nimoo-Bazgo Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | India | 137,167 | CERs | To offset CO2 emissions from fuel gallons delivered. | 28/01/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 24 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for November and December 2021 sales | 10/01/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 100 | CERs | Compensación voluntaria de emisiones mediante el manejo responsable de residuos de la empresa ESSITY HIGIENE Y SALUD MÉXICO, S.A. de C.V. planta Monterrey (Julio-Septiembre de 2021) | 13/10/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 25,000 | CERs | Cancelación voluntaria a favor de FRONTERA ENERGY COLOMBIA CORP (NIT 830126302-2) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 29/12/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 1,076 | CERs | Neutralizacao das emissoes referentes a 2021 da Palmeira Ambiental. | 17/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 99 | CERs | 2020-0868 | 2020 | 16/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 212 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SOLUTRANS (NIT 805.007.853-8), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 219 | CERs | The True Gem - For offsetting 219 metric tonnes of CO2e generated from estimated energy emissions of 4,252 pieces of their jewelry products and making them carbon neutral between January 1, 2021 and December 31, 2021. | 27/05/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Mitigación de la Huella de Carbono de Mayra Moreno Benitez | 09/06/2022 | Attestation letter |
| 8270 | 9.9 MW Wind power Project by Texmo Industries at A.P. and Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 1,188 | CERs | First Climate, Klimaneutralstellung Green by Choice 2021 v1.0 und optional v1.1 | 02/06/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 207 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 207 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 207 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 12/09/2022 | Attestation letter |
| 3065 | Hunan Yueyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 100,975 | CERs | retired on behalf of FZ | 28/12/2021 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 396 | CERs | “Firstcon GmbH” | 20/12/2021 | Attestation letter |
| 7014 | Improved Cook Stoves for East Africa (ICSEA) |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
Uganda, Kenya, Burundi, Rwanda, Lesotho, South Africa, Ethiopia | 1,005 | CERs | Retired on behalf of Teréga - REF: 2022-10001 | 30/06/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 770 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of June 2019 | 15/07/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 48 | CERs | Voluntary Cancellation of 48 CERs for transaction no. 407 to 411 on www.clpcarboncredits.com | 09/08/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 25 | 22/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 280,000 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT 860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/11/2021 | Attestation letter |
| 10165 | Wind Power Project by M/s. D. J. Malpani in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 199,210 | CERs | "DL Carbon Neutrality 2021" | 12/04/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2 | CERs | CO2-Kompensation Flugreisen im Jahr 2021 für Fr. Monika Bröcker-Garbers. | 23/11/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 100 | CERs | OFFSET ON BEHALF OF Compañía Europea de Gestores de incentivos SL REASON FOR COMPENSATION I am offsetting the carbon footprint of my clients | 21/10/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 6,265 | CERs | Ministère de l'Europe et des Affaires Étrangères (MEAE) | 10/03/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 13/01/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,997 | CERs | 2019-0309 | 2020 | 09/11/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. P. K. Gupta Managing Director, State Bank of India. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Mitigación de la Huella de Carbono de Jessica María Valdés De la Garza | 05/05/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 22,500 | CERs | on behalf of DMG Mori | 16/03/2020 | Attestation letter |
| 0243 | 14.8 MW small-scale grid connected wind power project in Jaisalmer state Rajasthan, India by RSMML | Energy industries (renewable - / non-renewable sources) | India | 23,594 | CERs | PROGAS GmbH & Co KG – KLIMA neutral | 02/07/2019 | Attestation letter |
| 8096 | Jilin Changling Biomass Utilization Project | Energy industries (renewable - / non-renewable sources) | China | 996 | CERs | Cancelled to neutralize the carbon emissions generated by JIANGSU EASYLAND AUTOMOTIVE CORPORATION from 2021.1.1 to 2021.12.31 | 30/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 821 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CEMEX COLOMBIA (NIT 860002523, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 10285 | Ethiopia Off-Grid Renewable Energy Program | Energy industries (renewable - / non-renewable sources) | Ethiopia | 22,744 | CERs | CERs that the UK Department for Business, Energy and Industrial Strategy (BEIS) purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated 24-Oct-2019. | 14/05/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,749 | CERs | 2013-021 | 2020 | 16/12/2020 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 24,248 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of RAIA DROGASIL S.A., to offset CO2 emissions related to the reported GHG Emissions from 2020. | 19/01/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Retired on behalf of FZ | 21/10/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 200,000 | CERs | Retired on behalf of Eni Gas and Power to offset carbon footprint of its clients | 17/09/2021 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 216,702 | CERs | This request is submitted to cancel the 216,702 CERs issued from Sihwa Tidal Power Plant CDM Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 05/03/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 712 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 712 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 712 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 16/08/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 882 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 882 ton of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 882 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Certificate 2 of 2 for 1.699 tCO2e on total Certificado 2 de 2 para um total de 1.699 tCO2e Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 10/02/2022 | Attestation letter |
| 9181 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – India |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
India | 1 | CERs | Retirement on behalf of Climate Impact Partners for Customer ID 00080835 | 26/08/2022 | Attestation letter |
| 4294 | Gwangju metropolitan city sanitary landfill LFG power plant CDM project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 500 | CERs | This cancellation is for usage to offset Ecoeye's carbon emission, and Ecoeye is beneficiary of this cancellation. | 17/12/2020 | Attestation letter |
| 1052 | Chacabuquito Hydroelectric Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 2,234 | CERs | BP Technology Ventures Limited requested IBRD as Trustee of the Carbon Funds to cancel all emission reductions resulting from its participation in Chile Chacabuquito Project (CDM Ref# 1052) per instructions in Cancellation Letter dated 14/01/2021. | 03/02/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 181 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor del Banco Centroamericano de Integración Económica – BCIE para compensar el 100% de las emisiones GEI generadas en su Oficina de Representación en El Salvador ubicado en la Colonia San Benito, San Salvador durante el año 2019 y 2020. | 13/10/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,607 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by MAYAGUEZ (NIT 890.302.594, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 3222 | BRASCARBON Methane Recovery Project BCA-BRA-08, Brazil. | Waste handling and disposal | Brazil | 62,888 | CERs | Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 25/05/2021 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 64,648 | CERs | “Voluntary offset retirement made by ecosecurities on behalf of Banco Bradesco S.A. to compensate 64’648 tCO2e corresponding to its operational GHG emissions from Scope 1, 2 and 3 generated in 2019.” | 29/03/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,747 | CERs | 2020-0147 | 2020 | 11/11/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 4,922 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON identificado con NIT 811026709-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 4.922 Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 225 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de MOOG MEDICAL DEVICES GROUP para compensar las emisiones GEI generadas durante el período 2021 y cumplir con los requisitos del PPCN. | 29/09/2022 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 9,128 | CERs | For DL 2021 Carbon Neutrality. | 13/01/2022 | Attestation letter |
| 0846 | La Venta II | Energy industries (renewable - / non-renewable sources) | Mexico | 6,469 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 23/06/2020 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 736 | CERs | Retired on behalf of CHOOOSE | 06/04/2022 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 968 | CERs | “Compensação do Grupo Puravida referente às emissões de GEE do ano de 2021 no âmbito do Programa Compromisso como Clima através da compra de 968 REs geradas a partir de projeto de energia renovável.” | 19/05/2022 | Attestation letter |
| 0073 | "Las Vacas" Hydroelectric project | Energy industries (renewable - / non-renewable sources) | Guatemala | 66,112 | CERs | ENEGAN S.P.A. – Compensazione quote emissioni GAS 1°semestre anno 2022 per conto di ENEGAN S.P.A. | 28/09/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 182 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 182 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 182 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 16/08/2021 | Attestation letter |
| 0547 | Facilitating Reforestation for Guangxi Watershed Management in Pearl River Basin | Afforestation and reforestation | China | 15,516 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 04/12/2019 | Attestation letter |
| 1326 | Jorethang Loop Hydroelectric Project, India | Energy industries (renewable - / non-renewable sources) | India | 17,158 | CERs | “Yeti Airlines Pvt. Ltd. is offsetting the total Green House Gases emitted from it’s aircraft, vehicles, facilities etc. in 2018 to participate in the protection of our environment by becoming a Carbon Neutral airline. We hope to provide a clear path towards a new sustainable vision for the aviation sector in Nepal.” | 14/03/2019 | Attestation letter |
| 9111 | 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 160 | CERs | Voluntary Cancellation on behalf of GRUPO MARKTEST for its Greenhouse Gas (GHG) management strategy for their operations based in Portugal, to be used as a reduction of their overall GHG emissions from January 1st to December 31st, 2018 | 05/02/2020 | Attestation letter |
| 0198 | San Jacinto Tizate geothermal project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 24,290 | CERs | Retirement on behalf of Sphere 3D Mining Corp. to offset current and future carbon emissions | 29/03/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 18 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 78 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de enero 2022 | 25/02/2022 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 2,261 | CERs | Retired on behalf of SODIMAC Chile - Despachos CO2 Neutral 2020 - SCX ID 0084-E1704A67. | 22/02/2021 | Attestation letter |
| 6437 | Grid Connected Wind Power Project by M/s. D. J. Malpani at Ratan Ka Bas (RKB), Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 8,217 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 10430 | Man and Man Enterprise Improved Cooking Stoves CDM Programme in Ghana supported by Republic of Korea | Energy demand | Ghana | 513 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 12/08/2021 | Attestation letter |
| 2225 | Korea Midland Power Co., LTD. (KOMIPO) Boryeong Small Hydroelectric Power Plant Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 17,830 | CERs | Cancelled CERs will turn into be KOCS(korea offset credits) Which can be used in domestic emission trading scheme of Republic of Korea | 21/08/2019 | Attestation letter |
| 4930 | Vaayu India Wind Power Project in Tamilnadu | Energy industries (renewable - / non-renewable sources) | India | 166,736 | CERs | Voluntary cancellation for the purpose of conversion to Gold Standard VERs from project GS4425. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 01/03/2021 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 900 | CERs | Compensación Huella de Carbono Pacific Hydro Chile S.A. año 2019 | 23/12/2020 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 40 | CERs | Retirement Beneficiary : Sunlight Financial LLC, Reason - I want to contribute to Climate Action. | 10/03/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 13,000 | CERs | Retired on behalf of Climaider | 01/07/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 463 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 217 670,0 kms of riders using UberX during January 2021 made by A-CO2 | 05/02/2021 | Attestation letter |
| 2742 | Zafarana KfW IV Wind Farm Project, Arab Republic of Egypt | Energy industries (renewable - / non-renewable sources) | Egypt | 90,380 | CERs | First Climate for AVIA AG | 30/03/2022 | Attestation letter |
| 2714 | Assisted Natural Regeneration of Degraded Lands in Albania | Afforestation and reforestation | Albania | 10,981 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 16/11/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 87 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CONCRETOS EL DORADO S.A (NIT 900.253.780-7), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 7 | CERs | In the month 14th May - 14th June Furthr retired 7 tons of carbon with Carbonbay | 06/07/2020 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Mitigación de la Huella de Carbono de Luciana Ibañez Benitez | 09/06/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 25 | CERs | in the name of Offset Alliance / AVA | 19/02/2020 | Attestation letter |
| 8012 | Grid connected electricity generation from renewable source: Windfarm Complex Santa Vitória do Palmar and Chuí | Energy industries (renewable - / non-renewable sources) | Brazil | 1,500 | CERs | Brandili Têxtil Ltda - 84.229.889/0001-73 Compensação voluntária de 1500 tCO2e referente às emissões de gases de efeito estufa (GEE) das operações da Brandili Têxtil Ltda no ano de 2022. | 12/10/2022 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 1,688 | CERs | Naturgas – Verbrauch 2021 CO2-neutrales Erdgas des Energieversorgers: Städtische Werke AG Königstor 3-13 34117 Kassel Deutschland (Germany) Kompensation der CO2-Emissionen aus der Verbrennung von Erdgas für Kunden der Städtische Werke AG. | 17/02/2022 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 70,699 | CERs | Voluntary cancellation of 70,699 CERs conducted by Siemens Gamesa Renewable Energy S.A. on behalf of Bii Nee Stipa to offset the company’s Scope 1 and Scope 2 CO2 emissions from fiscal year 2019, representing the period between October 1, 2018 and September 30, 2019 | 11/11/2019 | Attestation letter |
| 3827 | Bundled Hadong-Busan photovoltaic Power Project of The Korea Southern Power Corporation (1MW Hadong Photovoltaic Power + 0.39MW Busan Photovoltaic Power, Bundling Project) | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 930 | CERs | The amount of 930 CERs will be converted to Korean offset Credit in the Korea Emissions Trading Scheme. | 12/03/2020 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 16,560 | CERs | Voluntary offset on behalf of Jilin Province Jidian International Trade Co.,Ltd to offset the carbon emissions in August 2021 for Carbon Neutral | 27/09/2021 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 71,450 | CERs | ZEUSS PETROLEUM S.A.S NIT: 811043174-1 | 18/09/2019 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 102 | CERs | Compensación por 102 toneladas de CO2e generadas por la flotilla de vehículos de Protección Catódica de México S.A. de C.V. en 2018. | 27/02/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action - TR 19 | 22/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,171 | CERs | Retiro a favor de WORLD FUEL SERVICES identificado con NIT 830112215-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 18/07/2022 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 34,772 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 21/01/2022 | Attestation letter |
| 5461 | Fatima N2O Abatement Project | Chemical industries | Pakistan | 3,860 | CERs | Retirement-Beneficiary: JoCo Cruise (JPSD Partners, LLC) Retirement Reason Details: Voluntary cancellation on behalf of JoCo Cruise for its estimated marine fuel emissions during the March 6, 2021 JoCo Cruise Charter (projected) as well as for the estimated emissions for the JoCo Cruise group (as a percentage of all ship's passengers) for the following three group sailings: Jan 2 2011, Feb 19 2012, and Feb 10 2013. Part of the JoCo Cruise Carbon Roadmap, more details at jococruise.com/carbon | 06/03/2020 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 439 | CERs | Compensación Huella de Carbono Pacific Hydro Chile S.A. año 2020 | 10/03/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,551 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTEMPO SAS (NIT 800051673-7), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 0073 | "Las Vacas" Hydroelectric project | Energy industries (renewable - / non-renewable sources) | Guatemala | 31,123 | CERs | ENEGAN S.P.A. – Anticipo Compensazione quote emissioni GAS 2° semestre anno 2022 per conto di ENEGAN S.P.A. | 28/09/2022 | Attestation letter |
| 9697 | 5.10 MW Wind Power Project by Shyam Metalics & Energy Limited in Maharashtra, India | Energy industries (renewable - / non-renewable sources) | India | 22,988 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Beneficiary: Avia Marketing Ltda. Voluntary cancellation made by Anaconda Carbon on behalf of Avia Marketing Ltda. to offset emissions generated from the carbon footprint program for customers on Antojose. Travel for the months of October 2018 though January 2019. | 18/01/2019 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 44,000 | CERs | Aquisição de 300.000 VCUs para a compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A | 20/10/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 9,019 | CERs | This voluntary cancellation of CERs was made on behalf of Programa Amigo do Clima. Details provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 5153 | KDHC Daegu Biomass Cogeneration Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 57,331 | CERs | It is to be offset for domestic carbon emission teading in South Korea | 27/09/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3 | CERs | Convención Comercial Anual Santalucía 2021 (digital) | 30/07/2021 | Attestation letter |
| 2834 | Mokpo Landfill Gas Recovery Project for Electricity Generation |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 49,052 | CERs | To utilze CERs at Korean ETS | 30/12/2020 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 289 | CERs | To offset the GHG generated from Customers of China Emissions Exchange (CEEX) | 22/12/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 14,709 | CERs | Beneficiario: PetStar Purpose: El presente certificado acredita la compensación de 14,709 tCO2 correspondiente a las emisiones directas generadas por las operaciones durante el año 2020 | 29/10/2021 | Attestation letter |
| 3779 | Accion Fraterna Biogas CDM project for rural communities in Anantapur, Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 7,661 | CERs | 2028 women from 120 villages in Andhra Pradesh reduced 7817 tonnes of GHG by using Biogas instead of firewood, kerosene or LPG. These Biogas units were built with generous contributions from IndiGo passengers who compensated a part of their travel emissions. | 18/12/2018 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 877 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 877 ton of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” Reference month: January 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 877 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Mês de referência: Janeiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 10/03/2022 | Attestation letter |
| 9176 | Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” | Energy demand | Honduras | 957 | CERs | Cancellation on behalf of Löfbergs Lila AB | 10/04/2019 | Attestation letter |
| 3854 | 20 MW Enercon Wind farms (SAI) Pvt. Limited in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 100,722 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 52,500 | CERs | Retired on behalf of KBR. | 22/12/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 60 | CERs | Voluntary compensation made by Anaconda Carbon on behalf of Green Earth Gardens Carbon, Capture & Storage Theme Park, to offset for Platescrape all GHG emissions generated from the packing and delivery of 60 units to Costa Rica. | 09/11/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 3,446 | CERs | Retired on behalf of Cool Effect for the month of December 2020. | 01/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Thomas K C Chan” for Annual Dinner in 2021 (Transaction ID: 709) | 18/02/2021 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 73,467 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 21/12/2020 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 14,339 | CERs | BIOMAX COMBUSTIBLES S.A. NIT:830136799-1 | 19/09/2019 | Attestation letter |
| 1151 | KSPCL Waste Heat to Power project, India | Energy industries (renewable - / non-renewable sources) | India | 3,436 | CERs | Retired on behalf of FZ. | 28/03/2022 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 79 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00076181 | 30/09/2021 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 44 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 15/02/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 142 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by VEOLIA ASEO PALMIRA (NIT 815.000.764-5, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 0312 | 18 MW Kemphole Mini Hydel Scheme (KMHS), by International Power Corporation Limited, India | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Decommissioning on behalf of the customer by natureOffice GmbH. More information at www.climatebase.io | 22/03/2022 | Attestation letter |
| 3065 | Hunan Yueyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 40,000 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 06/01/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,521 | CERs | Voluntary cancellation of 2521 CERs to offset the carbon footprint of technical and administrative facilities property of EAAB-ES and its operations of drinkable water supply and wastewater treatment in Bogotá, in order to reach a carbon neutral condition | 14/01/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 65 | CERs | Voluntary Cancellation of 65 CERs for transaction no. 928-940 (KAL) | 10/12/2021 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 2,499 | CERs | To Neutralize the Carbon Emission generated by SIP Dulwich College United School in 2021. | 20/07/2022 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 5,000 | CERs | Not shared | 18/04/2019 | Attestation letter |
| 9610 | 5MW Solar PV Power Plant by AEPL | Energy industries (renewable - / non-renewable sources) | India | 884 | CERs | Retired on behalf of Luftfartsverket to offset emissions generated by our operations during 2017. | 20/12/2018 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 37 | CERs | these credits are retired on behalf of Furthr for its monthly subscribers between 15th March 2021 and 14th May 2021 | 25/05/2021 | Attestation letter |
| 0198 | San Jacinto Tizate geothermal project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 46,104 | CERs | Retirement on behalf of Sphere 3D Mining Corp. to offset current and future carbon emissions | 29/03/2022 | Attestation letter |
| 3570 | Alto Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 100,000 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY (NIT 860.005.223-9) for the neutralization of 100,000 tons of CO2 associated with fossil fuels to be used by CHEVRON PETROLEUM COMPANY (NIT 860.005.223-9) in order not to cause the national carbon tax | 05/09/2019 | Attestation letter |
| 2347 | 150 MW grid connected Wind Power based electricity generation project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 11,700 | CERs | Purpose:"Voluntary cancellation in favor for offsetting GHG emissions of the Asian Development Bank’s Headquarters in Manila, Philippines for 2018" Beneficiary: "Asian Development Bank" | 04/09/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Ravinder Pal Singh Cyber Securities & Digital Cities, Health Care (Public Sector), Dell EMC., EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,014 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by CEMEX COLOMBIA SA NIT 860002523-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 0329 | Babanpur, Killa and Sahoke Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 406 | CERs | Navitas Solar is buying carbon credits for offsetting their company's emission to become carbon neutral for the year 2021 | 06/04/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon removal credits for voluntary climate action - TR 53 | 22/12/2020 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 17,123 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of RD S.A., to offset CO2 emissions related to the reported GHG Emissions from 2019. | 06/01/2021 | Attestation letter |
| 8095 | Wind Power Project at Rajkot, Gujarat | Energy industries (renewable - / non-renewable sources) | India | 79,663 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 19/02/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 639 | CERs | Voluntary cancellation by Shijiazhuang International Conference and Exhibition Center Co. Ltd to offset the GHG Emissions generated by the daily operation of its Hall 8 of Shijiazhuang International Convention and Exhibition Center in 2021 | 21/06/2022 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 150,000 | CERs | These CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. CERs are cancelled from CPA001 to CPA007, from all of MP3a, all of MP3b and part of MP3c, as shown in the attached sheet. Calculations extracted from 'ER spreadsheets and survey.zip' file under Additional Documents. | 24/11/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Professor Jun Yang” for Annual Dinner in 2021 (Transaction ID: 746) | 22/02/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 424 | CERs | OFFSET ON BEHALF OF: MADRID TROPHY PROMOTION, S.L.U. REASON FOR COMPENSATION: ACCIONA Open de España de Golf 2021 | 03/02/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 2 | CERs | NEXOLUB REASON FOR COMPENSATION I am offsetting the carbon footprint of my company's trips | 07/02/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 216,775 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT 860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustibles fósiles | 18/01/2022 | Attestation letter |
| 3561 | Reforestation on Degraded Lands in Northwest Guangxi | Afforestation and reforestation | China | 20,594 | tCERs | Cancellation per Syngenta's request dated August 12, 2019 | 20/09/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 205 | CERs | on behalf of Native's client | 15/08/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 207 | CERs | Crédit Coopératif | 05/04/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,688 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by PETROWORKS (NIT 830.116.134-9), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | Evento BMW M TD Jarama | 30/07/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Sadhu Gnanvatsal Das BAPS, Akshardham. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 251 | CERs | Compensación voluntaria hecha por Anaconda Carbon Costa Rica S.A. a favor de Vehículos Internacionales VEINSA S.A. para compensar los GEI derivados de la operación del año 2019 de sus oficinas centrales en Curridabat y cumplir con los requisitos del PPCN 2.0 | 09/03/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 456 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 456 tons of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” Reference month: April 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 456 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Mês de referência: Abril de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 30/05/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Gammon Construction Limited” for Annual Dinner in 2021 (Transaction ID: 698) | 18/02/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 370 | CERs | Beneficiary: Mesoamerica Partners MP S.A. Retirement reason details: Voluntary cancellation on behalf of Mesoamerica Partners MP S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st 2016 to December 31, 2017. | 18/02/2019 | Attestation letter |
| 2138 | Chao Khun Agro Biogas Energy Project | Waste handling and disposal | Thailand | 50 | CERs | Simon and Julie Chadwick travelling sabbatical 28 Jun 2019 to 16 Jan 2020 carbon "double offset" of airmiles to make net positive. | 27/03/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 40 | CERs | Voluntary cancellation in favor of BIOMAX S.A. ; NIT 830136799-1 for neutralization of the GHG emissions, to be used by CORONA - DESPACHADORA INTERNACIONAL DE COLOMBIA SAS NIT 860068121-6, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 20,557 | CERs | PROGAS GmbH & Co KG – KLIMA neutral | 05/07/2019 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 456 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 456 tons of greenhouse gas (GHG) emissions of the CBO VITORIA vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 456 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO VITORIA.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 0935 | Methane recovery from waste water generated from wheat straw wash at Paper manufacturing unit of Shreyans Industries Limited (SIL) |
Waste handling and disposal
; Agriculture |
India | 9,532 | CERs | Energie Direct MineralolhandelsgesmbH | 12/06/2019 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 7,847 | CERs | Cancelled on behalf of the Foundation "Zukunft des Kohlenstoffmarktes" | 12/11/2021 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 100,000 | CERs | Redemption on behalf of Nordic Energy Services for 2022 and 2023 offsetting | 02/09/2022 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 7,835 | CERs | 667 Technology GmbH/ Planetly | 17/08/2020 | Attestation letter |
| 0935 | Methane recovery from waste water generated from wheat straw wash at Paper manufacturing unit of Shreyans Industries Limited (SIL) |
Waste handling and disposal
; Agriculture |
India | 16,033 | CERs | Energie Direct MineralolhandelsgesmbH | 12/06/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 215 | CERs | Beneficiary: FACO (Franz Amrhein y Compañía) S.A. Retirement reason details: Compensación voluntaria emitida por Anaconda Carbon a favor de FACO (Franz Amrhein y Compañía) S.A. por la cantidad el 215 toneladas de dióxido de carbono equivalente, para la compensación de la huella de carbono generada por las operaciones de la empresa durante el período 1 de enero al 31 de diciembre del 2018. | 18/02/2019 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 404 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 404 tons of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” Reference month: June 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 404 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Mês de referência: Junho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 1268 | Tungabhadra wind power project in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 13,253 | CERs | “Offsetting the operational emission of the Hungarian Gas Storage Ltd. in 2022 and 2023.” | 21/09/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Prof WONG Sze Chun” for Annual Dinner in 2021 (Transaction ID: 720) | 18/02/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 50 | CERs | Retirement – Beneficiary: CARIBE HOSPITALITY DE COSTA RICA SRL. Retirement Reason Details: Voluntary cancellation for Hotel Courtyard Escazú, for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality program for their emissions emitted from January 1st to December 31st, 2019. | 23/01/2020 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 1,824 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 8606 | Wind Power Project at Vaspet, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 71,026 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 31/05/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | Cancellation of GS-CERs in the name of Madam Savitha Ananth to offset the emissions due to travel to & from Germany in June 2019, and for future travel. | 06/06/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6,120 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Distribuidora la Florida S.A (3-101- 295868) para compensar las emisiones GEI generadas por la huella operacional en Costa Rica durante el año 2020, para cumplir con los requisitos del PPCN. | 08/04/2021 | Attestation letter |
| 6083 | Omnia N2O Abatement Project II | Chemical industries | South Africa | 25,853 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 24/11/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,824 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by CEMEX TRANSPORTES DE COLOMBIA SA NIT 830078000-0, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 3531 | Adavikanda, Kuruwita Division Mini Hydro Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 20,000 | CERs | “CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes.” | 20/03/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 12 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by VEOLIA ASEO PRADERA (NIT 815.000.855-7, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 4,092 | CERs | Cancelled to neutralize the Carbon Emissions generated by Easyhome Tower in 2021 | 11/10/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 8,600 | CERs | Retired on behalf of Posten Norge (Divisjon E-handel og logistikk) | 30/10/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 30,000 | CERs | Para la no causación del impuesto al carbono del mes de enero de 2021, de Biomax S.A. NIT 830.136.799-1. | 30/11/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,140 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by UNION TEMPORAL SISTUR TRANSURBANOS (NIT 900.297.577-7), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 154,290 | CERs | Purpose: Aposentadoria em nome da Unidas S.A. para compensação das emissões dos escopos 1, 2 e Escopo 3, relativos aos inventários dos anos de 2021 a 2025. Beneficiary: Unidas S.A. | 30/07/2021 | Attestation letter |
| 10269 | Renewable Power Project by Hindustan Gum (EKIESL-CDM.August-15-01) | Energy industries (renewable - / non-renewable sources) | India | 9,219 | CERs | DEW21 Öko Erdgas 2020/2021 | 01/04/2022 | Attestation letter |
| 9047 | Jbel Sendouq-Khalladi (“Khalladi”) wind farm project in Morocco | Energy industries (renewable - / non-renewable sources) | Morocco | 34,439 | CERs | Voluntarily cancellation of 34,439 CERs for the purpose of conversion to Gold Standard VERs for project GS5073. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 17/09/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 624 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 624 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 624 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 27/05/2021 | Attestation letter |
| 3404 | Rwanda Electrogaz Compact Fluorescent Lamp (CFL) distribution project | Energy demand | Rwanda | 510 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 03/09/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 21 | 22/12/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,747 | CERs | 2018-0181 | 2020 | 11/11/2020 | Attestation letter |
| 3520 | Federal Intertrade Haiyuan Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 950 | CERs | Retired on behalf of ClimatePartner for order 14214-2109-1001 | 20/09/2021 | Attestation letter |
| 4537 | DakRTih Hydropower Project, Vietnam | Energy industries (renewable - / non-renewable sources) | Viet Nam | 44,762 | CERs | Carbon credits retired by AzzeroCO2 on behalf of Fastweb Spa - estimated value of Scope 3 emissions related to use of products by customers in 2023 | 14/09/2022 | Attestation letter |
| 2936 | 24 MW Bhilangana - III Hydro Power Project | Energy industries (renewable - / non-renewable sources) | India | 1,200 | CERs | The Carbon Credits have been retired permanently on behalf of "German Experts Car Maintenance LLC" to offset an equivalent amount of Carbon Footprints calculated across emissions and projected for the entire operational year 2022, to achieve the status of Carbon Neutral for the year | 31/05/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Professor Hong K. LO” for Annual Dinner in 2021 (Transaction ID: 747) | 22/02/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación Carbono | Bélgica 29 Diciembre-2 Enero | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 10/01/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 15/03/2022 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 27,052 | CERs | Retiro a favor de PETROLEOS DEL MILENIO SAS - PETROMIL SAS identificado con NIT 819001667-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 23/09/2022 | Attestation letter |
| 0752 | Omnia Fertilizer Limited Nitrous Oxide (N2O) Reduction Project | Chemical industries | South Africa | 1 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 16/11/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Subodh Kumar,Executive Director(PC, AE & SD) Indian Oil Corporation Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 825 | CERs | Compensación voluntaria realizada por Adobe Rent a Car (Rente un Auto Esmeralda S.A.) para compensación de emisiones de GEI del año operacional 2020. | 28/02/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 259 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 1 241 351,00 kms of riders using UberX during November 2021 made by Anaconda Carbon. | 16/12/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 2,509 | CERs | Purpose: Programa Correos Compensa Beneficiary: Sociedad Estatal Correos y Telegrafos S.A. | 05/10/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 123 | CERs | 2020-0916 | 2020 | 16/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 62 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 62 Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 610 | CERs | Retirement – Beneficiary: Anaconda Carbon ; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 923 350,0 kms of riders using UberX during April 2020 made by A-CO2 | 15/05/2020 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 283 | CERs | Purpose: Aposentadoria para a compensação da pegada de carbono da Rodoxico Transportes Ltda, referente a frota da Unidas Beneficiary: Rodoxico Transportes Ltda | 21/12/2021 | Attestation letter |
| 0950 | Bio energy in General Deheza –Electricity generation based on peanut hull and sunflower husk | Energy industries (renewable - / non-renewable sources) | Argentina | 15,560 | CERs | Consumo referente al programa Carbón Neutral de Cabify para el año 2022 | 19/07/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6 | CERs | OFFSET ON BEHALF OF: Ron Barceló REASON FOR COMPENSATION: Campaña de verano Ron Barceló | 16/02/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 78 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 13/01/2022 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 72 | CERs | Cancelación de créditos para abatir Emisiones de Flota vehicular operativa VEMO, alcances 1 y 2. Cancellation of credits to reduce Emissions of the VEMO operational vehicle fleet, scopes 1 and 2. | 04/07/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 24 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Industrias Buenos Aires SA para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 10/09/2021 | Attestation letter |
| 1139 | Bagasse based Cogeneration Project at Pudukkottai Tamil Nadu, India | Energy industries (renewable - / non-renewable sources) | India | 31,465 | CERs | Beneficiary Name: Sterling and Wilson Solar Limited Remarks: “Offsetting our Carbon Footprint for FY 2019-20, to Empower a Renewable Future”. | 24/07/2020 | Attestation letter |
| 9708 | Niger Acacia Senegal Plantation Project | Afforestation and reforestation | Niger | 6,472 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds | 18/11/2019 | Attestation letter |
| 4150 | Inner Mongolia Wulanchabu Hongji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 411,150 | CERs | Voluntary cancellation to offset scope 1 emissions from shipping operations. | 06/01/2022 | Attestation letter |
| 1300 | 155 MW Gas based combined cycle power project at Hazira | Energy industries (renewable - / non-renewable sources) | India | 40,775 | CERs | Cancellation of 40,775 credits corresponding to 110% of Braathen Regional Airlines (BRA) ABs calculations according to the GHG protocol for scope 1 CO2 emissions from 23rd June 2021 – 17th May 2022. | 10/06/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 551 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 551 tons of greenhouse gas (GHG) emissions of the CBO Flamengo vessel fuel consumption.” Reference month: May 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 551 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Flamengo.” Mês de referência: Maio de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 13,826 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis Goiana. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 26,464 | CERs | Retired by Cool Effect on Behalf of Epsilyte | 28/09/2022 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 10,708 | CERs | Livonia Print - offsetting 13518 tons CO2e for Scope 1 & 2 emissions and offsetting of emissions from book production on behalf of clients. | 05/01/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 133 | CERs | Voluntary cancellation of 133 CERs to offset the CO2e emissions of Banco de Inversion y Comercio Exterior (BICE), event which took place the 11th of September of 2018 in Argentina. | 31/01/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6 | CERs | Retirement – Beneficiary: Anaconda Carbon ; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 20 506,0 kms of riders using UberCOMFORT during April 2020 made by A-CO2 | 15/05/2020 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 334,811 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 17/06/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 15 | CERs | on behalf of Native's client | 15/08/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Mitigación de la Huella de Carbono de María Trinidad Salgado Olivares | 05/05/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 154,000 | CERs | Klimaneutralstellung der Fernwärme der ESTW | 31/03/2022 | Attestation letter |
| 1575 | Kadamane Mini Hydel Scheme-1 (KMHS-1) | Energy industries (renewable - / non-renewable sources) | India | 88 | CERs | Retired on behalf of ReNew Energy Global PLC to offset its scope 1 and scope 2 emissions from its operations in FY 2021-22. | 29/08/2022 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 4 | CERs | Excalibur Education Inc - I am offsetting the carbon footprint of my company's shipments | 24/08/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,384 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 2384 tons of CO2 associated with fossil fuels to be used by CONCRETOS ARGOS (Nit 860.350.697-4) in order not to cause the national carbon tax. | 09/06/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | on behalf of C. H. Thommessen | 05/01/2021 | Attestation letter |
| 8474 | Maracanã Small Hydropower Project | Energy industries (renewable - / non-renewable sources) | Brazil | 2,265 | CERs | Purpose: "Carbon Footprint offset for the year 2021 of the Santander Group" Beneficiary: Santander Group | 17/01/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 118 | CERs | Beneficiary: FACO (Franz Amrhein y Compania S.A.) Retirement reason: Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compania S.A.) to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of January 2019. For more Information please visit: www.hondacostarica.com/co2 | 17/04/2019 | Attestation letter |
| 1145 | 8.75MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 522 | CERs | Retirement Beneficiary -SEM Energy Ltd. Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 26/07/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Arcadis Design & Engineering Limited” for Annual Dinner in 2021 (Transaction ID: 690) | 17/02/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Cancelled on Behalf of FZ | 20/08/2019 | Attestation letter |
| 8555 | Xinjiang Hami Southeast Wind Zone Yandun Third Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 60,025 | CERs | retired on behalf of FZ | 30/06/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,369 | CERs | Retiro a favor de WORLD FUEL SERVICES identificado con NIT 830112215-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 11/08/2022 | Attestation letter |
| 0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | Waste handling and disposal | Brazil | 8,790 | CERs | DL Carbon Neutrality 2021 | 20/04/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 7 | CERs | Voluntary cancellation in favour of Chevron Petroleum Company (NIT 860005223-9) for the neutralization of the GHG emissions, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Dr Vincent Fong” for Annual Dinner in 2021 (Transaction ID: 744) | 22/02/2021 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 65,396 | CERs | For DL 2021 Carbon Neutrality. | 13/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 10 | 22/12/2020 | Attestation letter |
| 2138 | Chao Khun Agro Biogas Energy Project | Waste handling and disposal | Thailand | 250 | CERs | Voluntary cancellation made by Thai Biogas Energy Company Limited on behalf of ZABORIN Co., Ltd to offset CO2 emissions generated from Zaborin's fossil fuel related energy consumption. Funds received will be used for the development of new sustainable biogas emission reduction projects. | 30/04/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 394 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SOCIEDAD AZCARATE (NIT 805.017.444-1), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 17 998,0 kms of riders using UberCOMFORT during August 2020 made by A-CO2 | 09/09/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 998 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of December 2018 | 11/01/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,688 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES VIGIA (NIT 800042210-2, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Retired For FZ | 06/02/2020 | Attestation letter |
| 2834 | Mokpo Landfill Gas Recovery Project for Electricity Generation |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 45,316 | CERs | To transfer and use CERs as Korean Offset Credit. | 11/01/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 706,942 | CERs | "2018-0060 | 2020" | 26/10/2020 | Attestation letter |
| 7100 | Los Cocos II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 5,500 | CERs | Retirement Beneficiary : RON BARCELO Carbon Neutrality Program 2021. Retirement for the offset of the entire corporate activity and product life cycle emissions in 2020, this in accordance with Carbon Neutral Protocol, ISO14064-1 and ISO14067 standards. The Carbon Neutrality Program covers (1) controlled activities in own process including agricultural operations, processing plants and employee transportation; but also (2) uncontrolled activities resulting from the transportation and manufacture of raw materials (glass bottles, plastics, metals,…), worldwide maritime and land distribution of products, and final disposal of packaging material. | 12/05/2021 | Attestation letter |
| 6003 | Wind power project by Sterling Agro Industries Ltd. | Energy industries (renewable - / non-renewable sources) | India | 18,680 | CERs | On behalf of Lenovo Clients 1 August 2022 – 31 August 2022, Program Managed by Lenovo. | 08/09/2022 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 912 | CERs | Voluntary cancellation of 912 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-4 | 25/02/2022 | Attestation letter |
| 9226 | Jirau Hydro Power Plant | Energy industries (renewable - / non-renewable sources) | Brazil | 1,144 | CERs | Cancelamento voluntário realizado pela ENERGIA SUSTENTÁVEL DO BRASIL SA, por meio de seus acionistas: ENGIE Brasil; MITSUI & CO; ELETROBRÁS ELETROSUL; A ELETROBRÁS CHESF em nome do IMM Esporte e Entretenimento, para compensar as emissões de CO2 reportadas no Inventário de GEE (nos Escopos 1, 2 e 3) originado durante o evento ATP 500 RIO OPEN apresentado pela CLARO em 2022, que aconteceu no Jockey Club no Rio de Janeiro, Brasil, de 12 a 20 de fevereiro de 2022. | 15/08/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 554 | CERs | UPMISC2016 – June Sales | 02/08/2021 | Attestation letter |
| 9063 | MACAÚBAS LANDFILL GAS PROJECT |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 531 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 24/02/2022 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 774 | CERs | Cool Effect July 2022 Platform Sales: SOTLANDFILL2019 | 31/08/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 700 | CERs | • Retirement – Beneficiary: Asociación de Servicios Médicos Costarricenses (ASEMECO) • Retirement Reason Details: Cancelación Voluntaria realizada por la Asociación de Servicios Médicos Costarricenses (ASEMECO) para compensar sus emisiones de CO2 equivalente correspondientes al año 2020, como requerimiento para cumplir con su Programa de Carbono Neutralidad. | 14/05/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 35 | CERs | Nordqvist carbon neutral tea products compensation for 2020 | 23/03/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Shri Gauranga Das Director, Govardhan Ecovillage. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Ms. Latha Venkatesh Executive Editor, CNBC-TV 18. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 5446 | CGN Dalian Xizhongdao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 463 | CERs | Operational emissions and customer emissions neutralization by Industrial Bank Co.,Ltd. | 10/12/2021 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 5,557 | CERs | Cool Effect June 2022 Platform Sales: SOTLANDFILL2019 | 03/08/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación de emisiones del II Foro Global de Gobiernos Locales 2019 | 17/09/2019 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 22,003 | CERs | Retirement on behalf of Larnaka International Airport 2019 and 2020 emissions | 14/03/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8 | CERs | Mitigación de la Huella de Carbono de Alexa Ximena Angel Silva | 05/05/2022 | Attestation letter |
| 3773 | Olkaria II Geothermal Expansion Project | Energy industries (renewable - / non-renewable sources) | Kenya | 139 | CERs | Cancellation per request from Aalborg Portland A/S | 03/09/2019 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 242,950 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 19/06/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10 | tCERs | Carbon credits available for voluntary use | 24/02/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 684 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 684 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 684 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 08/08/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Coberturatotal.cr por las emisiones GEI derivadas de su operación durante el año 2019 | 04/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,562 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COOPERATIVA DE TRANSPORTADORES FLOTA NORTE LTDA (NIT 891.800.045-7), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 149 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 149 ton of greenhouse gas (GHG) emissions of the CBO Anita vessel fuel consumption.” “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 149 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Anita.” Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 28/01/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,230 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 2230 tons of CO2 associated with fossil fuels to be used by CONCRETOS ARGOS S.A.S (NIT 860.350.697-4) in order not to cause the national carbon tax | 09/05/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 39 | CERs | Retired for Furthr's subscribers & benefit users in January - March 2022 | 25/04/2022 | Attestation letter |
| 9925 | SHPs Tambaú, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil | Energy industries (renewable - / non-renewable sources) | Brazil | 421 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 421 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 421 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/01/2022 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 92 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 03/07/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 1,312 | CERs | WBG Carbon offset FY2020, PO 1521005 Namakkal Waste to Energy India, cancellation on behalf of IFC | 26/06/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action - TR 11 | 22/12/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 175 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de BCIE para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 30/12/2020 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 6 | CERs | Company Name: OVGO Inc. Address: 101 Faure 5-29-18 Kugayama Suginami-ku, Tokyo 168-0082 President: Ms. Yuki Mizobuchi The reason for retirement is to offset 2020 carbon footprint. | 12/04/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 5 | CERs | Contribución voluntaria llevada a cabo por Anaconda Carbon a favor de PROBIKES EL SALVADOR, para compensar las emisiones de GEI producidas por la realización del evento GRAN FONDO SIVAR en Julio 2022 | 31/05/2022 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 2,345 | CERs | Voluntary cancellation to offset the carbon emissions generated by participants of Seoul E-Prix 2022 (August 14,2022) This activity is initiated and executed by Oe One Earth. Co., Ltd. | 07/06/2022 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 2,345 | CERs | Voluntary cancellation to offset the carbon emissions generated by participants of Seoul E-Prix 2022 (August 13,2022) This activity is initiated and executed by Oe One Earth. Co., Ltd. | 07/06/2022 | Attestation letter |
| 5439 | Wind power project in Jaisalmer, Rajasthan by Centaur Mercantile Pvt. Ltd. | Energy industries (renewable - / non-renewable sources) | India | 24,467 | CERs | Retired on behalf of NAPCO’s CY2021 GHG footprint for Climate Active. | 05/09/2022 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 25,575 | CERs | Retired on behalf of Ubisoft Entertainment. | 16/03/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon removal credits for voluntary climate action - TR 58 | 22/12/2020 | Attestation letter |
| 0165 | ESTRE’s Paulínia Landfill Gas Project (EPLGP) | Waste handling and disposal | Brazil | 200,000 | CERs | Cancelled on behalf of EnergyAustralia's Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 25/03/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,417 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Campinas - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Campinas - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 75,000 | CERs | EXPO DUBAI 2020 LLC-SO | 24/08/2021 | Attestation letter |
| 8500 | SHP ITAGUACU CDM PROJECT (JUN 1146), BRAZIL | Energy industries (renewable - / non-renewable sources) | Brazil | 2 | CERs | Purpose: Neutralização das emissões de carbono referente às operações do Carbon Free Brasil em 2021. Beneficiary: Carbon Free Brasil (CNPJ: 35.305.155/0001-10) | 03/08/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 1,606 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de MARCATEL COM, S.A. de C.V. para compensar las emisiones generadas por la operación de la Torre San Jerónimo para el periodo 2020 | 24/12/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 36 | 22/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,926 | CERs | Retiro a favor de PETROBRAS COLOMBIA COMBUSTIBLES SA identificado con NIT 900047822-5 para neutralización de emisiones de GEI debido al consumo de combustible fósiles TON Co2 generadas 1.926 Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 13/09/2022 | Attestation letter |
| 0085 | Hapugastenne and Hulu Ganga Small Hydropower Projects. | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 10,000 | CERs | Voluntary cancellation on behalf of Natural Capital Partners' client. | 30/11/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2020-0357 | 2020 | 11/11/2020 | Attestation letter |
| 7369 | Wind Power Project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 13,649 | CERs | ‘Retired for Ubisoft Entertainment’ | 16/03/2022 | Attestation letter |
| 0675 | Vinasse Anaerobic Treatment Project - Compañía Licorera de Nicaragua, S. A. (CLNSA) | Waste handling and disposal | Nicaragua | 14,720 | CERs | Voluntary cancellation in order to claim carbon neutrality for the Flor de Caña products sold during 2020. | 21/09/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 2,068 | CERs | Voluntary compensation from Uber Mexico to offset GHG emissions made by Anaconda Carbon | 22/12/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Black & Veatch Hong Kong Limited” for Annual Dinner in 2021 (Transaction ID: 692) | 18/02/2021 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 1,200 | CERs | Retired on behalf of ECOCOPTER - Vuelos CO2 Neutral 2022 - SCX ID 0118-E9217B02 | 13/04/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 685 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaft Regioparkring 14, 41199 Mönchengladbach in 2021-2023 | 22/10/2021 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 1,924 | CERs | Voluntary cancellation of 1,924 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-24 | 25/08/2022 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 254,614 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 13/03/2020 | Attestation letter |
| 1145 | 8.75MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 26,032 | CERs | GMR Hyderabad International Airport Ltd (GHIAL) is responsible for operation, management and development of Rajiv Gandhi International Airport (RGIA),Shamshabad, India. GHIAL is fully committed for climate change mitigation and to ensure sustainable development of RGIA. Since 2012, RGIA has been participating in Airports Council International’s (ACI) Airport Carbon Accreditation Programme for greenhouse gas emissions management. RGIA achieved “Level‐2 : Reduction” in 2012, and Level 3 : Optimization in 2013 under this Programme. In continuation of this journey, GHIAL has aimed towards Level3+: Neutrality by offsetting its scope1 & 2 and scope 3 (employees business travel) emissions. As part of this approach, GHIAL commissioned a 5 MW solar power plant in 2015 and started offsetting of its emissions. And also purchased CERs for offsetting of the residual emissions. Consequently, GMR Hyderabad International Airport Ltd has achieved ACI- Level3+: Neutrality of the Airport Carbon Accreditation (ACA) in 2016. Further, GHIAL needs 26032 certified emission reductions (CERs) for offsetting the residual emissions for the calendar year 2019 towards sustaining the Level3+: Neutrality accreditation. | 14/01/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 227 | CERs | Voluntary cancellation made by CONCESIONARIA VUELA COMPAÑÍA DE AVIACIÓN, S.A.P.I DE C.V. (VOLARIS) during fourth quarter (October-December) of 2019 | 05/05/2020 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 88 | CERs | Voluntary Cancellation of 88 CERs for transaction no. 662 (14 CERs), 669 (04 CERs), 672 (14 CERs), 673 (14 CERs), 677 (14 CERs), 678 (14 CERs) and 679 (14 CERs) on www.clpcarboncredits.com | 16/11/2020 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 296 | CERs | on behalf of GP-27 | 09/08/2022 | Attestation letter |
| 2347 | 150 MW grid connected Wind Power based electricity generation project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 12,000 | CERs | Purpose: “Voluntary cancellation in favor of offsetting GHG emissions of the Asian Development Bank’s Headquarters in Manila, Philippines for 2017” Beneficiary: “Asian Development Bank” | 29/01/2019 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 328 | CERs | Voluntary carbon offset compensation made by Anaconda Carbon on behalf of Uber to mark the launch of the Uber Planet Program for Perú | 21/04/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 31 | 22/12/2020 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 194 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 194 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: June 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 194 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Junho de 2022" Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 08/08/2022 | Attestation letter |
| 2307 | Federal Intertrade Pengyang Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 11,261 | CERs | Cancelled for FZ | 01/11/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 293 | CERs | Retired for SPW's Climate Positive Impact January - March 2022 | 25/04/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 63 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 255 673,00 kms of riders using UberPLANET during February 2021 made by A-CO2 | 09/03/2021 | Attestation letter |
| 0310 | Bundled Wind power project in Jaisalmer (Rajasthan in India) managed by Enercon (India) Ltd. | Energy industries (renewable - / non-renewable sources) | India | 100 | CERs | "Klimaneutrale Weihnachten der Kunden der Stadtwerke Burg 2019." | 18/03/2020 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 3,000 | CERs | Wienerberger GmbH, Germany, is offsetting GHG emissions associated with the production of premium clay brick products at the production site in Eisenberg/Thüringen in the year 2020 | 13/01/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 1,698 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 31/07/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 150 | CERs | Bananos Ecológicos de la Línea Noroeste (BANELINO) Retirement Reason Details: Cancelación Voluntaria realizada por Bananos Ecológicos de la Línea Noroeste (BANELINO) para sus esfuerzos de la carbono compensación por sus emisiones del 1 de enero al 31 de diciembre del año 2017, como requerimiento para cumplir con su Programa de Carbono Neutralidad para las Oficinas y Operación de Banelino. | 07/08/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 16 | CERs | Asociación de Servicios Médicos Costarricenses (ASEMECO) Retirement Reason Details: Cancelación Voluntaria realizada por la Asociación de Servicios Médicos Costarricenses (ASEMECO) para compensar sus emisiones de CO2 equivalente correspondientes al periodo del 1 de enero al 31 de diciembre del año 2018, como requerimiento para cumplir con su Programa de Carbono Neutralidad | 07/08/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 22 | CERs | Compensación voluntaria llevada a cabo por Anaconda Carbon a favor de Mesoamerica Partners MP S.A., para compensar las emisiones GEI generadas (22 tCO2e) por la operación de Mesoamerica Partners MP S.A., Mesoamerica Andino Colombia y Mesoamerica Panamá, durante el periodo del 01 de enero del 2020 al 31 de diciembre del 2020 y cumplir con los requisitos del PPCN | 29/06/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 339 | CERs | These credits were retired on behalf of Fristads AB to compensate for greenhouse gas emissions associated with the production of their Outdoor collection. | 10/02/2021 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 2,000 | CERs | Cancelled for the purposes of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 17/11/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,292 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL SA identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 12/05/2022 | Attestation letter |
| 5781 | Inner Mongolia China Water Group Huade Sandaogou Wind Farm 49.5MW Project | Energy industries (renewable - / non-renewable sources) | China | 125,194 | CERs | Entwertung der CO2-Zertfikate (CP2 CER) für Grüngasprodukte von Eprimo | 27/08/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Nripesh Kumar,Partner Ernst & Young. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 38 | CERs | Offset the GHG emissions from transport of visitors during Shenzhen Creative Week (SZCW) & the 37th Shenzhen International Furniture Exhibition (SIFEChina) | 07/07/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon Removal Credits for Voluntary Climate Action | 22/12/2020 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 150,000 | CERs | These CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. CERs are cancelled from CPA001-007, 104081 from MP3c 2017 vintage & 45919 MP3d 2018 vintage as shown in attached sheet. Calculations extracted from 'ER spreadsheets and survey.zip' file under Additional Documents. | 23/03/2021 | Attestation letter |
| 1291 | Enercon Wind Farms in Karnataka Bundled Project – 30.40 MW | Energy industries (renewable - / non-renewable sources) | India | 60,306 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 1836 | Poechos II hydroelectric plant project | Energy industries (renewable - / non-renewable sources) | Peru | 2,920 | CERs | Purpose of the request: Neutralización de las emisiones de huella de carbono de Hotelera Costa del Pacífico S.A / Swissôtel – Lima, correspondientes al desarrollo de sus actividades durante el año 2018. Neutralization of carbon footprint emissions by Hotelera Costa del Pacífico S.A / Swissôtel – Lima, corresponding to their activities on 2018 Beneficiary of the request: Swissôtel - Lima Av Santo Toribio 173 - Vía Central 150 Centro Empresarial Real San Isidro | Lima 15073 – Perú RUC :20297885538 | 19/08/2019 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 303,923 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 28/09/2020 | Attestation letter |
| 3599 | Bajo Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,203 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA S. A. (NIT 860.002.554-8) for the neutralization of 2,203 tons of CO2 associated with fossil fuels to be used by HOLCIM (COLOMBIA) S.A. (NIT 860.009.808-5) in order not to cause the national carbon tax. | 05/09/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 896 | CERs | On behalf of Santander Consumer U.S.A. I am offsetting the carbon footprint of my organization | 17/12/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 100 | CERs | Compensación voluntaria de emisiones mediante el manejo responsable de residuos de la empresa ESSITY HIGIENE Y SALUD MÉXICO, S.A. de C.V. planta Monterrey (Enero-Marzo 2021) | 02/06/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 238 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 238 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 238 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 04/04/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 3,500 | CERs | These credits were retired on behalf of Childbase Partnership for their 2018/19 Scope 1, 2 and 3 emissions | 14/12/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,052 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 5 041 630,0 kms of riders using UberX during September 2020 made by A-CO2 | 14/10/2020 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 17,251 | CERs | “Retirada permanente de circulação do mercado em nome das Lojas Renner S.A./ Retirement on behalf of Lojas Renner S.A”. | 04/11/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Shuddhoday PMPL . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 500 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ENERGIZAR SAS | 07/09/2022 | Attestation letter |
| 3550 | Wind Power Project by M/s Chhotabhai Jethabhai Patel & Co. (CJP) at Sinnar, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 21,910 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 17,750 | CERs | This voluntary cancellation of CERs was made on behalf of Programa Amigo do Clima. Details provided at www.amigodoclima.com. | 09/12/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 873 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of January 2019 | 11/02/2019 | Attestation letter |
| 10431 | Improved cookstove program in Bangladesh supported by the Republic of Korea | Energy demand | Bangladesh | 684,700 | CERs | The cancellation is for the usage in the Korean Offset Program (in K-ETS) and Ecoeye is the beneficiary of this cancellation. | 12/08/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 62,306 | CERs | Compensation of carbon footprint for year 2020 of Acciona Construcción | 15/04/2021 | Attestation letter |
| 0708 | Huaycoloro landfill gas capture and combustion |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Peru | 361,174 | CERs | ENTREGA DE 361,174 CERS POR PARTE DE "PETRAMAS SAC" PARA LA NEUTRALIZACION DE LA HUELLA DE CARBONO AL "PROYECTO ESPECIAL PARA LA PREPARACIÓN Y DESARROLLO DE LOS XVIII JUEGOS PANAMERICANOS DEL 2019" - "EL PROYECTO LIMA 2019" | 11/09/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,543 | CERs | OFFSET ON BEHALF OF: Banco Santander Argentina SA Huella Banco Santander Argentina | 03/06/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 155 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 155 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 155 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 11/01/2019 | Attestation letter |
| 1428 | Monomeros Nitrous Oxide Abatement Project | Chemical industries | Colombia | 12 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 13/09/2019 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 595 | CERs | Contribute to Climate action and become a carbon neutral company(ROBUS) | 03/08/2022 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 250 | CERs | OFFSET ON BEHALF OF: Gorman-Rupp Europe B.V. REASON FOR COMPENSATION: I am offsetting the carbon footprint of my clients | 31/03/2022 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 40,000 | CERs | Retired on Behalf of Tricorona Climate Partner AB. | 13/01/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 4 | tCERs | COMPENSAÇÃO DE EMISSÕES DA "1a ETAPA MINAS CHAMPIONS LEAGUE - CEPEL / FHMG-2022". DATA DO EVENTO: 11 A 13 DE MARÇO 2022 REALIZAÇÃO: CENTRO DE PREPARACAO EQUESTRE DA LAGOA - CEPEL | 05/04/2022 | Attestation letter |
| 5678 | Wind Power Project by National Enterprises at Tamil Nadu, India | Energy industries (renewable - / non-renewable sources) | India | 3,877 | CERs | “3,877 tonnes of carbon credits retired on behalf of Waverley Council for the purposes of offsetting their greenhouse gas emissions footprint in FY2021-2022” | 20/07/2022 | Attestation letter |
| 10393 | Renewable Power Project by Emami Power Ltd | Energy industries (renewable - / non-renewable sources) | India | 59,503 | CERs | Voluntary cancellation of 59,502 CERs for the purpose of conversion to Gold Standard VERs from project GS5830. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 24/02/2022 | Attestation letter |
| 10268 | Ethiopia – Clean Cooking Energy Program |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
Ethiopia | 20,153 | CERs | CERs that the UK Department for Business, Energy and Industrial Strategy (BEIS) purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated 03-June-2020 | 04/06/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Ms Sushma Chaudhary,Sr. Project Manager Mott Macdonald India Pvt Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 24,029 | CERs | Titular: Santander Bank, N.A. Concepto: Santander Bank carbon footprint offsetting 2020 | 05/11/2020 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 40 | CERs | Retired on behalf of NFT BAZL for their exhibition event in Dubai for Gulf Blockchain Week 2021. | 13/01/2022 | Attestation letter |
| 2347 | 150 MW grid connected Wind Power based electricity generation project in Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 550 | CERs | Purpose:"Voluntary cancellation in favor for offsetting additional GHG emissions of the Asian Development Bank’s Headquarters in Manila, Philippines for 2019" Beneficiary: "Asian Development Bank" | 09/10/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 8 440,0 kms of riders using UberFLASH during July 2020 made by A-CO2 | 10/08/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1,340 | CERs | Sociedad Estatal Correos y Telégrafos, S. A. Correos Compensa | 01/04/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 406 | CERs | Retirement - Beneficiary: DISTRIBUIDORA FLOREX CENTROAMERICANA, SA; Retirement Reason Details: Cancelacion Voluntaria realizada par Distribuidora Florex Centroamericana, S.A. para compensar sus emisiones de C02 equivalente correspondientes al ano 2019. | 23/10/2020 | Attestation letter |
| 5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 20,377 | CERs | Retirement on behalf of Fokus Zukunft GmbH & Co. KG | 11/07/2019 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 1,000 | CERs | For over 250 years hubergroup is a family-owned company with sustainable tradition. To enlarge our activities towards sustainability continuously, we invests in CERs of the innovative social and ecological project from Energeticos Jaremar. hubergroup Deutschland GmbH | 05/08/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 775 | CERs | Retirement Beneficiary: HP Inc Costa Rica Ltda. Retirement Reason: Voluntary cancellation on behalf on HP Inc Costa Rica Ltda. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1 to December 31, 2018. | 25/07/2019 | Attestation letter |
| 1526 | Saldanha Small Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Brazil | 52,911 | CERs | Retirement Y2021-13418 | 06/01/2022 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 2,000 | CERs | Purpose:Retirada permanente de circulação do mercado em nome da GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. referente a neutralização das emissões corporativas de Escopo 2 do ano de 2019 Benefeciary:GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. | 17/11/2020 | Attestation letter |
| 0171 | Caieiras landfill gas emission reduction | Waste handling and disposal | Brazil | 3,854 | CERs | Voluntary Cancellation of 3854 CERs to neutralize the carbon footprint of all the operations of Innova Ambiental S.A., RUC 20302891452, during 2017 in the solid waste management in the city of Lima (Cercado de Lima and Municipalidad de Miraflores) | 26/06/2019 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 18/08/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 22 | CERs | David Abrantes | 21/02/2020 | Attestation letter |
| 0404 | Irani Biomass Electricity Generation Project | Energy industries (renewable - / non-renewable sources) | Brazil | 25,000 | CERs | Purpose: Compensação de emissões do ITAÚ Unibanco S.A. no âmbito do Programa Compromisso com o Clima – atividade/fonte de emissão Atmosférica. Beneficiary: ITAÚ UNIBANCO S.A. | 05/10/2020 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 37,743 | CERs | This certificate represents the retirement of carbon credits equivalent to the carbon emissions generated during the manufacture process of Radar brand of tires from January 2021 to December 2021. | 12/05/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 53 | CERs | This voluntary cancellation of CERs was made on behalf of PMC Automotiva do Brasil / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 3,000 | CERs | Voluntary cancellation of Goldstandard-CDM CERs on behalf of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. | 03/12/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 215 | CERs | Retirement – Beneficiary: VEHÍCULOS INTERNACIONALES (VEINSA) S.A. ; Retirement Reason Details: Cancelación voluntaria hecha por VEHÍCULOS INTERNACIONALES VEINSA S.A. para su estrategia de reducción de emisiones para el Programa de Carbono Neutralidad de Costa Rica de sus emisiones del 1 de enero al 31 de diciembre del 2018 | 20/03/2020 | Attestation letter |
| 6797 | Joburg Landfill Gas to Energy Project | Waste handling and disposal | South Africa | 2,233 | CERs | THE REQUEST FOR VOLUNTARY CANCELLATION IS MADE FOR THE PURPOSES OF UTILISING A CARBON OFFSET IN ACCORDANCE WITH SECTION 13 OF THE SOUTH AFRICAN CARBON TAX ACT AND THE REGULATIONS ON CARBON OFFSETS UNDER SECTION 19 OF THE CARBON TAX ACT, REGULATIONS OF 2019 AS PUBLISHED IN GN 1556 GG 42873 ON 29 NOVEMBER 2019 AND SPECIFYING THE ORGANISATION'S NAME AND CARBON OFFSET ADMINISTRATION SYSTEM ACCOUNT NUMBER INTO WHICH THE OFFSETS MUST BE LISTED | 05/02/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3,400 | CERs | Retirement – Beneficiary: COMPONENTES INTEL DE COSTA RICA S.A. Retirement Reason Details: Voluntary cancellation on behalf of COMPONENTES INTEL DE COSTA RICA S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018 | 04/10/2019 | Attestation letter |
| 9977 | West African Biodigester Programme of Activities | Energy industries (renewable - / non-renewable sources) | Benin, Burkina Faso | 10,656 | CERs | CERs that the UK Department for Business, Energy and Industrial Strategy (BEIS) purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated August 04, 2022. | 22/08/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 275 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis - CMP Contagem. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 48 | CERs | "This voluntary cancellation of CERs was made on behalf of Stellantis Autopeças Jaboatão dos Guararapes. The volume is equivalent to carbon offsetting of verified emissions (scopes 1 and 2 - 2020 reference year). The corporate inventory is available on the Public Emissions Registry platform (GHG Protocol Brazil)." | 29/12/2021 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 426 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by A-CO2 | 14/07/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 70,000 | CERs | ROWE MINERALÖLWERK GMBH | 26/03/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,849 | CERs | Retired on behalf of CHOOOSE | 04/04/2022 | Attestation letter |
| 2199 | 48 MW Duduluo River Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | China | 10,000 | CERs | Retired on behalf of Catom PDM B.V. | 18/03/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1,053 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften der LBBW Immobilien Asset Management GmbH in 2022-2023 | 22/10/2021 | Attestation letter |
| 4759 | Kadamane Mini Hydel Scheme – 2 | Energy industries (renewable - / non-renewable sources) | India | 35,874 | CERs | Retired on behalf of ReNew Energy Global PLC to offset its scope 1 and scope 2 emissions from its operations in FY 2021-22. | 29/08/2022 | Attestation letter |
| 0115 | GHG emission reduction by thermal oxidation of HFC 23 at refrigerant (HCFC-22) manufacturing facility of SRF Ltd | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | India | 273,500 | CERs | To offset the anticipated emissions of Pearl Petroleum Company Limited in Kurdistan Region of Iraq during the year 2022. | 26/04/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 53 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by VEOLIA ASEO TULUA (NIT 821.000.448-4, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 8 | tCERs | Compensação das emissões do evento "Florestas Uai | Encontro da Indústria Florestal de Minas Gerais", realizado nos dias 17 e 18 de agosto de 2022. | 17/08/2022 | Attestation letter |
| 4687 | Zafarana 85 MW Wind Power Plant Project | Energy industries (renewable - / non-renewable sources) | Egypt | 15,000 | CERs | First Climate for Heizoel24, interaid GmbH | 20/10/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 225 | CERs | Voluntary cancellation made by Saint-Gobain México S.A. de C.V., to offset GEI emissions generated from their 2021 operation of its manufacturing plant located in Valle de Santiago, Guanajuato, México, equivalent to 225 tons of carbon | 19/11/2021 | Attestation letter |
| 4992 | 1.5 MW Wind Power Project in Maharashtra by M/s. Allgrow ventures | Energy industries (renewable - / non-renewable sources) | India | 4,000 | CERs | “Retired of behalf of UNIVERSITY OF TECHNOLOGY SYDNEY, ABN 77 257 686 961” | 19/11/2021 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 1,770,935 | CERs | The credits are cancelled for the specific purpose of being used in the South African carbon tax offset scheme. | 18/08/2020 | Attestation letter |
| 6008 | Recovery and Utilization of Associated Gas at Pondok Tengah LPG Plant – PT. Yudistira Energy | Fugitive emissions from fuels (solid, oil and gas) | Indonesia | 19,248 | CERs | ACT Financial Solutions B.V. - TM00182321 | 27/04/2020 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 9 | CERs | Voluntary cancellation of 9 tonnes on behalf of Jerónimo Martins SGPS, S.A. associated with the production and printing of its corporate magazine Feed | 29/06/2020 | Attestation letter |
| 0545 | Durban Landfill-gas-to-electricity project – Mariannhill and La Mercy Landfills | Waste handling and disposal | South Africa | 28,354 | CERs | The request for voluntary cancellation is made for the purpose of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for transfer to eThekwini Municipality's COAS account number 101045 | 30/11/2021 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 13,595 | CERs | CERs cancelled to render EBRD’s operations in 2020 carbon neutral | 14/04/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 408 | CERs | Voluntary cancellation to offset the GHG generated from fossil fuel combustion of Guangzhou Xin Hao Precision Technology Co., Ltd from January 1, 2021 to December 31, 2021. | 20/06/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 8,950 | CERs | Compensation of CO2 Emissions for FrieslandCampina - Heilbronn 2021 | 11/02/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,267 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by COLVANES SAS NIT 800185306-4, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 10/06/2021 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 3 | CERs | Voluntary Cancellation of 3 CERs for Janice Lai for transaction no. 818 on www.clpcarboncredits.com | 25/05/2021 | Attestation letter |
| 4713 | Hunan Zhugaotan Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 93,874 | CERs | Entwertung der CO2-Zertifikate für Grüngasprodukte von Eprimo | 19/11/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 824 | CERs | Voluntary cancellation by GMG International Tendering Co.,Ltd. to offset GHG Emissions (scope 1 and scope 2)generated from its daily operation from Jan 1 2021 to Dec 31 2021 | 25/07/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 2,673 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - FCA Motores Campo Largo under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 3649 | Sungsan Wind Power Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 22,067 | CERs | This cancellation is for usage to offset Ecoeye's carbon emission, and Ecoeye is beneficiary of this cancellation. | 01/12/2020 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 85 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 85 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: April 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 85 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Abril de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 8921 | Shandong Linyi Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 9,553 | CERs | Voluntary cancellation for carbon neutrality for Xiamen Guomao Finance Center Building | 17/10/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 4 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de AGENCIA DATSUN SABANA para la acreditación de Bandera Azul del Punto de Venta Ag. Datsun Alajuela para periodo 2020 | 14/04/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6,607 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - AFS | 12/05/2022 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 58,030 | CERs | retired on behalf of Nordic Leisure Travel Group AB for Scope emissions of 2022/2023 | 26/09/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 1,113 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 1113 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 1113 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 02/05/2019 | Attestation letter |
| 0327 | Lohgarh, Chakbhai and Sidhana Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 30,157 | CERs | Cancelled on behalf of ENGIE SA to offer a reduced carbon product to its B2B customers in France | 02/11/2021 | Attestation letter |
| 7981 | 25.5 MW Wind Energy Farm at Nandurbar Maharashtra by HZL | Energy industries (renewable - / non-renewable sources) | India | 4,000 | CERs | Retired on behalf of DNB ASA | 14/08/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 508 | CERs | Compensación voluntaria realizada por Anaconda Carbón a favor del Conglomerado BNCR para compensar las emisiones GEI generadas durante el periodo 2020 para cumplir con los requisitos del PPCN | 09/05/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 4,975 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON S.A. identificado con NIT 811.026.709-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 22/02/2022 | Attestation letter |
| 0950 | Bio energy in General Deheza –Electricity generation based on peanut hull and sunflower husk | Energy industries (renewable - / non-renewable sources) | Argentina | 9,440 | CERs | Consumo referente al programa Carbón Neutral de Cabify para el año 2021 | 19/07/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 10 | CERs | This voluntary cancellation of CERs was made on behalf of Brose do Brasil / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 121,900 | CERs | This request is submitted to cancel the 121,900 CERs issued from Sihwa Tidal Power Plant CDM Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 11/09/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2,087 | CERs | compensation of Carbon Footprint for year 2020 of Acciona Concesiones | 15/04/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 12 | CERs | Caille | 05/04/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 917 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 917 tons of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” Reference month: May 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 917 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Mês de referência: Maio de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 5,845 | CERs | Retiro a favor de TERPEL S.A identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustible fósiles. TON Co2 generadas 5.845. Titular de la iniciativa: ISAGEN S.A. E.S.P. MC: ACM0002 | 14/10/2022 | Attestation letter |
| 9181 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – India |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
India | 17,030 | CERs | Retirement on behalf of Climate Impact Partners for Customer ID 00080835 | 08/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CEMEX TRANSPORTES (NIT 830.078.000, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 196,907 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 12/04/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 34,821 | CERs | This certificate represents the retirement of carbon credits equivalent to the carbon emissions generated during the manufacture process of Radar brand of tires from January 2021 to December 2021. | 07/04/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 71,565 | CERs | Retired on behalf of Natural Capital Partners’ clients | 07/02/2022 | Attestation letter |
| 3072 | Hunan Yiyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 10,497 | CERs | On behalf of Interstate Gas Supply, Inc. (for IGS Carbon-Neutral Natural Gas customers for 2022) | 25/11/2021 | Attestation letter |
| 0851 | Daegu Bangcheon-Ri Landfill Gas CDM Project | Waste handling and disposal | Republic of Korea | 266,647 | CERs | The amount of 266,647 CERs will be converted to Korean Offset Credit in the Korea Emissions Trading Scheme. | 05/08/2020 | Attestation letter |
| 0499 | Destruction of HFC-23 at refrigerant (HCFC-22) manufacturing facility of Chemplast Sanmar Ltd | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | India | 20,000 | CERs | "Clients of The Carbon Consulting Company " | 24/06/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 20/06/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,904 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 14/05/2019 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 32,152 | CERs | Carbon neutrality of ACT Commodities’ client | 21/02/2019 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 38 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - ISVOR under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 4,080 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 03/07/2019 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 165 | CERs | Purpose: Compensação de emissão de BADUCHI INDUSTRIA E COMERCIO DO VESTUARIO LTDA, localizada em AV TORQUATO SEVERO, 111 Porto Alegre / RS. Beneficiary: BADUCHI INDUSTRIA E COMERCIO DO VESTUARIO LTDA | 19/03/2021 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 430 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 430 tons of greenhouse gas (GHG) emissions of the CBO WISER vessel fuel consumption.” Reference month: June 2023 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 430 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO WISER.” Mês de referência: Junho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 08/08/2022 | Attestation letter |
| 7997 | BioLite Improved Cook stoves Programme | Energy demand | India, Kenya, Uganda | 112,613 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 17/12/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 3,000 | CERs | Retirement – Beneficiary: Anaconda Carbon S. A.; Retirement Reason Details: Cancelación Voluntaria hecha por Anaconda Carbon a favor del Conglomerado Banco Nacional de Costa Rica para compensar las emisiones GEI generadas durante el año 2018 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático | 30/04/2020 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 641 | CERs | Voluntary cancellation to offset the GHG (Estimated) generated from Bank of Kunlun CO.,LTD. Karamay Branch Banking Dept. from June 6, 2022 to June 5, 2025. | 20/06/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 649 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 649 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 649 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 19/12/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action - TR 7 | 22/12/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Lovish Ahuja,Group Head - Sustainability GHCL Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 31,500 | CERs | Gasversorgung Görlitz GmbH – CO2 neutrales Erdgas | 22/10/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 5 | CERs | Le Pal | 10/03/2022 | Attestation letter |
| 7434 | Wind Power Project in Karnataka India | Energy industries (renewable - / non-renewable sources) | India | 1,165 | CERs | "Retired by PNZ2050 on behalf of one of its clients." | 10/03/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 388 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES ALVAREZ (NIT 830.126.659, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 365 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSTECOL S.A.S (NIT 804.004.470-3, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 72 | CERs | Voluntary cancellation by Zhengding Sub Branch of Bank of Hebei Co.Ltd to offset the GHG Emissions generated by the daily operation of its Zhengding Sub Branch of Bank of Hebei in 2021 | 31/05/2022 | Attestation letter |
| 2475 | LG Chem Naju plant fuel switching project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 33,978 | CERs | We are requesting Voluntary cancellation of total CERs in order to switch them into KOC(Korea Offset Credits) by submitting an attestation letter to Korea government under Korea ETS. | 08/05/2020 | Attestation letter |
| 8500 | SHP ITAGUACU CDM PROJECT (JUN 1146), BRAZIL | Energy industries (renewable - / non-renewable sources) | Brazil | 517 | CERs | Purpose: Neutralização das emissões de carbono referentes a produção das embalagens da linha Tío Nacho de maio de 2022 a abril de 2023. Beneficiary: Genomma Laboratories do Brasil - CNPJ (opcional): 09.080.907/0001-82 | 04/05/2022 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 2,888 | CERs | “Retired on behalf of Concha y Toro - Neutralización SUNRISE 2021 - SCX ID 0035-E0102A17” | 05/08/2022 | Attestation letter |
| 3558 | Small-Scale Hydropower Project Sahanivotry in Madagascar | Energy industries (renewable - / non-renewable sources) | Madagascar | 40,568 | CERs | MANE Group 2020 / carbon footprint offsetting | 14/01/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 1,461 | CERs | To Neutralize the Carbon Emission generated by Huasheng Furniture Manufacture Co., LTD. in 2020 | 14/01/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,040 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by GLP COLOMBIA S.A.S (NIT 900.938.268-8, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 4,922 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON S.A identificado con NIT 811026709-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 12/05/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 3 | CERs | Voluntary Cancellation of 3 CERs for Janice Lai (transaction no. 820 on www.clpcarboncredits.com) | 26/05/2021 | Attestation letter |
| 10524 | 70MW Solar Power Plant Project in Ba Ria - Vung Tau, Vietnam | Energy industries (renewable - / non-renewable sources) | Viet Nam | 48,868 | CERs | The canceled CER will be used as a Korean Offset Credits(KOC) in Korean Offset Program. SH Power Co.,Ltd. is beneficiary of this cancellation. | 29/06/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 598 | CERs | Voluntary cancellation in favor of Distribuidora Andina de Combustibles S.A (NIT 860002554-8) for neutralization of the GHG emissions associated with fossil fuels used by CEMEX COLOMBIA S.A (NIT 860002523-1), in order to not cause the national carbon tax. | 13/12/2018 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 12 | CERs | Voluntary compensation made by Anaconda Carbon on behalf of Green Earth Gardens Carbon,Capture Storage Theme Park, to offset for Platescrape all GHG emissions generated from the packing and delivery of 12 units to Costa Rica. | 20/08/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Navid Talib,Plant Operations Head (Manufacturing, Quality, Engineering & Development functions ) Honda Cars India Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 2 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00077088 | 30/09/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 475 | CERs | Voluntary cancellation in favour of Chevron Petroleum Company (NIT 860005223-9) for the neutralization of the GHG emissions, to be used by EasyFly (NIT 900088915-7), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 4144 | GEI Wind Power Project in Karnataka, India | Energy industries (renewable - / non-renewable sources) | India | 317,160 | CERs | Retired of behalf of FZ | 21/09/2021 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 147,076 | CERs | Voluntary Cancellation of CERs made by Lages Bioenergética, owned by ENGIE Brasil Energia, on behalf of AMBEV S.A. and its Units, to offset CO2 emissions related to the GHG Emissions from 2021. This Certificate is part of the total 206.087 tCO2e covering the following entities (Unit Name and CNPJ): F. Sta. Catarina (07.526.557/0029-00), F. Jaguariuna (07.526.557/0005-33), F. Pernambuco (07.526.557/0021-53), F. Aquiraz (07.526.557/0008-86), F. Camacari (07.526.557/0015-05), F. Teresina (07.526.557/0018-58), F. Cebrasa (07.526.557/0010-09), F. Curitibana (07.526.557/0034-78), F. Rio Janeiro (07.526.557/0046-01), F. Nova Minas (07.526.557/0049-54), F. Jundiai (07.526.557/0053-30), F. Ag. Claras Sul (07.526.557/0040-16), F. Jacareí (07.526.557/0006-14), F. Sapucaia (07.526.557/0039-82), F. Contagem (07.526.557/0051-79), F. Guarulhos (07.526.557/0054-11), F. A. Claras (07.526.557/0012-62), F. Minas (07.526.557/0050-98), F. Agudos (07.526.557/0052-50), F. N. Paraná (07.526.557/0027-49), F. Ccl Pirai (07.526.557/0063-02), F. Uberlandia (33.719.311/0002-45), C. Cachoeiro Macacu (07.526.557/0068-17), C. Wals (01.131.570/0005-07), F. Bohemia (07.526.557/0043-69), Malt Passo Fundo (07.526.557/0042-88), Label SP (07.526.557/0055-00) and Latas Minas (07.526.557/0103-34). | 21/05/2021 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 8,250 | CERs | Huella Cabify 2020 | 05/03/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 53 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 216 380,00 kms of riders using UberPLANET during September 2021 made by Anaconda Carbon. | 05/11/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8 | CERs | Mitigación de la Huella de Carbono de German Caballero | 09/06/2022 | Attestation letter |
| 7093 | Los Cocos Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 147,037 | CERs | Towards Delta’s 2020 CN goal | 08/06/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 3,995 | tCERs | Compensação das emissões de GEE (gases de efeito estufa) provenientes das operações de despacho B2B e B2C no ano de 2021 da Essity. Offsetting of GHG emissions (greenhouse gases) generated by the B2B and B2C dispatch operations of Essity in 2021. | 15/09/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 100 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL S.A identificado con NIT 830.095.213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ORGANIZACIÓN TERPEL S.A | 07/09/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 43 | CERs | MV3603 | 2020 | 16/12/2020 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 50,000 | CERs | “Voluntary cancellation of 50,000 tCO2e on behalf of Carbon Neutral Britain Ltd” | 20/12/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5,222 | CERs | Compensation of carbon footprint for year 2018 of Acciona Concesiones | 11/06/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 22,388 | CERs | Compensation of carbon footprint for year 2018 of Acciona Service | 11/06/2019 | Attestation letter |
| 2712 | Humbo Ethiopia Assisted Natural Regeneration Project | Afforestation and reforestation | Ethiopia | 36,650 | tCERs | Voluntary cancellation of tCERs to transition project from CDM to Gold Standard Impact Registry | 12/03/2020 | Attestation letter |
| 1052 | Chacabuquito Hydroelectric Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 5,054 | CERs | BP Technology Ventures Limited requested IBRD as Trustee of the Carbon Funds to cancel all emission reductions resulting from its participation in Chile Chacabuquito Project (CDM Ref# 1052) per instructions in Cancellation Letter dated 14/01/2021. | 03/02/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 119,009 | CERs | Voluntary cancellation in favor of PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) for the neutralization of 119,009 tons of CO2 associated with fossil fuels to be used by PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 8606 | Wind Power Project at Vaspet, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 127,801 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard | 10/02/2021 | Attestation letter |
| 7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | Energy industries (renewable - / non-renewable sources) | Madagascar, Ethiopia, Kenya, Malawi, Mozambique, Nigeria, Uganda, Zambia, Chad, Dominican Republic, Côte d`Ivoire, Liberia, Rwanda, Sierra Leone, Namibia, Zimbabwe, Ghana, South Africa, Somalia | 5,251 | CERs | This cancellation is for usage in the Korea offset programme (in K-ETS) and Ecoeye is beneficiary for this cancellation. | 28/02/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 770 | CERs | Compensation of carbon footprint for year 2019 of Acciona Inmobiliaria | 18/05/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir TAM Wing Shing” for Annual Dinner in 2021 (Transaction ID: 714) | 18/02/2021 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 95 | CERs | Retired on behalf of Lluch Essence S.L.U. | Reason: I am offsetting the carbon footprint of my direct emissions (scope 1), energy consumption (scope 2) and business travel (scope 3). | 20/04/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,499 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Hortolândia - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Hortolândia - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 532 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Maracanaú - Ceará, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Maracanaú - Ceará by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | Visita de integrantes da equipe da DOW para conhecer as operações do Grupo Plantar. | 14/10/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,523 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 1523 tons of CO2 associated with fossil fuels to be used by CONCRETOS ARGOS (Nit 860.350.697-4) in order not to cause the national carbon tax | 15/09/2022 | Attestation letter |
| 5238 | Luohe MSW Landfill Site LFG Recovery to Power Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
China | 37,350 | CERs | Retirement on behalf of Fokus Zukunft GmbH & Co. KG | 19/06/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 903 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by GRUPO EMPRESARIAL METROCARIBE S.A (NIT 802.021.369-1), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 41 | CERs | Compensación voluntaria a favor de INDUSTRIAS PANAMA BOSTON, S.A. por la neutralización de 41tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 16,237 | CERs | Cancelación voluntaria a favor de FRONTERA ENERGY COLOMBIA CORP (NIT-830126302-2) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 19/03/2021 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 15,000 | CERs | CO2-Kompensation der Electris- Energieprodukte und Unternehmensemissionen ab 2022 ff. | 06/10/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 3,000 | tCERs | Carbon credits available for voluntary uses - TR 48 | 22/12/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 403 | CERs | Retired on behalf of CarbonClick and Centrality for the purpose of tokenising under CO2 (1001) on CENNZnet Azulea. | 29/09/2021 | Attestation letter |
| 3531 | Adavikanda, Kuruwita Division Mini Hydro Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 4,702 | CERs | Voluntary cancellation made by Environmental Strategy Advisory Division, Mitsubishi UFJ Morgan Stanley Securities Co. Ltd.; offsetting the carbon emissions attributable to its business operation. | 22/05/2020 | Attestation letter |
| 10584 | Associated Gas Recovery and Utilization at Khamilah oil field area at Block-27 in Wilayat lbri of the Sultanate of Oman | Fugitive emissions from fuels (solid, oil and gas) | Oman | 264 | CERs | Cancelled for Shell UK LTD to submit to UK DfT for UER certificate | 19/07/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 125,000 | CERs | On behalf of Lenovo CO2 Compensated Program | 18/11/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 16 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 70 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de febrero 2022. | 24/05/2022 | Attestation letter |
| 3611 | Roaring 40’s Wind Farms (Khandke) Private Limited – Phase III | Energy industries (renewable - / non-renewable sources) | India | 8,164 | CERs | Carbon offset for CLP Group’s Business Travel in 2019 | 05/08/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3,227 | CERs | Beneficiary: Blue Banana Purpose: Offsetting double the tones of carbon emitted during the production of the Autumn/Winter Collection of 2021 | 30/09/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 107 | CERs | This voluntary cancellation of CERs was made on behalf of Pirelli Pneus / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 5,935 | CERs | Retired on behalf of ESL Gaming GmbH, Schanzenstr. 23 D-51063 Köln | 11/11/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 337 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de MOOG MEDICAL DEVICES GROUP para compensar las emisiones GEI generadas durante el periodo 2020 y cumplir con los requisitos del PPCN | 20/08/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 210 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Cooperativa de Ahorro y Crédito Ande No. 1 R.L. para compensar las emisiones GEI generadas durante el año 2020 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 20/08/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 33 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by VEOLIA ASEO BUGA (NIT 815.000.649-6, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Retirement- Beneficiary: Anaconda Carbon Retirement reason details: Voluntary cancellation made by Anaconda Carbon S.A. to offset all GHG emissions from our carbon offset retail personal vehicle program during the month of October/November 2019 | 28/10/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 623 | CERs | Voluntary cancellation made by Anaconda Carbon S.A. on behalf of Agrícola El Cántaro S.A (Finca y Beneficio de Café Santa Anita) to offset emissions generated by the company Operations during the year of 2020. | 18/11/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 11/03/2021 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Sundeep Gupta, Convenor, CII WUP Core Group on Sustainability & Vice Chairman & Managing Director Jakson Group. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 6,178 | CERs | Retirada para compensacao dos escopos 1, 2 e 3 do Inventario de Emissoes da Central Sicredi Sul Sudeste e suas respectivas Cooperativas Afiliadas, referente aos anos de 2021 e 2022. | 28/09/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10 | tCERs | P4C - People For Climate Initiative | 30/12/2020 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 310 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL (NIT 830.095.213-0) for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA NIT 899.999.094-1. | 12/10/2021 | Attestation letter |
| 2199 | 48 MW Duduluo River Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | China | 131,615 | CERs | Netjets - Transportes Aéreos, S.A.´s redemption for the compensation of 2021 emissions | 23/03/2022 | Attestation letter |
| 3455 | BRASCARBON Methane Recovery Project BCA-BRA-05, Brazil | Waste handling and disposal | Brazil | 116,031 | CERs | Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 25/05/2021 | Attestation letter |
| 10404 | Solar Power Project by Fortum FinnSurya Energy Pvt Ltd | Energy industries (renewable - / non-renewable sources) | India | 10,000 | CERs | Voluntary cancellation of 10,000 CERs for the purpose of conversion to Gold Standard VERs from project GS5523. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 25/11/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,621 | CERs | Voluntary cancellation of CERs was made on behalf of Armazém Mopar Hortolândia under Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 11/09/2019 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 25,908 | CERs | Certificados de cancelación de Toneladas de CO2 por parte de Brembo Mexico S.A. de C.V. | 13/02/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Not shared | 15/04/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 111 | CERs | I am offsetting my organization's greenhouse gas emissions | 29/05/2019 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 124 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Paulinia - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Datacenter Paulinia - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 426 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by CEMEX TRANSPORTES DE COLOMBIA SA, NIT 830078000-0,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 4 | CERs | Voluntary cancellation of 4 CERs to offset the emissions of the United Nations Framework Convention of Climate Change event “Validación de Resultados del Proyecto “CI-ACA República Dominicana” which took place the 22nd of November of 2018 in Santo Domingo, Dominican Republic. | 05/12/2018 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 88,850 | CERs | Voluntary cancellation to offset scope 1 emissions from shipping operations. | 04/01/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,199 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 14/05/2019 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 691 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 3 308 850,00 kms of riders using UberX during June 2021 made by Anaconda Carbon. | 26/07/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir LIU Chun San, JP” for Annual Dinner in 2021 (Transaction ID: 733) | 22/02/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 958 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by GRUPO EMPRESARIAL METROCARIBE S.A (NIT 802.021.369-1), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 13 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 48 866,0 kms of riders using UberCOMFORT during November 2020 made by A-CO2 | 14/12/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 199,997 | CERs | "2019-1552 | 2020" | 26/10/2020 | Attestation letter |
| 9981 | Domestic Cooking Stoves substitution programme in Mozambique | Energy demand | Mozambique | 7,999 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 05/05/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Sohrab Sitaram Co - Founder & Director, Keventers. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 588 | CERs | Sociedad Estatal Correos y Telégrafos, S.A., en concepto del Proyecto Correos Compensa | 10/01/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Dr. Bhimaraya Metri Director IIM Trichy. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 2,892 | CERs | Beneficiary: Ecocert Purpose: Compensation of carbon footprint | 08/09/2021 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 2,398 | CERs | on behalf of GP-21 | 09/08/2022 | Attestation letter |
| 1428 | Monomeros Nitrous Oxide Abatement Project | Chemical industries | Colombia | 189,000 | CERs | Voluntary cancellation in favour of PUMA ENERGY COLOMBIA COMBUSTIBLES S.A.S (NIT 900.497.906-5) for the neutralization of the GHG emissions associated with the fossil fuil in order to not cause the national carbon tax according to Dec. 926 de 2017. | 13/09/2019 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 131,696 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 20/10/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 13,532 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 21/01/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 3,881 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 04/06/2019 | Attestation letter |
| 9154 | Wind Power Project at Jath, Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 263,957 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 14/09/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 380 | CERs | Voluntary cancellation by Hebei Huangjinzhai Tourism Development Co. Ltd to offset the GHG Emissions generated by the daily operation of its Huangjinzhai Ecological Tourism Scenic Area in 2021 | 07/04/2022 | Attestation letter |
| 2341 | Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Cañaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia | Waste handling and disposal | Colombia | 2,083 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 10/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 8,899 | CERs | Retirement – Beneficiary: Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079094) Retirement Reason: Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079094) | 17/08/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 11,101 | CERs | Retirement – Beneficiary: Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079094) Retirement Reason: Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079094) | 17/08/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5,863 | CERs | Retirement – Beneficiary: Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079919) Retirement Reason: Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079919) | 17/08/2021 | Attestation letter |
| 8344 | Hebei Wuqiao Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 5 | CERs | Retired on behalf of Carbonstop(Beijing) Tech Co.,Ltd for 2022 Global Carbon Management Conference | 20/09/2022 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1,000 | CERs | OFFSET ON BEHALF OF: Sustainable Planet Holdings Ltd REASON FOR COMPENSATION: I am offsetting the carbon footprint of my clients | 06/05/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 14,996 | CERs | 2018-0892 | 2020 | 09/11/2020 | Attestation letter |
| 4219 | Blue Fire Bio wastewater treatment and biogas utilization project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Thailand | 800 | CERs | - | 29/07/2022 | Attestation letter |
| 6042 | CDM Project SHP Santa Carolina | Energy industries (renewable - / non-renewable sources) | Brazil | 33,036 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients. | 08/02/2022 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 28,799 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 03/12/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 36,097 | CERs | Titular: Santander Facility Management España, S.L. Concepto: Compensación huella de carbono Banco Santander 2020 | 05/11/2020 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 11,163 | CERs | CERs cancelled to render EBRD’s operations in 2019 carbon neutral | 14/02/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 168 | CERs | Voluntary Cancellation of 168 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during the first quarter (January - March) of 2019. | 18/02/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 105 | CERs | Voluntary cancellation on behalf of SERVICIOS DE VIAJEROS SUIZA S.A. for its Greenhouse Gas (GHG)management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2020. | 20/06/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 2,507 | CERs | “Yeti Airlines Pvt. Ltd. is offsetting the total Green House Gases emitted from it’s aircraft, vehicles, facilities etc. in 2018 to participate in the protection of our environment by becoming a Carbon Neutral airline. We hope to provide a clear path towards a new sustainable vision for the aviation sector in Nepal.” | 21/02/2019 | Attestation letter |
| 1657 | Laiwu Iron & Steel Group Laigang Inc. 25MW Waste Gas Power Generation Project | Energy industries (renewable - / non-renewable sources) | China | 34,584 | CERs | Offsets were cancelled on behalf of Fly Victor's climate strategy in 2022. | 13/04/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 9 | CERs | Year 2020 Emissions Offset for the P. Rajesh Ship Breaking Pvt. Ltd. | 23/08/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 78 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by IMBOCAR SA NIT 800185397-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 5584 | Cerro de Hula Wind Project | Energy industries (renewable - / non-renewable sources) | Honduras | 365 | CERs | Cancelación Voluntaria realizada por Fábrica de Harinas de Centroamérica, S.A., Costa Rica | 19/08/2022 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 210 | CERs | Festival International du Film | 05/04/2022 | Attestation letter |
| 9925 | SHPs Tambaú, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil | Energy industries (renewable - / non-renewable sources) | Brazil | 148 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 148 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” “A CBO Holding S.A. (“Companhia”), CNPJ/MF nº 14.882.295/0001-81, neutralizou 148 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/11/2021 | Attestation letter |
| 4693 | 2.10 MW Wind Power Project by M/s Chhotabhai Jethabhai Patel & Co. (CJP) at Belwa Ranaji Village, Shergarh Taluka, Jodhpur District, Rajasthan, India | Energy industries (renewable - / non-renewable sources) | India | 21,561 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 27,910 | CERs | Voluntary cancellation of 27,910 CERs conducted by Siemens Gamesa Renewable Energy S.A. on behalf of Bii Nee Stipa to offset the company’s Scope 1 and Scope 2 CO2 emissions from fiscal year 2020, representing the period between October 1, 2019 and September 30, 2020 | 04/11/2020 | Attestation letter |
| 1411 | La Cascada 2.3 MW Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 25,233 | CERs | Voluntary cancellation in favour of ZEUSS PETROLEUM S.A (NIT 811.043.174-1) for the neutralization of the GHG emissions associated with the fossil fules in order to not cause the national carbon tax according to Dec. 926 de 2017. | 22/11/2018 | Attestation letter |
| 1993 | Siam Quality Starch Wastewater Treatment and Energy Generation Project in Chaiyaphum, Thailand |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Thailand | 32,746 | CERs | On behalf of WeNow’s customers | 22/11/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 87,018 | CERs | CHEVRON PETROLEUM COMPANY, identificada con NIT 860.005.223-9 ha neutralizado la cantidad de 87.018 toneladas de CO2 a favor de CHEVRON PETROLEUM COMPANY, identificada con NIT 860.005.223-9 en cumplimiento a lo dispuesto en el Decreto 926 de 2017. | 22/11/2018 | Attestation letter |
| 2819 | 50.4 MW Tata Wind Farm - in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 2,227 | CERs | Purpose: Voluntary cancellation in favor for offsetting GHG emissions of the Asian Development Bank’s 2018 Annual Meeting held at the ADB Headquarters Manila, Philippines Beneficiary: Asian Development Bank | 20/11/2018 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 10,000 | CERs | PURPOSE: Retired by South Pole Australia Pty Ltd on behalf of Global Fashion Group S.A. , BENEFICIARY: Global Fashion Group S.A. | 02/06/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 892 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Coltugs (NIT 900485260-4), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 39,909 | CERs | Retiro a favor de REFINERÍA DE CARTAGENA S.A.S. identificado con NIT 900112515-7 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 17/02/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1,224 | CERs | May platform 2021 sales. | 29/06/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1,284 | CERs | OFFSET ON BEHALF OF: Blue Banana Brand S.L. REASON FOR COMPENSATION: SPRING / SUMMER COLLECTION 2022 | 06/05/2022 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 20,000 | CERs | Retired to meet Tango Energy CY 2020 Climate Active requirements | 06/10/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 760 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by COLVANES SAS NIT 800185306-4, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 20,000 | CERs | Retired on be half of MAIN Energie B.V.: Environmental Benefit for consumption 2021 | 02/03/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 4,537 | CERs | Retirement – Beneficiary: Anaconda Carbon Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 21.731.691,30 kms of riders using UberX during December 2019 made by A-CO2 | 07/01/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 97 | CERs | Retirement – Beneficiary: Anaconda Carbon Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 379.717,00 kms of riders using UberCOMFORT during December 2019 made by A-CO2 | 07/01/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 401 | CERs | Retirement – Beneficiary: Anaconda Carbon Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 1.600.500,60 kms of riders using UberECO during December 2019 made by A-CO2 | 07/01/2020 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 1 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 1 ton of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: April 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 1 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Abril de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 365 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES JOALCO S.A (NIT 860.450.987-4), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 341 | CERs | Celicioso. Offsetting double the tonnes of carbon emitted during 2020 | 12/04/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 282 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 282 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” Reference month: March 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 282 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Mês de referência: Março de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 14/04/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Saurabh Kumar,Managing Director Energy Efficiency Services Limited (EESL). EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 3064 | Wuhe Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 12,000 | CERs | Tyczka Energy GmbH | 28/12/2021 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 11,356 | CERs | Cancelled to neutralize the Carbon Emissions generated by SPH Zhongxi Pharmaceutical Co.,Ltd. in 2021 | 08/08/2022 | Attestation letter |
| 10404 | Solar Power Project by Fortum FinnSurya Energy Pvt Ltd | Energy industries (renewable - / non-renewable sources) | India | 50,000 | CERs | Voluntary cancellation of 50000 GS CERs for the purpose of conversion to Gold Standard VERs from project GS5523. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 17/05/2021 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 142 | CERs | Voluntary cancellation of 142 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-26 | 25/02/2022 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 25,899 | CERs | Not shared | 24/07/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,500 | CERs | On behalf of CHOOOSE | 09/01/2020 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 263,815 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 15/03/2019 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 433 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 433 tons of greenhouse gas (GHG) emissions of the CBO VITORIA vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 433 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO VITORIA.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 41 | CERs | "Carbon offsets due to 2022 E & C Conference" Acciona Generación Renovable | 04/05/2022 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 1 | CERs | Voluntary cancellation on behalf of Hanergy Thin Film Power EME B.V. | 14/12/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 337 | CERs | Retired on behalf of CarbonClick and Centrality for the purpose of tokenising under CO2 (1001) on CENNZnet Azulea | 13/07/2021 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 7,574 | CERs | Retired on behalf of BlackBerry Limited for the period of FY2022. | 25/10/2021 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5,000 | CERs | Carbon neutral operations in calendar year 2021 | 23/02/2021 | Attestation letter |
| 3599 | Bajo Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 50,000 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 50,000 tons of CO2 associated with fossil fuels to be used by LATAM AIRLINES COLOMBIA S.A. (NIT 890.704.196-6) in order not to cause the national carbon tax. | 05/09/2019 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 147 | CERs | Purpose: “Compensação do dobro das emissões de GEE do Escopo 1 e 2 (GHG Protocol) das operações da GranIHC – Base Macaé – Ano 2021 - Offset twice the emissions of GHG of scopes 1 and 2 (GHG Protocol) caused by the GranIHC operations in Macaé - 2021 year” Beneficiary: GranIHC - BASE MACAÉ | 23/03/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,550 | CERs | This voluntary cancellation of CERs was made on behalf of "Enel Distribuição São Paulo (Eletropaulo Metropolitana Eletricidade de São Paulo S.A.)" under Programa Amigo do Clima to offset their 2019 Greenhouse Gas emissions. Details provided at www.amigodoclima.com. | 21/01/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 91,142 | CERs | Compensation of carbon footprint for year 2018 of Acciona Construcción | 12/06/2019 | Attestation letter |
| 1948 | Moldova Soil Conservation Project | Afforestation and reforestation | Republic of Moldova | 111,049 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 17/12/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 84,728 | CERs | Cancelación a favor de Petróleos del Milenio (NIT 819.001.667-8) para la neutralización de las emisiones de GEI asociadas a los combustibles fósiles para no causar el impuesto nacional al carbono según el Dec. 926 de 2017 | 24/10/2022 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 143 | CERs | Voluntary cancellation to offset the GHG (estimated) generated from renovation and operation of Guangdong Sihui Rural Commercial Bank Company Limited Dasha Sub-Branch from April 18, 2022 to December 31, 2023. | 06/05/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 556 | CERs | Bangalore International Airport Ltd., (BIAL) is responsible for operation, management and development of Kempegowda International Airport, Bengaluru(KIAB), Devanahalli, Karnataka State, India. BIAL is fully committed for climate change mitigation and to ensure sustainable development of KIAB. Since 2011, BIAL has been participating in Airport Council International’s (ACI) Airport Carbon Accreditation Program for greenhouse gas emissions management. KIAB achieved “Level-2 : Reduction” in 2012 and “Level 3 : Optimization” in 2013 under this Program. KIAB achieved the accreditation level “Level-3+ : Carbon Neutrality” in 2017 and continue and sustain Level 3+ by offsetting its Scope 1, Scope 2 and Scope 3 (staff business travel) emissions for the year 2020, by purchasing 555.8 Certified Emission Reductions (equivalent to 555.8 tons of CO2). | 06/07/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 63,889 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Construcción(excl.Oceanía)+Ingeniería+AMISA | 12/05/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 65 | CERs | Enabling everyday climate action through Doconomy | 01/06/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,040 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by MINSANTO S.A.S (NIT 901.139.502, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,997 | CERs | 2019-1282 | 2020 | 11/11/2020 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 298,977 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 17/12/2018 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5,020 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 24,048.001 kms of riders using UberX during January 2020 made by A-CO2 | 12/02/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 10,997 | CERs | 2018-0475 | 2020 | 09/11/2020 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 3,248 | CERs | Beneficiary: ECOCERT, S.A. Purpose: Compensation of Carbon Footprint | 24/11/2020 | Attestation letter |
| 4413 | Beijing Guanting Wind Power Project Phase II and Phase II addition | Energy industries (renewable - / non-renewable sources) | China | 7,436 | CERs | Beneficiary: Jingneng Zhangbei Dahulun 75MW Wind power Project Purpose: offset the GHG generated directly and/or indirectly from "Jingneng Zhangbei Dahulun 75MW Wind power Project", including the upstream emissions and the construction process emissions. | 12/07/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 3,796 | CERs | UPMISC2016 – July Sales | 30/08/2021 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 3,977 | CERs | Retired for Cool Effect on behalf of Williams College | 24/05/2022 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 1 | tCERs | Retired for Food Entrepreneur Show | 31/01/2020 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 26,211 | CERs | Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00077540) | 08/03/2021 | Attestation letter |
| 5257 | Combined cycle natural gas based grid connected power plant at Jegurupadu, India | Energy industries (renewable - / non-renewable sources) | India | 640 | CERs | For Bansal Ship Recyclers LLP Plot no.39, SRY, Alang, Bhavnagar, Gujarat-364081 (India) Reason to offset - I am offsetting greenhouse gas emissions for my company Year- 2020-2022 | 20/05/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 19 | CERs | Nordqvist carbon neutral tea products compensation for 2019 | 29/01/2020 | Attestation letter |
| 4451 | Ningxia Hongsipu Phase II 49.5MW Wind-farm Project | Energy industries (renewable - / non-renewable sources) | China | 1,296 | CERs | On behalf of Lenovo Clients 1 September 2022, Program Managed by Lenovo. | 06/09/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 73,269 | CERs | Compensation of carbon footprint for year 2019 of Acciona Construcción | 18/05/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 9 | CERs | Espectáculo Bicentenario del Museo del Prado 2019 | 03/04/2020 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 1,450 | CERs | CERs cancelled to render EBRD’s operations in 2018 carbon neutral | 11/02/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 226 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by UNIGAS COLOMBIA SA ESP NIT 830064700-3, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 10584 | Associated Gas Recovery and Utilization at Khamilah oil field area at Block-27 in Wilayat lbri of the Sultanate of Oman | Fugitive emissions from fuels (solid, oil and gas) | Oman | 139,000 | CERs | Cancelled for Shell UK LTD to submit to UK DfT for UER certificate | 08/03/2021 | Attestation letter |
| 4140 | Shenmu County Hengsheng Coal Chemical Co., Ltd. 30MW Semi-coke Waste Gas Power Generation Project |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 20,000 | CERs | Cancelled on behalf of iOffset clients. | 20/12/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1,098 | CERs | Retired on behalf of Cool Effect for the month of February 2021. | 29/03/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 217 | CERs | Voluntary cancellation in favour of Chevron Petroleum Company (NIT 860005223-9) for the neutralization of the GHG emissions, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 168 | CERs | Voluntary cancellation in favor of PETROBRAS COLOMBIA COMBUSTIBLES SA; NIT 900047822-5 for neutralization of the GHG emissions, to be used by CORONA - DESPACHADORA INTERNACIONAL DE COLOMBIA SAS NIT 860068121-6, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 26 | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 17 | CERs | 35 edición Premio de Pintura BMW | 05/02/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 101 | CERs | COMPRADO EN NOMBRE DE Cepsa Comercial Petróleo, S.A. MOTIVO DE LA COMPENSACIÓN I am offsetting the carbon footprint of my direct emissions (Scope 1) | 10/02/2022 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 4,342 | CERs | Cancelación voluntaria en favor de Genomma Lab Internacional para compensar sus emisiones por la producción del empaque de la línea capilar de Tío Nacho Sustentable, junio 2022-junio 2023. Voluntary cancellation in favor of Genomma Lab Internacional to offset its emissions from the production of the packaging for the Tío Nacho Sustentable hair line, June 2022-June 2023. | 04/07/2022 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 41,595 | CERs | “Retired on behalf of HANWHA ENERGY RETAIL AUSTRALIA PTY LTD trading as NECTR for FY21/22 and FY22/23 Climate Active certification” | 10/02/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 64 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - FCA Saúde under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 136 | CERs | Retired on behalf of YourHodler for their tesla giveaway promotiion. | 13/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 9,997 | CERs | 2019-0910 | 2020 | 09/11/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1 | CERs | CLINICA CREATIVA REASON FOR COMPENSATION I am offsetting the carbon footprint of my company's freight transport | 17/03/2022 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 1,878 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by Anaconda Carbon | 28/09/2022 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 32,968 | CERs | on behalf of GP-28 | 09/08/2022 | Attestation letter |
| 3649 | Sungsan Wind Power Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 9,312 | CERs | The amount of 9,312 CERs will be converted to Korean Offset Credit in the Korea Emissions Trading Scheme. | 12/03/2020 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 45,000 | CERs | "Retired on behalf of Akademiska Hus" | 16/02/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir LO Kwok Wah, Kelvin, JP” for Annual Dinner in 2021 (Transaction ID: 734) | 22/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Alice Pang” for Annual Dinner in 2021 (Transaction ID: 738) | 22/02/2021 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 321 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Sumaré - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Sumaré - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 6,428 | CERs | Retired on behalf of SODIMAC Chile - Despachos CO2 Neutral 2022 - SCX ID 0104-E1004A86. | 13/04/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 4 | CERs | Beneficiary: WONDERMORE, S.A. Retirement Reason Details: Voluntary cancellation made by Anaconda Carbon CR on behalf of Wondermore.org to offset emissions generated by air travel to/from Guatemala, for the Roche Viajes de los Heroes Group August 2019 | 13/08/2019 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 3,450 | CERs | Cancelled for the purpose of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 22/12/2020 | Attestation letter |
| 4470 | 9.6 MW Wind Energy Project at Jamvadi & Navagam & Kalavad, Jamnagar, Gujarat, India of Rohit Surfactants Pvt. Ltd. | Energy industries (renewable - / non-renewable sources) | India | 14,930 | CERs | "Retired on behalf of Gingg Bros. Dairy, LLC to offset greenhouse gas emissions of company" | 23/03/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 6,400 | CERs | Retired on behalf of SCHOTT - One further step towards climate neutrality by 2030. | 30/12/2021 | Attestation letter |
| 5153 | KDHC Daegu Biomass Cogeneration Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 29,986 | CERs | It is to be offset for domestic carbon emission trading in South Korea | 07/05/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,496 | CERs | Retirement – Beneficiary: Coopedota, R.L.; Retirement Reason Details: Compensación voluntaria emitida por CoopeDota, R.L.. para las emisiones GHG generadas de sus operaciones relativas a los granos tostados de café de la cosecha 2017-2018. | 07/02/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 4,787 | CERs | Voluntary cancellation of CERs was made on behalf of FCA Campo Largo Powertrain under Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 05/09/2019 | Attestation letter |
| 8323 | Grid Connected Gas based Combined Cycle Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 118,573 | CERs | DL Carbon Neutrality 2021 | 11/04/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 5,247 | CERs | 2019-1405 | 2020 | 09/11/2020 | Attestation letter |
| 2714 | Assisted Natural Regeneration of Degraded Lands in Albania | Afforestation and reforestation | Albania | 9,151 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 16/11/2020 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 92,100 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 17/06/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon credits available for voluntary uses - TR 44 | 22/12/2020 | Attestation letter |
| 8198 | 21 MW Wind energy farm at Palladam, TamilNadu by HZL | Energy industries (renewable - / non-renewable sources) | India | 33 | CERs | These credits are retired on behalf of Furthr for its monthly subscribers between 15th March 2021 and 14th April 2021" | 01/06/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 25,960 | CERs | Retiro a favor de Distribuidora de Combustibles Discom SAS identificado con NIT 901.160.786-4 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 18/01/2022 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 113,019 | CERs | Voluntarily cancellation of 113,019 CERs for conversion to Gold Standard VERs for project GS4426. These units have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 30/04/2020 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 100,201 | CERs | Voluntary offset on behalf of Ambipar Group regarding the carbon footprint of its Brazilian operations in 2020, as measured in the corresponding inventory | 22/09/2021 | Attestation letter |
| 4463 | Metro Delhi, India | Transport | India | 177,413 | CERs | "Retired on behalf of South Pole client #103748" | 14/09/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación Carbono | Jordania 5-12 Diciembre | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 10/01/2022 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 61 | CERs | Cancelled to neutralize the Carbon Emissions generated by Shaoguan Hongxiang Construction Engineering Co., Ltd in 2021 | 29/07/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon removal credits for voluntary climate action - TR 55 | 22/12/2020 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 61,350 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named EcoMetrix Africa, with the carbon offset administration system account number 100014, into which the offsets must be listed. | 19/07/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 27 | 22/12/2020 | Attestation letter |
| 7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 300 | CERs | Contribute to Climate action and become a carbon neutral company(ROBUS) | 08/08/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Convención Iberia Dior 2021 (digital) | 30/07/2021 | Attestation letter |
| 10110 | 8.4 MW renewable energy based power generation by Hi-Tech | Energy industries (renewable - / non-renewable sources) | India | 2,923 | CERs | “Gasversorgung Görlitz GmbH – CO2 neutrales Erdgas” | 29/07/2022 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 1,315 | CERs | Not shared | 31/03/2020 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Prof Joseph MAK Yiu Wing” for Annual Dinner in 2021 (Transaction ID: 722) | 22/02/2021 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1,385 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Los sueños Marriott Ocean and Golf Resort para compensar el inventario de GEI correspondiente al periodo 2021 | 18/08/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 869 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ORGANIZACIÓN SUMA S.A.S (NIT 900364615-6), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 5938 | Grid Connected Wind Power Project by M/s Giriraj Enterprises in Madhya Pradesh | Energy industries (renewable - / non-renewable sources) | India | 66,035 | CERs | “Towards Delta’s 2020 CN goal” | 23/07/2021 | Attestation letter |
| 4992 | 1.5 MW Wind Power Project in Maharashtra by M/s. Allgrow ventures | Energy industries (renewable - / non-renewable sources) | India | 3,500 | CERs | “Retired of behalf of UNIVERSITY OF TECHNOLOGY SYDNEY, ABN 77 257 686 961” | 19/11/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 15,370 | CERs | Beneficiario: BBVA MEXICO Razón: Carbon Footprint 2021 BBVA México | 17/12/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 262 | CERs | Voluntary cancellation made by CONCESIONARIA VUELA COMPAÑÍA DE AVIACIÓN, S.A.P.I DE C.V. (VOLARIS) during second quarter (April-June) of 2019 | 18/03/2020 | Attestation letter |
| 10512 | IDCOL Improved Cook Stove Program | Energy demand | Bangladesh | 456,395 | CERs | Cancellation for conversion to VCUs. | 11/05/2022 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 1,000 | CERs | Cancelled in compliance with Air Protection Law in the Czech Republic | 27/01/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 348 | CERs | on behalf of Skyscanner | 05/01/2021 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 398 | CERs | To Neutralize the Carbon Emission generated by Zhongshan Guo jing Furniture Co., Ltd in 2021 | 11/03/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 100 | CERs | Offsetting the carbon footprint of Company Trips Algorand Inc | 05/05/2021 | Attestation letter |
| 1268 | Tungabhadra wind power project in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 48,830 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 23 | CERs | Offset on behalf of: Vancamper Reason for compensation: I am offsetting the carbon footprint of my company's trip | 21/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,747 | CERs | 2020-0015 | 2020 | 09/11/2020 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 24,180 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Distribuidora la Florida S.A (3-101-295868) para compensar las emisiones GEI generadas por la huella operacional en Costa Rica del durante el año 2020, para cumplir con los requisitos del PPCN. | 12/04/2021 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 82,535 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 02/06/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 10,000 | CERs | Voluntary cancellation of Goldstandard-CDM CERs on behalf of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. | 03/12/2021 | Attestation letter |
| 1268 | Tungabhadra wind power project in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 37,184 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action - TR 15 | 22/12/2020 | Attestation letter |
| 3110 | 3MW Shinan Wind power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 6,312 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) | 02/04/2020 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 650 | CERs | LYRECO MANAGEMENT | 10/06/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,153 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Airport | 11/05/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 717 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 717 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 717 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 07/08/2020 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 3,450 | CERs | This voluntary cancellation of CERs was made on behalf of Programa Amigo do Clima. Details provided at www.amigodoclima.com. | 21/01/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Observatorio del ahorro y la inversión Bestinver 2020 | 07/04/2020 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 112 | CERs | Voluntary cancellation by Hua Xia Bank (Hangzhou Binjiang Sub-branch) to offset GHG Emissions generated from its daily operation in 2021 | 28/09/2022 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 190,000 | CERs | Luigi Lavazza SpA Carbon Footprint 2021 | 17/09/2021 | Attestation letter |
| 0008 | Brazil NovaGerar Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 126 | CERs | Esses créditos foram aposentados em nome da SP-Arte em decorrência do evento SP-Arte 2022 | 07/04/2022 | Attestation letter |
| 6560 | Patrind Hydropower Project | Energy industries (renewable - / non-renewable sources) | Pakistan | 190,000 | CERs | This request is submitted to cancel the CERs issued from Patrind Hydropower Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water") | 04/08/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 25,000 | CERs | Voluntary cancellation of CDM CERs on behalf of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. | 20/05/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 344 | CERs | Purpose: Cancelación Voluntaria realizada por Fábrica de Harinas de Centroamérica, S.A., Costa Rica Beneficiary: Fábrica de Harinas de Centroamérica, S.A. Costa Rica. | 15/02/2022 | Attestation letter |
| 2311 | Federal Intertrade Hong-Ru River Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 11,438 | CERs | Cancelled for FZ | 01/11/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 171 | CERs | on behalf of Santander Consumer Bank GmbH | 05/01/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 62,492 | CERs | "2019-1237 | 2020" | 26/10/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 7,784 | CERs | Voluntary cancellation in favor of EMPRESA COLOMBIANA DE PETRÓLEOS SA -ECOPETROL SA; NIT 899999068-1 for neutralization of the GHG emissions, to be used by EMPRESA COLOMBIANA DE PETRÓLEOS SA -ECOPETROL SA NIT 899999068-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,216 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COLTANQUES (NIT 860.040.576-1), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 9176 | Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” | Energy demand | Honduras | 2,577 | CERs | Retired on behalf of Ecologi Action Ltd. | 16/04/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,535 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by RIOPAILA CASTILLA (NIT 900.087.414-4, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,472 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INGENIO DEL CAUCA (NIT 891.300.237-9, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 9925 | SHPs Tambaú, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil | Energy industries (renewable - / non-renewable sources) | Brazil | 332 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 332 ton of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 332 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 30/12/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación Carbono | Laponia 23-29 Diciembre | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 10/01/2022 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 12,570 | CERs | on behalf of ClimatePartner | 12/12/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 3,697 | CERs | 2019-0920 | 2020 | 09/11/2020 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 201,290 | CERs | Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00076604) | 08/03/2021 | Attestation letter |
| 1026 | A.T. Biopower Rice Husk Power Project in Pichit, Thailand | Energy industries (renewable - / non-renewable sources) | Thailand | 38,753 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S.A. | 27/09/2021 | Attestation letter |
| 2138 | Chao Khun Agro Biogas Energy Project | Waste handling and disposal | Thailand | 260 | CERs | Voluntary cancellation made by Thai Biogas Energy Company Limited on behalf of ZABORIN, Co. Ltd to offset CO2 emissions generated from Zaborin Ryokan's fossil fuel related energy consumption. Funds received will be used for the development of new sustainable biogas emission reduction projects. | 08/09/2020 | Attestation letter |
| 2486 | Conversion of SF6 to the alternative cover gas SO2 at RIMA magnesium production | Metal production | Brazil | 31,356 | CERs | This operation of voluntary cancellation of Certified Emission Reductions units issued by the Clean Development Mechanism is made for: “Carbon credits retired on behalf of KDC/one Development Corporation Inc” | 24/05/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,040 | CERs | Cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by EXCAVACIONES Y PROYECTOS DE COLOMBIA S.A.S (NIT 900.149.606-9, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 2,000 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by Anaconda Carbon | 19/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,122 | CERs | 2019-0173 | 2020 | 11/11/2020 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 187 | CERs | Voluntary cancellation in favor of PUMA ENERGY COLOMBIA COMBUSTIBLES SAS; NIT 900497906-5 for neutralization of the GHG emissions, to be used by EASYFLY S.A. NIT 900088915-7, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 931 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ORICA COLOMBIA S.A.S (NIT 830.022.462-5), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 15 | CERs | Voluntary cancellation for business trip emissions of Timing Carbon Asset Management Co., Ltd, from 2010-2020 | 02/11/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 6,933 | CERs | Retired on behalf of Cool Effect for the month of January 2021. | 02/03/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 14 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 52 267,0 kms of riders using UberCOMFORT during January 2021 made by A-CO2 | 05/02/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1,100 | CERs | Voluntary cancellation for 2021 Carbon Neutral Factory Certification of Yihai Kerry (Kunming) Foodstuffs Industries Co.,Ltd. | 09/08/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 24,727 | CERs | On behalf of Santander Bank N.A. I am offsetting the carbon footprint of my organization | 17/12/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Ms. Smriti Irani Union Minister for Textiles, Govt. of India. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 7650 | West Huaybong 2 wind farm project | Energy industries (renewable - / non-renewable sources) | Thailand | 71,780 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients. | 19/10/2022 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 1,202 | CERs | Compensação da pegada de carbono do Grupo VAMOS 2019 - Compensation of the carbon footprint of Grupo Vamos 2019 | 21/12/2020 | Attestation letter |
| 3453 | CGN Inner Mongolia Zhurihe Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 61,196 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 12/03/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,995 | CERs | October 2021 Cool Effect Platform Sales: UPMSIC2019 | 29/11/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,737 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL S.A identificado con NIT 830.095.213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 03/08/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 500 | CERs | Retired on behalf of Planetly GmbH. | 03/05/2021 | Attestation letter |
| 9376 | Wind Power Project at Tadas, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 195,010 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard. | 10/02/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,897 | CERs | 2018-0965 | 2020 | 11/11/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 3 | CERs | Project NetZero - Team emissions offset | 05/10/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 60,000 | CERs | Cancelación voluntaria a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS (NIT 900497906-5) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/11/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 23,004 | CERs | Cancelación voluntaria a favor de BIOMAX COMBUSTIBLE S.A (NIT 830136799-1) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/11/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 500 | CERs | mTurk climate change experiment | 27/12/2018 | Attestation letter |
| 6488 | Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia | Waste handling and disposal | Malaysia | 25,000 | CERs | L’Oréal Carbon Balanced Program | 22/04/2021 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 20,000 | CERs | Retiro a favor de PLUS + ENERGY S.A.S. identificado con NIT 901065873-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 17/02/2022 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 12,746 | CERs | on behalf of GP-18 | 09/08/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 200,000 | CERs | “Voluntary Cancellation on behalf of ClimatePartner GmbH clients." | 19/09/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 732 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - Mopar Hortolândia under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10 | tCERs | P4C - People for Climate Initiative | 30/12/2020 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 13 | CERs | Offsetting the carbon footprint of Chamonix Crypto Summit, December 2021. | 11/04/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 8,000 | CERs | Retiring of 8,000 Gold Standard CERs issued in 2020 for unavoidable GHG emissions in the reporting year 2021, in order to achieve the ambitious climate target of Miele Cie. KG. | 13/01/2022 | Attestation letter |
| 9063 | MACAÚBAS LANDFILL GAS PROJECT |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 97,125 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 24/02/2022 | Attestation letter |
| 10004 | City of Cape Town Landfill Gas Extraction and Utilisation Programme | Waste handling and disposal | South Africa | 112,931 | CERs | The voluntary cancellation is in accordance with the Regulations on carbon offsets under Section 19 of the South African Carbon Tax Act, as published in Government Notice 1556 Government Gazette 42873 on 29 November 2019. | 30/07/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 8 | CERs | Compensación voluntaria llevada a cabo por Anaconda Carbon a favor de Cafenor S.A. de C.V. para compensar las emisiones de GEI derivadas de la operación del Beneficio Cafenor para el periodo 2021 | 25/02/2022 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 6,215 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften der Gebau GmbH in 2025 | 22/10/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | beneficiary: Visceral for: Offset Climate Certification 2020 | 27/05/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 15,400 | CERs | Retired on behalf of Posten Norge (Divisjon Post) | 30/10/2019 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,159 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 1159 tons of CO2 associated with fossil fuels to be used by CEMENTOS ARGOS (Nit 890.100.251-0) in order not to cause the national carbon tax. | 13/07/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 184 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 184 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” Reference month: February 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 184 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Mês de referência: Fevereiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/03/2022 | Attestation letter |
| 3056 | Poyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 80,150 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 06/01/2022 | Attestation letter |
| 3066 | Hunan Qidong Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 60,169 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 06/01/2022 | Attestation letter |
| 0606 | El Canadá Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 2,209 | CERs | BP Technology Ventures Limited requested IBRD as Trustee of the Carbon Funds to cancel emission reductions resulting from its participation in El Canada Project (CDM Ref# 606) per instructions in Cancellation Letter dated 14/01/2021. | 03/02/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,003 | CERs | Voluntary cancellation made by Anaconda Carbon on behalf of Agricola El Cantaro S.A. ( Lechería ) to offset emissions generated by company operations for the following periods : 894 tons for the 2017 period , and 109 tons for the 2019 period | 12/11/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 2 | CERs | OFFSET ON BEHALF OF Guarderia Meraki REASON FOR COMPENSATION I am offsetting the carbon footprint of my organization | 01/06/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Mr. Sunil Bhaskaran CEO & Managing Director, Air Asia India. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Sr CHAN Ka Kui, SBS, JP” for Annual Dinner in 2021 (Transaction ID: 739) | 22/02/2021 | Attestation letter |
| 10140 | Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.January-14-04) | Energy industries (renewable - / non-renewable sources) | India | 51,007 | CERs | Retired on behalf of ClimatePartner’s customers. | 24/02/2022 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 66,800 | CERs | “Retirada permanente de circulação do mercado em nome da Natura Cosméticos S.A./ Retirement on behalf of Natura Cosméticos S.A”. | 20/12/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 439 | CERs | Voluntary cancellation made by ASOCIACIÓN DE BANCOS DE MÉXICO A.C. | 20/04/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de GRUPO DANISSA para compensar las emisiones GEI del voluntariado Volcán Irazú (PV Agencia Datsun Sabana, y Avis Alajuela) | 29/09/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 39 | CERs | Ueberkompensation Klimaneutralitaet 2019 | 16/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 30 | CERs | XVIII Conferencia anual de inversores 2019 (10 ciudades) | 07/04/2020 | Attestation letter |
| 7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 500 | CERs | Cancellation on behalf of Sean Dennis to OFFSET PERSONAL LIFETIME CARBON EMISSIONS FOOTPRINT (UP TO 2022) | 03/08/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 44 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 175 765,0 kms of riders using UberFLASH during December 2020 made by A-CO2 | 22/01/2021 | Attestation letter |
| 1280 | 2.2 MW hydropower plant in Birsinghpur, Madhya Pradesh of Ascent Hydro Projects Limited (AHPL) | Energy industries (renewable - / non-renewable sources) | India | 1,663 | CERs | Beneficiary (1663 CERs): Snowview Tea Company Pvt. Ltd. Purpose: 'Carbon Neutrality'. The voluntary cancellation of 1663 CERs is for the purpose of Offsetting Carbon Footprints for Snowview Tea Garden, Darjeeling. With these Offsets, the Snowview Tea Garden located in Darjeeling (India) becomes Carbon Neutral for the operational year 'April 2020-March 2021' against its 'Scope 1' & 'Scope 2' emissions, accounted as per ISO-14064 against a baseline year of assessment. | 30/12/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 100 | CERs | on behalf of Santander Sweden | 05/01/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 23 | CERs | Compensación de emisiones generadas por operaciones anuales de Top Energy México | 19/12/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,000,000 | CERs | Not shared | 26/03/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 25,633 | CERs | Compensation of Carbon Footprint for year 2020 of Acciona Energia | 15/04/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 543 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by UNION METROPOLITANA DE TRANSPORTADORES (NIT 805.025.780-5 , project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 189 | CERs | Assemblée Nationale en France | 05/04/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 148 | CERs | Retirement- Beneficiary: FACO (Franz Amrhein y Compañía) S.A. Retirement reason details: Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compañía) S.A. to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of May 2019. For more information please visit: www.hondacostarica.com/co2 | 24/06/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 811 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 12/04/2022 | Attestation letter |
| 8474 | Maracanã Small Hydropower Project | Energy industries (renewable - / non-renewable sources) | Brazil | 11,020 | CERs | Purpose: Carbon Footprint offset for the year 2021 of the SANTANDER GROUP Beneficiary: SANTANDER GROUP | 16/12/2021 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 13,000 | CERs | Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of AMARO LTDA to offset CO2 emissions related to the reported GHG Emissions from 2021. | 25/08/2022 | Attestation letter |
| 4249 | Power generation by utilizing Blast Furnace Gas at Mukand Limited, Ginigera, Karnataka |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
India | 28,921 | CERs | Cancelled for FZ | 24/10/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 18 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary cancellation made by A-CO2 on behalf of the Staton Moreno Family for all GHG emissions generated during the period of January until December 2019. | 14/01/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary cancellation made by Anaconda Carbon on behalf of Unique Adventures Costa Rica to offset all GHG emissions generated from their main office operation for the year 2019. | 09/01/2020 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 490 | CERs | on behalf of GP-15 | 09/08/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 68 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - Escritório Brasília under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 1483 | Energeticos Jaremar – Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, Honduras |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Honduras | 4,333 | CERs | Not shared | 31/03/2020 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 172 | CERs | OFFSET ON BEHALF OF: Sustainable Planet Holdings Ltd REASON FOR COMPENSATION: I am offsetting the carbon footprint of my clients | 03/02/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 344 | CERs | conversion to GS VERs for project POA GS ID 3378 | 16/02/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir Eric Li” for Annual Dinner in 2021 (Transaction ID: 743) | 22/02/2021 | Attestation letter |
| 4928 | Huaneng Changyi Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 3,500 | CERs | Carbon offset of 3,500 tonnes CO2 on behalf of LTH Castings d.o.o. (for customer BMW) for business year 2023. | 20/05/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 582 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Osasco - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Osasco - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 788,014 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 19/07/2019 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | Cancellation of GS-CERs in the name of Mr. Ananth Tyamagundlu to offset the emissions due to travel to & from Germany in June 2019, and for future travel. | 06/06/2019 | Attestation letter |
| 3558 | Small-Scale Hydropower Project Sahanivotry in Madagascar | Energy industries (renewable - / non-renewable sources) | Madagascar | 16,219 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 23/12/2019 | Attestation letter |
| 0251 | Cote small-scale hydropower plant | Energy industries (renewable - / non-renewable sources) | Costa Rica | 642 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and IBRD as Trustee of the Carbon Funds to cancel all emission reductions resulting from its participation in the Funds. | 02/10/2019 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 38,845 | CERs | 17er Oberlandenergie GmbH – CO2 neutrales Erdgas | 13/12/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 205 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Airport | 12/05/2022 | Attestation letter |
| 9176 | Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” | Energy demand | Honduras | 1,425 | CERs | Emission compensation for coffee purchased by Choice and Compass during 2020 | 15/03/2021 | Attestation letter |
| 8103 | 9 MW Wind Energy Farm at Jodhpur Rajasthan by HZL | Energy industries (renewable - / non-renewable sources) | India | 90 | CERs | Retired on behalf of Furthr for its monthly subscribers between 15th December 2020 and 14th January 2021. | 11/02/2021 | Attestation letter |
| 9007 | Distribution of Improved Cook Stoves in Sub-Saharan Africa | Energy demand | Senegal, Ghana, Nigeria, Malawi, Zambia, Zimbabwe | 188,876 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 18/08/2021 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 7,467 | CERs | on behalf of GP-13 | 09/08/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 10 | CERs | Voluntary Cancellation of 10 CERs for transaction no. 1140 (VCHL) | 25/10/2021 | Attestation letter |
| 4413 | Beijing Guanting Wind Power Project Phase II and Phase II addition | Energy industries (renewable - / non-renewable sources) | China | 900 | CERs | beneficiary: Schneider Electric Manufacturing (Wuhan) Co., Ltd Purpose: offset the GHG generated from operation activities of Schneider Electric Manufacturing (Wuhan) Co., Ltd from 01/01/2021 to 31/12/2021. | 12/07/2022 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,077 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 1077 tons of CO2 associated with fossil fuels to be used by CEMENTOS ARGOS (Nit 890.100.251-0) in order not to cause the national carbon tax. | 09/06/2022 | Attestation letter |
| 4634 | Piedra Larga Wind Farm | Energy industries (renewable - / non-renewable sources) | Mexico | 7,240 | CERs | Clientes de Engencap Fin | 29/06/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 11 | CERs | Compensación voluntaria a favor de TEMPO DESIGN INC. por la neutralización de 11tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 8,062 | CERs | Voluntary cancellation in favour of ZEUSS PETROLEUM S.A (NIT 811.043.174-1) for the neutralization of the GHG emissions associated with the fossil fules in order to not cause the national carbon tax according to Dec. 926 de 2017. | 19/12/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,007 | CERs | 2020-0339 | 2020 | 11/11/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 172 | CERs | Voluntary Cancellation of 172 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during second quarter (April-June) of 2021 | 12/11/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 21,290 | CERs | Retiro a favor de Distribuidora de Combustibles Discom SAS identificado con NIT 901.160.786-4 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 22/02/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 791 | CERs | Cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by OPERACIONES NACIONALES DE MERCADEO-OPEN MARKET (NIT 860.350.940-1, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 0571 | 10.6 MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan. | Energy industries (renewable - / non-renewable sources) | India | 8,903 | CERs | This is to certify that Nouveau Diamonds LLP has purchased 8903 Tons of Carbon Credit to offset their Carbon Emissions for the Financial Year 2021- 2022 and there by to become Carbon Neutral entity for 2021-22. | 08/06/2022 | Attestation letter |
| 4466 | Uganda Nile Basin Reforestation Project No.5 | Afforestation and reforestation | Uganda | 1,750 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 16/11/2020 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 250 | CERs | Voluntary cancellation made by KPMG Cárdenas Dosal S.C. to neutralize the carbon footprint of its operations originated in 2020. | 06/04/2021 | Attestation letter |
| 2486 | Conversion of SF6 to the alternative cover gas SO2 at RIMA magnesium production | Metal production | Brazil | 10,000 | CERs | This operation of voluntary cancellation of Certified Emission Reductions units issued by the Clean Development Mechanism is made for: “The credits were retired on behalf of Easy Energy Inc. 300-15300 Croydon Drive Surrey, BC V3Z 0Z5”. | 11/05/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 200 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Distribuidora Florex Centroamericana S.A. para compensar las emisiones GEI derivadas de su operación en el 2021 y cumplir con los requisitos del PPCN. | 10/10/2022 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 99 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00077554 | 30/09/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 8 | CERs | Bitcoinforme SL | 18/08/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 5 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for May 2021 sales | 02/06/2021 | Attestation letter |
| 7864 | Recovery and Avoidance of Methane from Industrial Wastewater Treatment Projects | Waste handling and disposal | Indonesia | 27,463 | CERs | Retirement entity: “Ciena Corporation” Retirement reason: “2020 Sustainability Goals” | 07/12/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,123 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 2123 tons of CO2 associated with fossil fuels to be used by CONCRETOS ARGOS (Nit 860.350.697-4) in order not to cause the national carbon tax. | 05/08/2022 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 3,000 | CERs | Cancelled for the purpose of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 22/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 170,000 | CERs | Biomax S.A. NIT 830.136.799-1. Para la no causación del Impuesto al Carbono en los meses febrero y marzo de 2021. | 22/01/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 2,766 | CERs | Voluntary cancellation to offset the GHG generated from operation of Shenzhen Dashi Intelligent Co., Ltd. in Shenzhen Nanshan District High-tech Village Wl Building A Block 5th floor from January 1,2021 to December 31,2021 | 10/10/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 6 | CERs | Compensación voluntaria a favor de ABOLU, S.A. por la neutralización de 6tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 4 | CERs | Compensación voluntaria a favor de WEBFORMA DE PANAMA, S.A. por la neutralización de 4tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,647 | CERs | UPMSIC2016 – September Sales | 03/11/2021 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 28,805 | CERs | Voluntary cancellation of 28,805 CERs conducted by Siemens Gamesa Renewable Energy S.A. on behalf of Bii Nee Stipa to offset the company's Scope 1 and Scope 2 CO2 emissions from fiscal year 2021, representing the period between October 1, 2020 and September 30, 2021 | 03/11/2021 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 75,550 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 07/01/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,974 | CERs | Retiro a favor de TERPEL S.A identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 19/07/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 52 | CERs | retired on behalf of Offset Alliance for Bring It Promotions / A5 Volleyball Club 2019 Botswana Tour | 17/10/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,321 | CERs | On behalf of Cool Effect | 15/01/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,725 | CERs | Voluntary compensation from Uber Mexico to offset GHG emissions made by Anaconda Carbon | 16/02/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir BOK Kwok Ming, Aaron” for Annual Dinner in 2021 (Transaction ID: 741) | 22/02/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,670 | CERs | For Cool Effect on behalf of Bankia SA. | 16/02/2021 | Attestation letter |
| 10441 | Programme of Activities for Small Scale Solar and Wind Power Generation in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 36,000 | CERs | CO_2022_801 ord 001 – Calzedonia Group | 26/08/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 730 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by PROVEEDOR Y SERCARGA S.A. (NIT 860.016.819), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 8784 | Micro Scale Biogas CDM Project of CROSS | Energy industries (renewable - / non-renewable sources) | India | 12,212 | CERs | 3095 women from 264 villages in Andhra Pradesh have reduced 12,461 tonnes of GHG emissions by using Biogas units instead of firewood. These Biogas units were built with generous contributions from IndiGo passengers who compensated a part of their travel emissions. | 17/09/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 18 | CERs | OFFSET ON BEHALF OF: Consejo General de la Arquitectura Técnica de España REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 10/02/2022 | Attestation letter |
| 9376 | Wind Power Project at Tadas, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 67,533 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 23/05/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 6 | CERs | Sustainable Planet Holdings Ltd | 21/09/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 7 | CERs | XVIII Conferencia Anual de Inversores 2019 Barcelona | 17/09/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 211 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 843 236,0 kms of riders using UberECO during June 2020 made by A-CO2 | 06/07/2020 | Attestation letter |
| 3009 | Gochang Solapark 14.98MW Photovoltaic Power Plant Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 14,429 | CERs | Cancelled CERs will return into be KOCs (Korea offset credits) which can be used in domestic emissions trading scheme of Republic of Korea. | 08/06/2021 | Attestation letter |
| 1948 | Moldova Soil Conservation Project | Afforestation and reforestation | Republic of Moldova | 92,541 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 17/12/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 800 | CERs | Voluntary cancellation of 800 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑÍA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during the first quarter (January - March) of 2018 | 05/12/2018 | Attestation letter |
| 8480 | Distribution of ONIL Stoves—Guatemala | Energy demand | Guatemala | 110,977 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 03/12/2021 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 5,923 | CERs | Retired 5,923 credits on behalf of Cemasys’ client, Contract number: CE-202112577. | 07/01/2022 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 40,000 | CERs | Klimaneutralstellung Gas-Produkte der meistro Energie GmbH, 2021 | 01/10/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 87 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CONCRETOS EL DORADO S.A (NIT 900.253.780-7), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Retirement on behalf of FZ. | 30/06/2022 | Attestation letter |
| 8671 | 15 MW Solar Photovoltaic Power Project at Gujarat | Energy industries (renewable - / non-renewable sources) | India | 5,000 | CERs | Not shared | 06/02/2019 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 90,478 | CERs | Voluntary offset on behalf of Ambipar Group regarding the carbon footprint of its Brazilian operations in 2020, as measured in the corresponding inventory | 22/09/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,000 | CERs | These carbon credits have been retired on behalf of CarbonClick for the purpose of carbon offsetting. | 28/06/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 3,561 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 31/07/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 76 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de CONTECON GUAYAQUIL para compensar las emisiones de GEI generadas por su operación durante el periodo 2020. | 17/01/2022 | Attestation letter |
| 0735 | La Vuelta and La Herradura Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 52,562 | CERs | ZEUSS PETROLEUM S.A.S NIT:811043174-1 | 18/09/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 28 | CERs | Voluntary Cancellation of 28 CERs for transaction no. 807 & 814 (14 CERs Each) on www.clpcarboncredits.com | 26/05/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 10 | CERs | CIQSUE | 05/04/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 250 | CERs | OFFSET ON BEHALF OF: Gorman-Rupp Europe B.V. REASON FOR COMPENSATION: I am offsetting the carbon footprint of my clients | 10/02/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 1 | CERs | OFFSET ON BEHALF OF Simon Gneuß REASON FOR COMPENSATION Other | 05/10/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 362 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Distribuidora Florex Centroamericana S.A para compensar las emisiones GEI derivadas de su operación en el 2020 y cumplir con los requisitos del PPCN. | 20/08/2021 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 99,124 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named EcoMetrix Africa, with the carbon offset administration system account number 100014, into which the offsets must be listed. | 10/06/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | Ibiza en velero 11/06- 15/06 HUAKAI. I am offsetting the carbon footprint of my clients | 22/06/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,495 | CERs | On behalf of Cool Effect | 18/11/2019 | Attestation letter |
| 10110 | 8.4 MW renewable energy based power generation by Hi-Tech | Energy industries (renewable - / non-renewable sources) | India | 19,747 | CERs | To offset CO2 emissions from fuel gallons delivered. | 10/08/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,000 | CERs | Compensación Meliá | 29/09/2020 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 249 | CERs | CASDEN | 05/04/2022 | Attestation letter |
| 0176 | Meizhou Landfills Gas Recovery and Utilization as Energy | Waste handling and disposal | China | 180,000 | CERs | Voluntary Cancellation on behalf of behalf of Dow and IOC | 14/12/2021 | Attestation letter |
| 3611 | Roaring 40’s Wind Farms (Khandke) Private Limited – Phase III | Energy industries (renewable - / non-renewable sources) | India | 130 | CERs | Voluntary Cancellation of 130 CERs for transaction no. 911 to 923 (10 CERs each) | 26/05/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 13,872 | CERs | Retirement Beneficiary : SailGP, Reason - I want to contribute to Climate Action. | 10/03/2021 | Attestation letter |
| 9226 | Jirau Hydro Power Plant | Energy industries (renewable - / non-renewable sources) | Brazil | 402 | CERs | Voluntary cancellation made by ENERGIA SUSTENTÁVEL DO BRASIL S.A., through its shareholders: ENGIE Brasil; MITSUI & CO; ELETROBRÁS ELETROSUL; ELETROBRÁS CHESF on behalf of IMM Esporte e Entretenimento, to offset CO2 emissions reported in the GHG Inventory (under the Scopes 1, 2 and 3) originated during the ATP 500 RIO OPEN presented by CLARO tennis event in 2020, which took place at the Brazilian Jockey Club in Rio de Janeiro, Brazil, from February 15 to 23, 2020. | 10/06/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 91 | CERs | Voluntary Cancellation of 91 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during first quarter (January-March) of 2021 | 12/11/2021 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 21 | tCERs | Retired for By The River Brew Co. | 31/01/2020 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 3,500 | CERs | Retired on behalf of SODIMAC Chile - Despachos CO2 Neutral 2020 - SCX ID 0084-E1704A67. | 17/11/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 95 | CERs | MV0362 | 2020 | 16/12/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 7 | CERs | Voluntary cancellation in favour of Chevron Petroleum Company (NIT 860005223-9) for the neutralization of the GHG emissions, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 6003 | Wind power project by Sterling Agro Industries Ltd. | Energy industries (renewable - / non-renewable sources) | India | 108,509 | CERs | “On behalf of Lenovo Clients 1 September 2022 – 15 September 2022, Program Managed by Lenovo.” | 15/09/2022 | Attestation letter |
| 4274 | SF6 recovery and reclamation project, South Korea | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | Republic of Korea | 144,207 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Solvay Korea Co., Ltd.. The beneficiary of all cancelled CERs is Solvay Korea Co., Ltd.. | 11/09/2020 | Attestation letter |
| 7864 | Recovery and Avoidance of Methane from Industrial Wastewater Treatment Projects | Waste handling and disposal | Indonesia | 13,594 | CERs | Retirement entity: “Ciena Corporation” Retirement reason/details : “2020 Sustainability Goals”. | 07/12/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 29 | 22/12/2020 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 5 | CERs | This voluntary cancellation of CERs was made on behalf of Lear do Brasil Industria e Comércio de Interiores / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 308 | CERs | This voluntary cancellation of CERs was made on behalf of Revestcoat Pintura / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 1413 | Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project | Waste handling and disposal | Thailand | 23,813 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S.A | 29/12/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 64 | CERs | Ambassade de France US | 05/04/2022 | Attestation letter |
| 5851 | Guoshuitou Diaobingshan Quanyangou Wind Power Project | Energy industries (renewable - / non-renewable sources) | China | 200,000 | CERs | Beijing Organising Committee for the 2022 Olympic and Paralympic Winter Games is beneficiary of voluntary cancellation of 200,000 CERs from China Three Gorges Corporation.The cancellation is to achieve carbon neutrality for the Olympic and Paralympic Winter Games Beijing 2022. | 16/11/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 36 | CERs | Voluntary cancellation to offset the GHG (estimated) generated from renovation and operation of INDUSTRIAL AND COMMERCIAL BANK OF CHINA LIMITED, YANGJIANG BIGUI Sub-BRANCH from July 30, 2021 to December 31, 2022. | 23/05/2022 | Attestation letter |
| 6208 | Ibirama Small Hydropower Plant – a Brennand CDM Project Activity. | Energy industries (renewable - / non-renewable sources) | Brazil | 66,461 | CERs | Retirada permanente de circulação do mercado em nome da Natura Cosméticos S.A./ Retirement on behalf of Natura Cosméticos S.A. | 23/01/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 41,383 | CERs | Cancelación voluntaria a favor de CHEVRON PETROLEUM COMPANY (NIT-860005223-9) para neutralización de emisiones de gases de efecto invernadero por consumo de combustibles fósiles | 20/08/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 118,000 | CERs | Cancelación voluntaria a favor de PETROLEOS DEL MILENIO SAS - PETROMIL SAS (NIT-819001667-8) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 19/04/2021 | Attestation letter |
| 3071 | Wanzai Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 8,498 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S. A | 11/01/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 329 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by UNIMINEX S.A.S (NIT 900.979.154-2), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8,397 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - AguaREASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Agua | 12/05/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 236 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES MEDELLIN CASTILLA (NIT 890.902.816-3, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 1364 | N2O abatement project at nitric acid plant No. 11 at African Explosives Ltd. (AEL), South Africa | Chemical industries | South Africa | 144,117 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization AEL Mining Services Limited, to be listed in COAS Account number 100015. | 09/10/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 200 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 07/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 365 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CI COLOMBIAN NATURAL RESOURCES I S.A.S (NIT 900.333.530-6), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 10,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 56 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by MASMETRO (NIT 900.506.474-4, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 6560 | Patrind Hydropower Project | Energy industries (renewable - / non-renewable sources) | Pakistan | 3,157 | CERs | This request is submitted to cancel the CERS issued from Patrind Hydropower Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 25/10/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,850 | CERs | Retiro a favor de PRIMAX COLOMBIA identificado con NIT 860002554-8 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 18/07/2022 | Attestation letter |
| 4634 | Piedra Larga Wind Farm | Energy industries (renewable - / non-renewable sources) | Mexico | 3,000 | CERs | Voluntary cancellation on behalf of Mannington Mills, Inc. | 27/05/2022 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1,185 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Costa Rica Marriott Hacienda Belén para compensar el inventario de GEI correspondiente al periodo 2021 | 18/08/2022 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 5,574 | CERs | To Neutralize the Carbon Emission generated by Beijing Liming Wenyi Furniture CO.,LTD. in 2020. | 19/11/2021 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Ms. Harshita Jain Director Business Development, Consulting Engineers Group Ltd. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 1456 | 5 MW Wind Power Project of Alembic Ltd at Bhavnagar , Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 3,051 | CERs | Retirement Beneficiary - Tristar Group, Reason of Retirement - Offsetting of group emissions equivalent to 3,051 tons. | 01/06/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 61 | CERs | Cancelled to neutralize the Carbon Emissions generated by Guangdong Wengyuan No.3 Construction Engineering Company in 2021 | 08/08/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,906 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON S.A identificado con NIT 811026709-8 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 12/04/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 598 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Distribuidora la Florida S.A (3-101-295868) para compensar las emisiones GEI generadas por la huella operacional en Costa Rica del durante el año 2020, para cumplir con los requisitos del PPCN. | 08/06/2021 | Attestation letter |
| 3066 | Hunan Qidong Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 64,500 | CERs | AzzeroCO2 retires the credits on behalf of Novamont to offset their SCOPE 1_ 2021 annual emissions | 14/02/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 757 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 3 624 560,0 kms of riders using UberX during October 2020 made by A-CO2 | 23/11/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 107 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor del Banco Centroamericano de Integración Económica – BCIE para compensar el 100% de las emisiones GEI generadas en su Oficina de Representación en El Salvador ubicado en la Colonia San Benito, San Salvador durante el año 2021. | 26/08/2022 | Attestation letter |
| 3072 | Hunan Yiyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 57,736 | CERs | On behalf of Interstate Gas Supply, Inc. (for IGS Carbon-Neutral Natural Gas customers for 2021) | 25/11/2021 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 4,372 | CERs | Retired on behalf of SODIMAC Chile - Despachos CO2 Neutral 2021 - SCX ID 0104-E1004A86. | 13/04/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 176 | CERs | For Cool Effect on Behalf of IdeaScale | 09/06/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 9,024 | CERs | Titular: Banco Santander S.A. Concepto: Compensación huella de carbono Banco Santander 2020 | 06/11/2020 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 424 | tCERs | Retired for Tambuzi | 31/01/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 212 | CERs | Retirement – Beneficiary: MOOG MDG S.R.L. Retirement Reason Details: Cancelación voluntaria realizada por Distribuidora MOOG MDG S.R.L. para compensar sus emisiones de CO2 equivalente correspondientes al año 2019. | 02/12/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 169 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Producto Ujarras, para compensar las emisiones de GEI generados por su operación durante el 2020 y cumplir con los requisitos del PPCN | 10/09/2021 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 14,290 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 10,723 | CERs | To Compensate JETBLUE AIRWAY’S 2022 Domestic Emissions | 25/02/2022 | Attestation letter |
| 3044 | Jianli Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 7,242 | CERs | CO2-Neutralstellung der Kasseler Verkehrs- und Versorgungs-GmbH (KVV), Städtische Werke Netz + Service GmbH (NSG), Städtische Werke AG und der Kasseler Verkehrs-Gesellschaft (KVG)* im Zeitraum vom 01/2018 bis 12/2018. * Dies beinhaltet zusätzlich auch die Fahrleistungen, die von den von der KVG beauftragten Subunternehmen erbracht wurden. | 28/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 22,496 | CERs | "2019-0327 | 2020" | 26/10/2020 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 40,000 | CERs | Retired for JCDecaux France, JCDecaux SA, Cyclocity and Media Aéroport de Paris | 13/01/2022 | Attestation letter |
| 3520 | Federal Intertrade Haiyuan Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 1,672 | CERs | Retired in the behalf of ClimatePartner GmbH | 11/01/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 61,243 | CERs | "2017-875 | 2020" | 26/10/2020 | Attestation letter |
| 9925 | SHPs Tambaú, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil | Energy industries (renewable - / non-renewable sources) | Brazil | 370 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 370 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 370 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 30/12/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 359 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES ALVAREZ (NIT 830.126.659, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 5,110 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by EasyFly (NIT 900088915-7), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 0750 | 11.3 MW renewable Energy Project for a Grid System by K.M.Power (P) Limited | Energy industries (renewable - / non-renewable sources) | India | 12,219 | CERs | Retired on behalf of UBS AG as part of offsetting historical scope 1 & 2 emissions from year 2000 – 2020 | 31/01/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ms Maureen NG” for Annual Dinner in 2021 (Transaction ID: 719) | 18/02/2021 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 165 | CERs | Purpose: Compensação de emissão RITMI CONFECCOES EIRELI, localizada em Antonio Livino Farias Sombrio/SC. Beneficiary: RITMI CONFECCOES EIRELI | 19/03/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 22 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 22 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 22 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 16/08/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 77 | CERs | Beneficiary: FACO (Franz Amrhein y Compañía) S.A. Retirement reason details: Volutary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compañía) S.A. to offset emissions generated by 10,000 kilometers of new Holanda vehicles sold by FACO in the month of December 2018. For more information please visit: www.hondacostarica.com/co2 | 18/02/2019 | Attestation letter |
| 10415 | Clean Energy Program Supported by Republic of Korea | Energy demand | Myanmar | 148 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 28/02/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación carbono | Bélgica 4-8 diciembre |Huakai Travel S.L. | 17/12/2021 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 44,797 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 12/04/2021 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 350 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 350 tons of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” Reference month: June 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 350 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Mês de referência: Junho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 639 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TEAM ALLIANCE LTDA (NIT 900.178.152-0), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 305,062 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 15/04/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 200 | CERs | Voluntary cancellation by Agricultural Bank of China (Hangzhou Jiangnan Sub-branch) to offset GHG Emissions generated from its daily operation in 2022-2023 | 20/05/2022 | Attestation letter |
| 8198 | 21 MW Wind energy farm at Palladam, TamilNadu by HZL | Energy industries (renewable - / non-renewable sources) | India | 51 | CERs | These credits are retired on behalf of Furthr for its monthly subscribers between 15th February 2021 and 14th March 2021 | 01/06/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,598 | CERs | On behalf of Cool Effect | 15/01/2020 | Attestation letter |
| 1632 | Emission free electricity generation at Harihar, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 23,255 | CERs | Retired on behalf of Bendigo and Adelaide Bank Limited for Climate Active FY2022. | 16/09/2022 | Attestation letter |
| 5977 | Salkhit Wind Farm | Energy industries (renewable - / non-renewable sources) | Mongolia | 10,205 | CERs | Credits allocated to 667 Technology GmbH/ Planetly | 25/03/2020 | Attestation letter |
| 2302 | Taegisan Wind Power Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 18,972 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00077712 | 02/12/2021 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 284 | CERs | Voluntarily cancellation of 284 CERs for conversion to Gold Standard VERs for project GS4426. These units have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 30/04/2020 | Attestation letter |
| 2712 | Humbo Ethiopia Assisted Natural Regeneration Project | Afforestation and reforestation | Ethiopia | 7,207 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 16/05/2019 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 855 | CERs | Cancellation on behalf of Cleancourse inc. | 01/07/2021 | Attestation letter |
| 5884 | Use of waste gas at Namakwa Sands in South Africa |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
South Africa | 61,449 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 20/11/2020 | Attestation letter |
| 9626 | DelAgua Public Health Program in Eastern Africa | Energy demand | Rwanda | 150 | CERs | These CERs are being voluntarily cancelled to offset personal emissions from 2015 to 2020 of the Spannagle family: Matt, Jits, Inka and Sidney. They have not been used for any other mandatory or voluntary compliance purposes. CERs are cancelled from CPA001 to CPA007, from part of MP3c, as shown in the attached sheet. Calculations extracted from 'ER spreadsheets and survey.zip' file under Additional Documents. | 24/11/2020 | Attestation letter |
| 9181 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – India |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
India | 136 | CERs | Retirement on behalf of Climate Impact Partners for Customer ID 00080835 | 08/09/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 13 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Universidades .cr para compensar las emisiones GEI derivadas de la operación de su sitio web para el periodo 2021 | 03/12/2021 | Attestation letter |
| 5112 | Green House Gas Abatement through installation of a wind power project for export to the Grid. | Energy industries (renewable - / non-renewable sources) | India | 169,390 | CERs | Retired on behalf of DL 2021 CN | 30/09/2021 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 67,450 | CERs | Retired on behalf of ESB | 22/07/2021 | Attestation letter |
| 0328 | Dolowal, Salar and Bhanubhura Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 55 | CERs | Bristlecone India Limited & Bristlecone Inc, is offsetting their company’s emission to become Carbon-Neutral for year 2021-22 (ie FY22) | 27/07/2022 | Attestation letter |
| 8012 | Grid connected electricity generation from renewable source: Windfarm Complex Santa Vitória do Palmar and Chuí | Energy industries (renewable - / non-renewable sources) | Brazil | 2,200,000 | CERs | In Portuguese: "Aquisição de 2.200.000 VCUs para a compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A." in English: "Acquisition of 2,200,000 CERs for the voluntary offseting of CO2 emissions from vehicles financed by BV – Banco Votorantim S.A." | 29/12/2021 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 13,817 | CERs | Cancelled CERs will turn into be KOC which can be used in domestic emission trading scheme of Republic of Korea. | 26/08/2019 | Attestation letter |
| 0222 | Gangwon Wind Park Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 19,714 | CERs | Cancelled CERs will turn into be KOC which can be used in domestic emission trading scheme of Republic of Korea. | 26/08/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 715 | CERs | Voluntary Cancellation of 715 CERs for FFBI HK Limited (transaction no. 831) | 02/08/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 31 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by PICACHO MASIVO IOS (NIT 900.733.057-1, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 6762 | Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia | Waste handling and disposal | Malaysia | 37,000 | CERs | L’Oréal Carbon Balanced Program | 02/06/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 4 | CERs | Retirement- Beneficiary: Anaconda Carbon Retirement reason details: Voluntary compensation from Uber Pro to offset GHG emissions for first 50,000 kilometers made by A-CO2 | 27/11/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 315 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by BIMBO SA NIT 830002366-0, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,247 | CERs | 2020-0278 | 2020 | 11/11/2020 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 78,519 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 28/09/2020 | Attestation letter |
| 5179 | Guangdong Taishan Xiachuandao Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 534 | CERs | To Neutralize the Carbon Emission generated by Guangdong Jongtay Furniture Group Co., Ltd in 2021. | 07/06/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,434 | CERs | Retiro a favor de WORLD FUEL SERVICES identificado con NIT 830112215-9 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 18/05/2022 | Attestation letter |
| 0750 | 11.3 MW renewable Energy Project for a Grid System by K.M.Power (P) Limited | Energy industries (renewable - / non-renewable sources) | India | 9,014 | CERs | Retired on behalf of UBS AG as part of offsetting historical scope 1 & 2 emissions from year 2000 – 2020 | 31/01/2022 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 13,313 | CERs | This certificate represents the retirement of carbon credits equivalent to the carbon emissions generated during the manufacture process of Radar brand of tires from January 2021 to December 2021. | 07/04/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 521 | CERs | Year 2019 Emissions Offset for the Shubh Arya Steel Pvt. Ltd. | 23/08/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 325 | CERs | Year 2020 Emissions Offset for the Shubh Arya Steel Pvt. Ltd. | 23/08/2021 | Attestation letter |
| 4274 | SF6 recovery and reclamation project, South Korea | Fugitive emissions from production and consumption of halocarbons and sulphur hexafluoride | Republic of Korea | 108,609 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Solvay Fluor Korea Co., Ltd.. The beneficiary of all cancelled CERs is Solvay Fluor Korea Co., Ltd.. | 22/07/2019 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 644 | CERs | This voluntary cancellation of CERs was made on behalf of Componentes e Módulos Plásticos - CMP Contagem under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 11 | CERs | Espectáculo Fuegos del Apóstol 2019 | 16/10/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Kickoff Coca-Cola Iberian Partners (digital) | 30/07/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 52 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TÉCNICA VIAL S.A.S (NIT 860.015.067-9), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 1291 | Enercon Wind Farms in Karnataka Bundled Project – 30.40 MW | Energy industries (renewable - / non-renewable sources) | India | 60,052 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 13,966 | CERs | Retirement – Beneficiary: HARISA, S.A. de C.V. El Salvador • Retirement Reason Details: Compensación voluntaria a favor de HARISA, S.A de C.V., El Salvador, para compensar su huella de carbono 2020 / Voluntary compensation from HARISA, S.A. de C.V, El Salvador, to offset GHG emissions related to their 2020 Carbon Footprint. | 02/08/2021 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 77,711 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 15/03/2019 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 30,000 | CERs | Retired on behalf of Signify | 01/09/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,993 | CERs | Retiro a favor de COMERCIALIZADORA PROXXON S.A identificado con NIT 811026709-8 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 18/07/2022 | Attestation letter |
| 0259 | Trupan Biomass Power Plant in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 13,235 | CERs | Cabify Mobility International S.L. Huella Cabufy 2020 | 22/12/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 684 | CERs | Voluntary cancellation of 684 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑÍA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during the second quarter (April - June) of 2018 | 05/12/2018 | Attestation letter |
| 0430 | 12 MW hydropower plant in Bhandardara in Maharashtra, India. | Energy industries (renewable - / non-renewable sources) | India | 26,494 | CERs | Offsetting Carbon Footprints (verified and certified) of the year 2019 for "NV DISTILLERIES and BREWERIES PRIVATE LIMITED", Rajpura Plant, in India, for the purpose of achieving "Carbon Neutral" status for the entire year. | 16/03/2021 | Attestation letter |
| 0752 | Omnia Fertilizer Limited Nitrous Oxide (N2O) Reduction Project | Chemical industries | South Africa | 20,000 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 23/11/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 78 | CERs | Compensación voluntaria emitida por Anaconda Carbon a favor de Popular Pensiones S.A. para compensar las emisiones GHG generadas por sus operaciones durante el año 2019 conforme al Programa País Carbono Neutral 2.0 de la Dirección de Cambio Climático del MINAE | 27/05/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,746 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INDUSTRIA NACIONAL DE GASEOSAS S.A (NIT 890.903.858-7), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 160,000 | CERs | Retired on behalf of Natural Capital Partners clients | 27/01/2022 | Attestation letter |
| 4665 | N2O Abatement Project of Capro Corporation | Chemical industries | Republic of Korea | 143,295 | CERs | Cancelled CERs will turn into be KOCs(Korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea | 08/12/2020 | Attestation letter |
| 4531 | Improving Rural Livelihoods Through Carbon Sequestration By Adopting Environment Friendly Technology based Agroforestry Practices | Afforestation and reforestation | India | 3,668 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds. | 25/06/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 186 | CERs | retired on behalf of NativeEnergy for Bodhi Surf + Yoga | 12/04/2019 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 34,620 | CERs | “Compensação de 34.620 toneladas de CO2 das operações da KPMG no Brasil, sendo 17.627 toneladas de CO2 referentes às emissões de GEE de 2020 e 16.993 toneladas de CO2 referentes às emissões adicionais de 2019” | 12/11/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | OFFSET ON BEHALF OF: Coca-Cola Iberian Partners REASON FOR COMPENSATION: Midyear Meeting Coca-Cola Iberian Partners 2021 | 16/02/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 50 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTADORES BELLA VILLA IOS (NIT 900.562.787-3), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 600 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: WORLD FUEL SERVICES COLOMBIA | 07/09/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 36,963 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: CHEVRON PETROLEUM COMPANY | 07/09/2022 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 1,014 | CERs | Voluntary Cancellation of 1,014 CERs for transaction no. 345 (725 CERs) and 346 (289 CERs) on www.clpcarboncredits.com | 05/07/2019 | Attestation letter |
| 7474 | West Huaybong 3 wind farm project | Energy industries (renewable - / non-renewable sources) | Thailand | 80,091 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients | 19/10/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 66 | CERs | : Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 270 662,00 kms of riders using UberPLANET during August 2021 made by Anaconda Carbon. | 17/09/2021 | Attestation letter |
| 1363 | 5 MW renewable energy project for a grid system” at Rohru Tehsil, Shimla District in Himachal, India | Energy industries (renewable - / non-renewable sources) | India | 23,917 | CERs | Retired on behalf of UBS AG as part of offsetting historical scope 1 & 2 emissions from year 2000 – 2020 | 03/02/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 170 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 170 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 170 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 27/05/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 41,556 | CERs | Cancelación voluntaria a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS (NIT-900497906-5) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 12/08/2021 | Attestation letter |
| 9181 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – India |
Energy industries (renewable - / non-renewable sources)
; Energy demand |
India | 55,620 | CERs | Retirement on behalf of Climate Impact Partners for Customer ID 00080835 | 08/09/2022 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Prof. Rishikesha T. Krishnan Professor, Strategy, Indian Institute of Management, Bangalore (Moderator) . EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 828 | CERs | Voluntary Cancellation of 828 CERs for transaction no. 573 on www.clpcarboncredits.com | 01/07/2020 | Attestation letter |
| 6152 | Coke oven gas comprehensive utilization for co-generation project in Shandong Jikuang Morningsun Thermal Power Co., Ltd |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 33,000 | CERs | Retirement on behalf of Fokus Zukunft GmbH Co. KG | 01/07/2019 | Attestation letter |
| 8921 | Shandong Linyi Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 4 | CERs | Voluntary cancellation for carbon neutrality for Xiamen Jinyuan Group Party Acivities and UN CBD COP 15 Activities in Xiamen | 17/10/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 3 | CERs | This voluntary cancellation of CERs was made on behalf of Saint-Gobain do Brasil / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 71 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 71 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 71 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 29/01/2020 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1,825 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EQUAIR para compensar las emisiones GEI generadas por todos los pasajeros transportados durante el mes de Abril 2022. | 02/06/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 20,518 | CERs | Aposentadoria em nome do Banco do Brasil para neutralização das emissões escopo 01 de 2021 / Retirement on behalf of Banco do Brasil to offset emissions from scope 01 – 2021. | 23/05/2022 | Attestation letter |
| 6488 | Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia | Waste handling and disposal | Malaysia | 15,000 | CERs | L'Oréal Carbon Balanced Program | 26/04/2021 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 2,000 | CERs | Cancelled for the purposes of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 10/11/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 100 | CERs | Compensación voluntaria de emisiones mediante el manejo responsable de residuos de la empresa ESSITY HIGIENE Y SALUD MÉXICO, S.A. de C.V. planta Monterrey (Octubre-Diciembre de 2021) | 06/05/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 6,747 | CERs | 2019-1145 | 2020 | 09/11/2020 | Attestation letter |
| 9740 | MCL wind power project in Tamilnadu, India | Energy industries (renewable - / non-renewable sources) | India | 29,798 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 1797 | 15 MW grid-connected wind power project by MMTC in Karnataka | Energy industries (renewable - / non-renewable sources) | India | 4,200 | CERs | Wienerberger GmbH, Germany, is offsetting GHG emissions associated with the production of premium clay brick products at the production site in Eisenberg/Thüringen in the year 2021 | 08/12/2020 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 3,992 | CERs | ECOCERT 2021 carbon footprint offset | 01/09/2022 | Attestation letter |
| 2801 | N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 2,370 | CERs | on behalf of GP-26 | 09/08/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 100,000 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. | 20/01/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 196 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 196 tons of greenhouse gas (GHG) emissions of the CBO Carolina vessel fuel consumption.” Reference month: August 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 196 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Carolina.” Mês de referência: Agosto de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 26/09/2022 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 10,000 | CERs | Retired on behalf of Climaider | 19/07/2022 | Attestation letter |
| 6003 | Wind power project by Sterling Agro Industries Ltd. | Energy industries (renewable - / non-renewable sources) | India | 37,861 | CERs | “On behalf of Lenovo Clients 1 July 2022 – 31 July 2022, Program Managed by Lenovo.” | 18/08/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 74 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 291 998,0 kms of riders using UberPLANET during November 2020 made by A-CO2 | 14/12/2020 | Attestation letter |
| 1880 | Tiefa Coal Industry Group CMM Utilization Project |
Mining/mineral production
; Energy industries (renewable - / non-renewable sources) ; Fugitive emissions from fuels (solid, oil and gas) |
China | 719 | CERs | Cancelled to neutralize the Carbon Emissions generated by of TV Bracket Production half life cycle. | 25/08/2022 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 15 | CERs | Voluntary Cancellation of 15 CERs for transaction no. 448 on www.clpcarboncredits.com | 17/09/2019 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 9,838 | CERs | Compensación voluntaria de huella de carbono organizacional, Duragas Abastible | 16/06/2022 | Attestation letter |
| 4941 | Uganda Nile Basin Reforestation Project No 4 | Afforestation and reforestation | Uganda | 163 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 07/01/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 2,247 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA S. A. (NIT 860.002.554-8) for the neutralization of 2,247 tons of CO2 associated with fossil fuels to be used by CONSTRUCCIONES EL CONDOR S.A. (NIT 890.922.447-4) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 8981 | Nalcas Small Hydroelectric Run-of-River Power Plant | Energy industries (renewable - / non-renewable sources) | Chile | 9,007 | CERs | Retired on behalf of Buhck Umweltservices GmbH & Co. KG for the offsetting of carbon emissions from 2020 | 15/08/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 700 | CERs | Beneficiary: Cabify Mobility International, S.L. Purpose: Compensación huella Cabify 1er trimestre 2021 | 07/06/2021 | Attestation letter |
| 3246 | 24MW DONG YANG ENERGY PV(photovoltaic) power plant | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 20,817 | CERs | Cancelled CERs will return into be KOCs (Korea offset credits) which can be used in domestic emissions trading scheme of Republic of Korea. | 15/08/2022 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 203,000 | CERs | Towards Delta’s 2020 CN goal | 09/06/2021 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 134 | CERs | Voluntary cancellation in favor of ORGANIZATION TERPEL S.A. (NIT 830.095.213-0)for neutralization of the GHG emissions associated with the fossil fuels to be purchased and used by EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA (NIT 899.999.094-1). | 18/12/2018 | Attestation letter |
| 6143 | EOLO Wind Power Project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 30,000 | CERs | Retirement – Beneficiary: Numerco Limited Retirement Reason Details: CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 17/12/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 93 | CERs | Beneficiary: FACO (Franz Amrhein y Compañía) S.A. Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compañía) S.A. to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of November 2018. For more information visit: www.hondacostarica.com/co2 | 18/01/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 20,000 | CERs | Cancelación voluntaria a favor de ZEUSS PETROLEUM SAS (NIT 811043174-1) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 21/12/2021 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 46,776 | CERs | on behalf of ClimatePartner | 12/12/2018 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 7 | CERs | Voluntary Cancellation of 7 CERs for transaction no. 550 on www.clpcarboncredits.com | 12/06/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | Reunión de Directivos de ACCIONA 2018 | 25/09/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Purpose and/or beneficiary of the cancellation: Murph Media Group S.L. Reason for cancellation: offsetting the tonnes of carbon emitted during 2021 | 14/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 5,997 | CERs | 2019-1436 | 2020 | 09/11/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Dheeraj Verma,GM EHS and Sustainability JCB India Limited. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Sumeet Mazumdar,Member of Management Board - COO Voith Hydro Private Limited . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Build King - Samsung C&T Joint Venture” for Annual Dinner in 2021 (Transaction ID: 694) | 18/02/2021 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 2,000 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by A-CO2 | 22/11/2021 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 100,000 | CERs | Voluntary cancellation made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of NATURA COSMETICOS S.A., to offset CO2 emissions related to the reported GHG Emissions from 2019. | 25/11/2020 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 200,000 | CERs | Retired on behalf of Simply Energy ABN 67 269 241 237 as part of its carbon neutral commitments under Climate Active (retail electricity) for products sold between 1 July 2021 and 30 June 2022. | 07/01/2022 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 981 | CERs | Retirement Beneficiary - WILDFIRE FLOWERS | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 06/10/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 33 | CERs | OFFSET ON BEHALF OF: ENTRECANALES DOMECQ E HIJOS REASON FOR COMPENSATION: Compensación de Huella de Carbono del producto Coral de Peñascal de Entrecanales Domecq e Hijos | 31/08/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 130 | CERs | MV0072 | 2020 | 16/12/2020 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 20,797 | CERs | Huella Cabify 2020 | 15/12/2020 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 15 | CERs | Voluntary carbon footprint offset of GHG emissions related to product deliveries made by CASA ISABEL during the months of July and August 2020. | 31/08/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 221 | CERs | Voluntary cancellation made by CONCESIONARIA VUELA COMPAÑÍA DE AVIACIÓN, S.A.P.I DE C.V. (VOLARIS) during third quarter (July-September) of 2019 | 05/05/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 411 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 1 966 775,00 kms of riders using UberX during December 2021 made by Anaconda Carbon. | 14/01/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 228 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by ORGANIZACIÓN SOLARTE Y CIA (NIT 800.146.425-6, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 3069 | Wangjiang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 57,272 | CERs | Voluntary cancellation on behalf of Carbonfund.org Foundation partner | 17/01/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 250 | CERs | Purpose: I am offsetting the carbon footprint of my clients Beneficiary: Gorman- Rupp Europe B.V. | 07/06/2021 | Attestation letter |
| 2105 | Sichuan Erdaoqiao Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 18,123 | CERs | To offset emissions for Trees4Travel clients | 02/09/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 100 | tCERs | Carbon removal credits for voluntary climate action - TR 57 | 22/12/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 417 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of April 2019 | 07/05/2019 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,343 | CERs | Voluntary cancellation in favour of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia S.A. (NIT 891300238-6), in order to not cause the national carbon tax. | 15/02/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 960 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Coopelesca R.L. para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad y el PPCN de la Dirección de Cambio Climático | 29/10/2020 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1 | CERs | Cancellation on behalf of EFS SAS to offset the carbon footprint of other indirect emissions (Scope 3) | 30/06/2022 | Attestation letter |
| 7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | Energy industries (renewable - / non-renewable sources) | Madagascar, Ethiopia, Kenya, Malawi, Mozambique, Nigeria, Uganda, Zambia, Chad, Dominican Republic, Côte d`Ivoire, Liberia, Rwanda, Sierra Leone, Namibia, Zimbabwe, Ghana, South Africa, Somalia | 14,761 | CERs | CERs that the UK purchases from the Ci-Dev portfolio are cancelled per the Request for Cancellation Letter to the Trustee dated August 22, 2019 | 02/09/2019 | Attestation letter |
| 1139 | Bagasse based Cogeneration Project at Pudukkottai Tamil Nadu, India | Energy industries (renewable - / non-renewable sources) | India | 18,571 | CERs | Retirement – Beneficiary: Bangalore International Airport Ltd., (BIAL) is responsible for operation, management and development of Kempegowda International Airport, Bengaluru(KIAB), Devanahalli, Karnataka State, India. BIAL is fully committed for climate change mitigation and to ensure sustainable development of KIAB. Since 2011, BIAL has been participating in Airport Council International’s (ACI) Airport Carbon Accreditation Programme for greenhouse gas emissions management. KIAB achieved “Level-2 : Reduction” in 2012 and “Level 3 : Optimization” in 2013 under this Programme. KIAB achieved the accreditation level “Level-3+ : Carbon Neutrality” in 2017 and continue and sustain Level 3+ by offsetting its Scope 1, Scope 2 and Scope 3 (staff business travel) emissions for the year 2019, by purchasing 18570.8 Certified Emission Reductions (equivalent to 18570.8 tons of CO2). | 24/09/2020 | Attestation letter |
| 10261 | Oeste de Caucaia Landfill Project Activity | Waste handling and disposal | Brazil | 75,069 | CERs | Retired on behalf of Ecosecurities Group for conversion into Verified Carbon Units | 08/04/2022 | Attestation letter |
| 6817 | Associated Gas Recovery and Utilization at Block 9 | Fugitive emissions from fuels (solid, oil and gas) | Oman | 500 | CERs | Cancelled for the purposes of taking into account to the mandatory reduction of greenhouse gas emissions from fuels according to the Fuel Quality Directive in the Czech Republic. | 07/12/2020 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | Mitigación de la huella de carbono de Víctor Hugo García Lara | 05/05/2022 | Attestation letter |
| 0752 | Omnia Fertilizer Limited Nitrous Oxide (N2O) Reduction Project | Chemical industries | South Africa | 20,201 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019, for organization WeAct Pty Ltd, to be listed in COAS Account number 101017. | 23/11/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 8,373 | CERs | Retiro a favor de PETROLEOS Y DERIVADOS DE COLOMBIA SA identificado con NIT 900.135.202-6 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 20/01/2022 | Attestation letter |
| 3089 | Yicheng Biomass Cogeneration Project in Hubei Province, China | Energy industries (renewable - / non-renewable sources) | China | 262 | CERs | CO2-neutraler Erdgasbezug für die durch die Hamburg Team Property Management GmbH verwalteten Liegenschaften in 2022-2025 | 06/12/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 629 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EQUAIR para compensar las emisiones GEI generadas por todos los pasajeros transportados durante el mes de enero 2022 | 10/03/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 1,437 | CERs | Klimapositiver Geschäftsbetrieb der MATSEN CHEMIE AG im Jahr 2021 und klimaneutrale Chemieprodukte. Dieses Zertifikat bestätigt hierzu die Neutralisierung von 1437 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 1437 Gold Standard CERs des Projekts "Solar Water Heater Program in India" aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 18/07/2022 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 200 | CERs | Meta Lion Circle - Compensation of Ethereum (ETH) blockchain transactions of the Meta Lion Circle NFT Collection - Part 1 | 23/02/2022 | Attestation letter |
| 0328 | Dolowal, Salar and Bhanubhura Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 2,265 | CERs | Cancelled on behalf of Engie SA to offer a reduced carbon product to its B2B customers in France | 02/11/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 14 | 22/12/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 582 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - month of July 2019 | 09/08/2019 | Attestation letter |
| 6143 | EOLO Wind Power Project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 1,386 | CERs | These credits have been retired on behalf of Altered State Machine, for the purpose of offsetting the associated carbon emissions of minting NFT's on Ethereum. | 05/07/2022 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 39 | CERs | compensation of Carbon Footprint for year 2019 of Acciona Concesiones | 18/05/2020 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 1,933 | CERs | Scandbook - offsetting 2440 tons CO2e for Scope 1 & 2 emissions and offsetting of emissions from book production on behalf of clients. | 29/12/2021 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 4,742 | CERs | Scandbook - offsetting Scope 1, 2 and 3 emissions for climate neutrality. | 29/12/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 1 | CERs | AHK China - Econet Monitor publication offset 2H 2021 | 15/03/2022 | Attestation letter |
| 1026 | A.T. Biopower Rice Husk Power Project in Pichit, Thailand | Energy industries (renewable - / non-renewable sources) | Thailand | 157,440 | CERs | For the purpose of offsetting the emissions of the gas clients of Eni Gas & Power France S.A. | 27/09/2021 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 463 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 463 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 463Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 15/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 53 | CERs | Retirement – Beneficiary: RENTE UN AUTO ESMERALDA, S.A. - Retirement Reason Details: Voluntary Cancellation on behalf of Rente un auto Esmeralda S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st, to December 31st, 2018. | 31/01/2020 | Attestation letter |
| 1151 | KSPCL Waste Heat to Power project, India | Energy industries (renewable - / non-renewable sources) | India | 20,039 | CERs | Retired on behalf of FZ. | 28/03/2022 | Attestation letter |
| 8759 | Providencia III: 9.11MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 5,600 | CERs | Purpose: to offset the Colombian Carbon Tax under Decree 926 of 2017. Beneficiary: Mineros Aluvial S.A.S. BIC with corporate identification number (NIT) 901.218.630-6 | 27/01/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mott MacDonald. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 10,000 | CERs | Voluntary cancellation of CDM Gold Standards CERs to offset German emissions of – Land Hesse 2020 | 29/11/2021 | Attestation letter |
| 2513 | Luoyang Landfill Site LFG Recovery to Electricity Project | Waste handling and disposal | China | 60,907 | CERs | Cancelled on behalf of STX client with ID number: POS-30481-39536 for 2022/2023 usage. | 16/03/2022 | Attestation letter |
| 1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 266 | CERs | To Neutralize the Carbon Emission generated by Luoyang Xinding Furniture Co., Ltd in 2021 | 11/03/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10 | tCERs | Plantar Carbon | 30/12/2020 | Attestation letter |
| 9176 | Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” | Energy demand | Honduras | 919 | CERs | Cancellation on behalf of Löfbergs Lila AB | 08/06/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Jakson Group. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 8 | CERs | Stand ACCIONA Inmobiliaria, SIMA 2019 | 05/02/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Beneficiario: CAAE S.L.U. Razón: I am offsetting the carbon footprint of my company's trips | 17/12/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,480 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor del Conglomerado Banco Nacional de Costa Rica para compensar las emisiones GEI generadas por la huella operacional en Costa Rica del durante el año 2020, y cumplir con los requisitos del PPCN. | 18/05/2021 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 60 | CERs | Sustainable Planet Holdings Ltd offsetting the carbon footprint of my clients | 19/10/2021 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 7 | CERs | Voluntary cancellation of 7 CERs to offset the emissions of the British Embassy of Lima, event:¨”Bonos Verdes Perú 2018” which took place the 7th of November of 2018 in Lima, Peru. | 05/12/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 38 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRANSPORTES INTEGRADOS METROPOLITANOS (NIT 900.297.797-0, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Vivek Singhal,Senior Vice President – Global Quality, HSE & Operational Excellence Sterlite Power. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 146 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by AGREGADOS DE LA SIERRA (NIT 900.318.997-9, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 710 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COLVANES (NIT 800.185.306-4), in order to not cause the national carbon tax | 21/12/2018 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 11,747 | CERs | 2019-1391 | 2020 | 09/11/2020 | Attestation letter |
| 9376 | Wind Power Project at Tadas, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 7,673 | CERs | Beneficial Owner: Telstra Corporation Limited / Retirement reason details: Climate Active Certification | 21/06/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | OFFSET ON BEHALF OF: Ora Labora Studio REASON FOR COMPENSATION: Offsetting double the tonnes of carbon emitted during 2021 | 16/02/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 2 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Skyview Costa Rica para compensar las emisiones GEI generadas por 9 horas de vuelo en CESSNA C206 y Robinson R44, durante el mes de diciembre 2021 | 24/02/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 351,696 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 21/01/2022 | Attestation letter |
| 8438 | Clean Cook Stoves in Sub-Saharan Africa by ClimateCare Limited | Energy demand | Ghana, Kenya | 951 | CERs | „Retired for SPW's Climate Positive Impact April-June 2022“. These have not been used for any offsetting purposes or mandatory or voluntary compliance purpose. | 28/06/2022 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 85 | CERs | Beneficiary: Asociación Coalición Costarricense de Iniciativas de Desarrollo (CINDE) Retirement reason: Voluntary Cancellation on behalf of Asociación Coalición Costarricense de Iniciativas de Desarrollo (CINDE) for its Greenhouse Gas (GHG) management strategy as required by the Costan Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018. | 26/04/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 10 | CERs | Retirement reason details: Cancelación voluntaria llevada a cabo por Anaconda Carbon a favor de la Asociación Costa Rica Design Advisers, para compensar las emisiones GEI generadas por su evento de 80 asistentes y expositores, para el Seminario Materiales para Edificios Sostenibles, el cual se llevó a cabo el día 4 de abril de 2019 en el Hotel Wyndham Escazú. | 28/05/2019 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Wings & Associates Consulting Engineers Limited” for Annual Dinner in 2021 (Transaction ID: 706) | 18/02/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1 | CERs | OFFSET ON BEHALF OF: CLIMATETRADE SL REASON FOR COMPENSATION: I am offsetting the carbon footprint of my company's trips | 04/02/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 14,978 | CERs | 2019-0864 | 2020 | 09/11/2020 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 746 | CERs | Cool Effect August 2022 Platform Sales: SOTLANDFILL2019 | 29/09/2022 | Attestation letter |
| 3599 | Bajo Tuluá Minor Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 16,669 | CERs | Voluntary cancellation in favor of PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) for the neutralization of 16,669 tons of CO2 associated with fossil fuels to be used by PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) in order not to cause the national carbon tax. | 05/09/2019 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 322 | CERs | on behalf of Skyscanner | 06/01/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 1 | CERs | Compensación Carbono | Jordania 27 diciembre -3 enero | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 13/01/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 133 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Cancelación Voluntaria hecha por Anaconda Carbon a favor del Conglomerado Banco Nacional de Costa Rica para compensar las emisiones GEI generadas durante el año 2018 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático | 17/06/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon credits available for voluntary uses - TR 8 | 22/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,460 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COLTANQUES (NIT 860.040.576-1), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 1,228 | CERs | Purpose: Programa Correos Compensa Beneficiary: Sociedad Estatal Correos y Telegrafos S.A. | 21/10/2020 | Attestation letter |
| 7873 | 27.3 MW Wind energy farm at Mokla Rajasthan by HZL | Energy industries (renewable - / non-renewable sources) | India | 18,699 | CERs | Retirement Beneficiary : Flamingo Horticulture Investments Ltd, Reason - I want to contribute to Climate Action. | 09/03/2021 | Attestation letter |
| 5554 | Grid connected electricity generation using natural gas by Lanco Kondapalli Power Private Limited | Energy industries (renewable - / non-renewable sources) | India | 72,529 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 3773 | Olkaria II Geothermal Expansion Project | Energy industries (renewable - / non-renewable sources) | Kenya | 111 | CERs | Cancellation per request from Nordjysk Elhandel A/S | 03/09/2019 | Attestation letter |
| 3404 | Rwanda Electrogaz Compact Fluorescent Lamp (CFL) distribution project | Energy demand | Rwanda | 88 | CERs | Cancellation per request from Aalborg Portland A/S | 03/09/2019 | Attestation letter |
| 3404 | Rwanda Electrogaz Compact Fluorescent Lamp (CFL) distribution project | Energy demand | Rwanda | 70 | CERs | Cancellation per request from Nordjysk Elhandel A/S | 03/09/2019 | Attestation letter |
| 7981 | 25.5 MW Wind Energy Farm at Nandurbar Maharashtra by HZL | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Beneficiary Name: EnKing International (EKI Energy Services Limited) Remarks: “Offsetting our Carbon Footprint for FY 2019-20”. | 13/08/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 95 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 377 395,0 kms of riders using UberPLANET during October 2020 made by A-CO2 | 23/11/2020 | Attestation letter |
| 1456 | 5 MW Wind Power Project of Alembic Ltd at Bhavnagar , Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 15,963 | CERs | Retirement Beneficiary - AFRIFLORA, Reason for cancellation - I want to contribute to climate action. | 12/07/2021 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 45,482 | CERs | Voluntary cancellation of CERs in favor of iSi GmbH to offset GHG emissions | 21/06/2022 | Attestation letter |
| 0085 | Hapugastenne and Hulu Ganga Small Hydropower Projects. | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 8,314 | CERs | Voluntary cancellation on behalf of Natural Capital Partners' client. | 09/05/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | Eu, Sandro Carvalho Marani, compensei minha pegada de carbono! | 21/10/2022 | Attestation letter |
| 9798 | Suba and Usaquen hydroelectric CDM umbrella project | Energy industries (renewable - / non-renewable sources) | Colombia | 769 | CERs | Voluntary cancellation in favor of Distribuidora Andina de Combustibles S.A (NIT 860002554-8) for neutralization of the GHG emissions associated with fossil fuels used by Ingenio Carmelita S.A (NIT 891900196-1), in order to not cause the national carbon tax. | 13/12/2018 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 182 | CERs | Festival de Cannes | 05/04/2022 | Attestation letter |
| 3531 | Adavikanda, Kuruwita Division Mini Hydro Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 7,401 | CERs | “Voluntary cancellation of 7,401 CERs for the purpose of conversion to Gold Standard VERs from project GS6051. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose.” | 30/06/2021 | Attestation letter |
| 10070 | Punta Palmeras Wind Power Project | Energy industries (renewable - / non-renewable sources) | Chile | 3,745 | CERs | Offset on behalf of: CABIFY MATRIZ, S.L.U. Reason for Compensation: HUELLA CABIFY 2021 | 12/01/2022 | Attestation letter |
| 1575 | Kadamane Mini Hydel Scheme-1 (KMHS-1) | Energy industries (renewable - / non-renewable sources) | India | 6,001 | CERs | Voluntary carbon offsetting - transaction no. CE-202208601 | 29/08/2022 | Attestation letter |
| 3072 | Hunan Yiyang Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 74,309 | CERs | Cancelled on behalf of STX client with ID number: POS-30478-39534 for 2022/2023 usage | 15/03/2022 | Attestation letter |
| 5909 | Inner Mongolia China Water Group Huade Cheliwusu Wind Farm 49.5MW Project | Energy industries (renewable - / non-renewable sources) | China | 123,034 | CERs | Entwertung der CO2-Zertfikate (CP2 CER) für Grüngasprodukte von Eprimo | 27/08/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 5,200 | CERs | Cancelación voluntaria en favor de PetStar por las emisiones directas generadas en sus operaciones durante 2018 | 03/06/2019 | Attestation letter |
| 9973 | Biomass based power plant in Mahendargarh, Haryana | Energy industries (renewable - / non-renewable sources) | India | 335 | CERs | I am offsetting green house gas emissions for my company | 29/05/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 275,040 | CERs | Compensation of carbon footprint for year 2018 of Acciona Agua | 12/06/2019 | Attestation letter |
| 6588 | Dos Mares Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Panama | 231,537 | CERs | Voluntary Cancellation in favor of CELSIA S.A (Nit 811030322-7) for the neutralization voluntary of 231537 Ton CO2 corresponding to total emissions for the year 2021. | 19/04/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 29,729 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL S.A identificado con NIT 830.095.213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ORGANIZACIÓN TERPEL S.A | 12/10/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Statcon Energiaa Private Limited . EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 563 | CERs | Klimapositiver Geschäftsbetrieb der MATSEN CHEMIE AG im Jahr 2021 und klimaneutrale Chemieprodukte. Dieses Zertifikat bestätigt hierzu die Neutralisierung von 563 Tonnen CO2-Äquivalent durch die freiwillige und unwiderrufliche Löschung von 563 Gold Standard CERs des Projekts "Solar Water Heater Program in India" aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 18/07/2022 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 500 | CERs | Cancellation on behalf of Sean Dennis to OFFSET PERSONAL LIFETIME CARBON EMISSIONS FOOTPRINT (UP TO 2022) | 03/08/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 23 | CERs | Für 54 klimaneutrale Flüge in 2019 sowie die CO2-Kompensation einer siebentägigen Kreuzfahrt für 2 Personen, wird für Frau Renate Grambow und Herrn Gerhard Grambow der Ausgleich von 23 Tonnen Co2-äquivalent vorgenommen. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 23 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 19/12/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,444 | CERs | Retirement Reason Details: For Climate Neutrality purposes | 01/09/2020 | Attestation letter |
| 0922 | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of Korea | Chemical industries | Republic of Korea | 298,242 | CERs | CERs to be cancelled in exchange for Korean Offset Credits(KOC), issued by Korean Offset by Korean Offset Program to hanwha Crop. The beneficiary of CERs cancelled is Hanwha Corp. | 08/01/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Professor Xiangdong Li” for Annual Dinner in 2021 (Transaction ID: 748) | 22/02/2021 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 60 | CERs | Retired on behalf of Arthur Mining to backup their impressive pledge to become a carbon negative bitcoin mining company by 2025. | 13/01/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 1,747 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia S.A. (NIT 891300238-6), in order to not cause the national carbon tax. | 18/04/2019 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 14 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de PANELTECH S.A para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 14/10/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 323 | CERs | on behalf of INDY | 05/01/2021 | Attestation letter |
| 5341 | Improved Cooking Stoves Programme of Activities in Africa | Energy demand | Kenya, South Africa | 12,847 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. Is beneficiary of this cancellation. | 27/10/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Build King Holdings Limited” for Annual Dinner in 2021 (Transaction ID: 693) | 18/02/2021 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 100,000 | CERs | Retired on behalf of ClimatePartner’s customers. | 22/12/2021 | Attestation letter |
| 4140 | Shenmu County Hengsheng Coal Chemical Co., Ltd. 30MW Semi-coke Waste Gas Power Generation Project |
Energy industries (renewable - / non-renewable sources)
; Manufacturing industries |
China | 3,800 | CERs | Retired on behalf of Sustainable Travel International. | 08/06/2022 | Attestation letter |
| 10430 | Man and Man Enterprise Improved Cooking Stoves CDM Programme in Ghana supported by Republic of Korea | Energy demand | Ghana | 50,333 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation | 30/09/2021 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 1,578 | CERs | Retired on behalf of Azure Power Global to become Carbon Neutral for year 2020-21. | 07/01/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 5 | CERs | Retired on behalf of Green Story Inc's clients to offset the carbon footprint of their products for July 2021 sales | 09/08/2021 | Attestation letter |
| 0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | Chemical industries | Republic of Korea | 334,247 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 02/06/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 82 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de EQUAIR para compensar las emisiones GEI generadas por todos los pasajeros transportados durante el mes de Abril 2022. | 01/06/2022 | Attestation letter |
| 0404 | Irani Biomass Electricity Generation Project | Energy industries (renewable - / non-renewable sources) | Brazil | 28,175 | CERs | Purpose: Retirada permanente de circulação do mercado em nome da Natura Cosméticos S.A./ Retirement on behalf of Natura Cosméticos S.A”. Beneficiary: Natura Cosméticos S.A | 16/11/2020 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 7,580 | CERs | Voluntary Cancellation of 7,580 CERs for Transaction ID 1029 (PBSL) | 15/06/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Professor C W Lim” for Annual Dinner in 2021 (Transaction ID: 750) | 22/02/2021 | Attestation letter |
| 0775 | West Nile Electrification Project (WNEP) | Energy industries (renewable - / non-renewable sources) | Uganda | 1,773 | CERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Carbon Funds. | 04/06/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 13,375 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Termoencogibles, S.A. de C.V. para compensar la generacion de GEI derivada de sus operaciones para el año 2020. | 15/04/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 10,000 | CERs | Cancelación voluntaria a favor de PUMA ENERGY COLOMBIA COMBUSTIBLES SAS (NIT-900497906-5) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles. | 18/06/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 45 | CERs | Voluntary cancellation to offset the GHG (estimated) generated from operations of SHAOGUAN RURAL COMMERCIAL BANK CO.,LTD. WUZULU SUB-BRANCH from January 1, 2022 to December 31, 2022. | 16/03/2022 | Attestation letter |
| 1410 | Irani Wastewater Methane Avoidance Project | Waste handling and disposal | Brazil | 32,837 | CERs | “Retirada permanente de circulação do mercado em nome das Lojas Renner S.A./ Retirement on behalf of Lojas Renner S.A”. | 23/11/2020 | Attestation letter |
| 2513 | Luoyang Landfill Site LFG Recovery to Electricity Project | Waste handling and disposal | China | 17,633 | CERs | Cancelled on behalf of STX client with ID number: POS-30481-39536 for 2022/2023 usage. | 16/03/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 26,004 | CERs | Wah Kwong Maritime Transport Holdings Limited for 2021 Internal Carbon Offset | 15/06/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Continental Carbon India Ltd .EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | Waste handling and disposal | Brazil | 18,990 | CERs | For DL 2021 Carbon Neutrality | 06/01/2022 | Attestation letter |
| 2247 | 13.25 MW Wind Power Generation by RMTL, in Kutch, Gujarat | Energy industries (renewable - / non-renewable sources) | India | 25,132 | CERs | Retirement Beneficiary - AlixPartners | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 29/07/2021 | Attestation letter |
| 4844 | Zhangjiakou Chabei Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 216,595 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 12/03/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 50,000 | tCERs | Carbon removal credits for voluntary climate action - TR 9 | 22/12/2020 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 69,500 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 137 | CERs | Voluntary cancellation made by Anaconda Carbon S.A. on behalf of FACO (Franz Amrhein y Compañía S.A.) to offset emissions generated by 10,000 kilometers of new Honda vehicles sold by FACO in the month of September 2018. For more information please visit: www.hondacostarica.com/co2 | 02/01/2019 | Attestation letter |
| 4470 | 9.6 MW Wind Energy Project at Jamvadi & Navagam & Kalavad, Jamnagar, Gujarat, India of Rohit Surfactants Pvt. Ltd. | Energy industries (renewable - / non-renewable sources) | India | 36,685 | CERs | Retirement Beneficiary - Zomato Limited, Reason for cancellation - Offsetting greenhouse gas emissions. | 02/06/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 2 | CERs | Stand Agua IWS Abu Dhabi 2020 | 07/04/2020 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 2,379 | CERs | Compra de 2,379 CERs para compensación de emisiones de la Huella de Carbono Corporativa de Produbanco. | 02/11/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6 | CERs | Voluntary compensation made by Anaconda Carbon on behalf of baula.eco to offset all GHG emissions generated from their operation during the period of 2020 | 09/03/2021 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 10,000 | tCERs | C.B.I. S.L. | 12/09/2019 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 67,376 | CERs | Cancelled on behalf of the Foundation "Zukunft des Kohlenstoffmarktes" | 09/06/2021 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 15,845 | tCERs | Cancellation for conversion to VCUs. | 14/12/2020 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 1 | CERs | Offsetting Carbon Footprints (verified and certified) for "Zomato Private Limited", Gurgaon (Haryana), India, for the purpose of achieving Carbon Neutrality | 09/04/2021 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 451 | CERs | Voluntary cancellation of 451 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-26 | 09/05/2022 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 564 | CERs | Retired on behalf of UTEM para su Certificación SCX CO2 Neutral – Organización 2020 - ID 0120-E6383B04” | 26/04/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 4 | CERs | Compensación voluntaria a favor de COCA-COLA FEMSA DE PANAMA / VENTAS Y MERCADEO, S.A. por la neutralización de 4tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 3611 | Roaring 40’s Wind Farms (Khandke) Private Limited – Phase III | Energy industries (renewable - / non-renewable sources) | India | 40 | CERs | Voluntary Cancellation of 40 CERs to appreciate respective stakeholders to provide feedbacks on Annual Report (transaction no. 599 to 608 on www.clpcarboncredits.com) | 17/11/2020 | Attestation letter |
| 2965 | 5 MW Debal Grid-connected Hydroelectric Project in Uttaranchal, India | Energy industries (renewable - / non-renewable sources) | India | 15,052 | CERs | Retired on behalf of UBS AG as part of offsetting historical scope 1 & 2 emissions from year 2000 – 2020 | 28/01/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 763 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COORDINADORA DE TANQUES S.A.S (NIT 811.016.822), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 2,521 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor del Conglomerado Banco Nacional de Costa Rica para compensar las emisiones GEI generadas por la huella operacional en Costa Rica del durante el año 2019, y cumplir con los requisitos del PPCN. | 12/05/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 2,062 | CERs | Herbert Smith Freehill's offsetting of business travel for Financial Year 2021/22. | 09/08/2022 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 1 | CERs | Voluntary cancellation in favour of iSi GmbH, Vienna, Austria | 17/09/2021 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 104,980 | CERs | Retired on behalf of Eni Gas and Power to offset carbon footprint of its clients | 17/09/2021 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 495 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 31/07/2019 | Attestation letter |
| 4930 | Vaayu India Wind Power Project in Tamilnadu | Energy industries (renewable - / non-renewable sources) | India | 87,948 | CERs | Voluntarily cancellation of 87,948 CERs for conversion to Gold Standard VERs for project GS4425. These units have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 06/07/2020 | Attestation letter |
| 1145 | 8.75MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 300 | CERs | Retirement Beneficiary - Hockerill Anglo-European College | Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION | 26/07/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 270 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de Cooperativa de Ahorro y Crédito Ande No. 1 R.L. para compensar las emisiones GEI generadas durante el año 2019 y cumplir con la Declaratoria de Carbono Neutralidad de la Dirección de Cambio Climático y el PPCN | 22/09/2020 | Attestation letter |
| 1247 | URBAM/ARAUNA - Landfill Gas Project (UALGP) | Waste handling and disposal | Brazil | 182,627 | CERs | Compensação voluntária das emissões de CO2 dos veículos financiados pelo BV – Banco Votorantim S.A. | 25/08/2021 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 6 | CERs | Consejo Superior de los Colegios de arquitectos de España- I am offsetting the carbon footprint of my company's trips. | 18/08/2021 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 6,171 | CERs | Voluntary cancellation made by KPMG Cárdenas Dosal S.C. to neutralize the carbon footprint of all its operations originated in 2019. | 18/11/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 81 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 332 435,00 kms of riders using UberPLANET during June 2021 made by Anaconda Carbon. | 26/07/2021 | Attestation letter |
| 8414 | Potrero Hydropower Plant, Peru | Energy industries (renewable - / non-renewable sources) | Peru | 1,950 | CERs | Voluntary compensation from Uber Planet Perú to offset GHG emissions made by A-CO2 | 17/08/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 56 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860005223-9 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 16/03/2022 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 21,818 | CERs | Aposentado em nome da Ecorodovias Concessões e Serviços S.A. a fim de compensar as emissões de Gases de Efeito Estufa (GEE) diretas de suas operações (Escopo 1), indiretas pelo consumo de energia elétrica (Escopo 2) e outras emissões indiretas relacionadas ao transporte de seus colaboradores (Escopo 3) do ano de 2020. | 11/05/2022 | Attestation letter |
| 5894 | Oaxaca II Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Mitigación de la Huella de Carbono de Carlos Arturo Higuera Villanueva | 09/06/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 2 | tCERs | Eu, Lucas Paz Bezerra, compensei minha pegada de carbono! | 14/10/2022 | Attestation letter |
| 6143 | EOLO Wind Power Project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 2,000 | CERs | These credits have been retired on behalf of Altered State Machine, for the purpose of offsetting the associated carbon emissions of minting NFT's on Ethereum. | 21/06/2022 | Attestation letter |
| 2688 | Fugong Labuluo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 25,686 | CERs | Voluntary cancellation by YUEYANG FOREST & PAPER CO.,LTD. (Unified Social Credit Identifier: 914306007225877126) to offset GHG Emissions generated from its manufacturing process. | 14/04/2022 | Attestation letter |
| 8759 | Providencia III: 9.11MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 15,100 | CERs | Purpose: to offset the Colombian carbon tax under decree 926 of 2017. Beneficiary: ORGANIZACIÓN TERPEL SA, with corporate identification number (NIT) 830095213-0. | 19/08/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 10,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT 901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 14/07/2021 | Attestation letter |
| 1800 | Cristalino Small Hydroelectric Power Plant (hereafter referred to as “CristalSHP”) | Energy industries (renewable - / non-renewable sources) | Brazil | 1,302 | CERs | Lote 85: Neutralize Carbono CNPJ nº 11.639.463/000114. Neutralização das emissões corporativas de escopo 1 e 2 da empresa D´ARTHY EDITORA E GRÁFICA LTDA. Emissões referentes ao Inventário do ano de 2017. | 14/10/2019 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 7,500 | CERs | Voluntary cancellation of CDM CERs on behalf of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. | 20/05/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor de GRUPO DANISSA para compensar las emisiones GEI del voluntariado Volcán Poas (PV Agencia Datsun Sabana, CEDI y Avis Alajuela) | 29/09/2022 | Attestation letter |
| 1139 | Bagasse based Cogeneration Project at Pudukkottai Tamil Nadu, India | Energy industries (renewable - / non-renewable sources) | India | 14,144 | CERs | Bangalore International Airport Ltd., (BIAL) is responsible for operation, management and development of Kempegowda International Airport, Bengaluru(KIAB), Devanahalli, Karnataka State, India. BIAL is fully committed for climate change mitigation and to ensure sustainable development of KIAB. Since 2011, BIAL has been participating in Airport Council International’s (ACI) Airport Carbon Accreditation Program for greenhouse gas emissions management. KIAB achieved “Level-2 : Reduction” in 2012 and “Level 3 : Optimization” in 2013 under this Program. KIAB achieved the accreditation level “Level-3+ : Carbon Neutrality” in 2017 and continue and sustain Level 3+ by offsetting its Scope 1, Scope 2 and Scope 3 (staff business travel) emissions for the year 2020, by purchasing 14144 Certified Emission Reductions (equivalent to 14144 tons of CO2). | 01/07/2021 | Attestation letter |
| 3531 | Adavikanda, Kuruwita Division Mini Hydro Power Project | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 3,998 | CERs | Presented to: LB Finance PLC Reason for cancellation: To achieve the carbon neutrality of LB Finance PLC for the financial year 2018/19, assessed by Climate Smart Initiatives (Pvt) Ltd. | 21/05/2019 | Attestation letter |
| 10524 | 70MW Solar Power Plant Project in Ba Ria - Vung Tau, Vietnam | Energy industries (renewable - / non-renewable sources) | Viet Nam | 23,648 | CERs | The canceled CER will be used as a Korean Offset Credits(KOC) in Korean Offset Program. SH Power Co.,Ltd. is beneficiary of this cancellation. | 29/06/2021 | Attestation letter |
| 0107 | BII NEE STIPA | Energy industries (renewable - / non-renewable sources) | Mexico | 266 | CERs | Voluntary cancellation of 266 CERs conducted by Enel Green Power on behalf of Stipa Nayaa, S.A. de C.V. (Stipa Nayaa wind farm) to offset the CO2 emissions of GP-10 | 25/02/2022 | Attestation letter |
| 6637 | „Reduction of N2O emissions from the new nitric acid plant #5 of Hu-Chems Fine Chemical Corp.“ | Chemical industries | Republic of Korea | 64,630 | CERs | CERs cancellation in exchange for Korean Offset Credits (KOC) to be issued by Korean Offset Program (KOP) to Hu-Chems Fine Corp.. CERs are cancelled for the benefit of Hu-Chems Fine Chemical Corp. | 20/03/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 300,000 | CERs | Para la no causación del Impuesto al Carbono en los meses de enero, febrero y marzo de 2021 de Biomax S.A. NIT 830.136.799-1. | 15/12/2020 | Attestation letter |
| 8018 | SHPPs Jorge Dreher and Henrique Kotzian CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 15,797 | CERs | Purpose: Retirada permanente de circulação do mercado em nome da GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. referente a neutralização das emissões corporativas de Escopo 3 do ano de 2019. Beneficiary: GLOBO COMUNICAÇÃO E PARTICIPAÇÕES S.A. | 17/11/2020 | Attestation letter |
| 0961 | Sasol Nitrous Oxide Abatement Project | Chemical industries | South Africa | 428,540 | CERs | The request for voluntary cancellation is made for the purposes of utilising a carbon offset in accordance with Section 13 of the South African Carbon Tax Act and the Regulations on carbon offsets under Section 19 of the Carbon Tax Act, Regulations of 2019 as published in GN 1556 GG 42873 on 29 November 2019 for the organisation named Sasol South Africa Limited, with the carbon offset administration system account number 101044, into which the offsets must be listed. | 10/06/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 398 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - Mopar Betim under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 3 | CERs | Espectáculo X Aniversario Patrimonio Humanidad Torre Hércules | 16/10/2019 | Attestation letter |
| 3520 | Federal Intertrade Haiyuan Solar Cooker Project | Energy industries (renewable - / non-renewable sources) | China | 9,845 | CERs | Retirement on behalf of Gothaer Versicherungsbank VVaG to become climate neutral 2020 | 08/07/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 769 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 769 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 769 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 23/10/2019 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 5,612 | CERs | Retired on behalf of SODIMAC Chile - Despachos CO2 Neutral 2021 - SCX ID 0104-E1004A86. | 22/02/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 5 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de AGENCIA DATSUN SABANA para la acreditación de Bandera Azul del Punto de Venta Ag. Datsun Curridabat para periodo 2020 | 14/04/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 14 | CERs | Cancelacion voluntaria realizada por Anaconda Carbon a favor de Aero Caribe S.A para compensar las emisiones GEI generadas por 61 horas de vuelo en CESSNA C206 y PIPER PA34, durante el mes de abril 2022. | 24/05/2022 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by SERVICIOS Y TRANSPORTES LTDA (NIT 800.189.925-1, project owner), in order to not cause the national carbon tax. | 21/12/2018 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 811 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by COLTUGS, NIT 900485260-4,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 596 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 596 tons of greenhouse gas (GHG) emissions of the CBO FLAMENGO vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 596 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO FLAMENGO.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon removal credits for voluntary climate action - TR 23 | 22/12/2020 | Attestation letter |
| 0809 | Garganta da Jararaca Small Hydroelectric Power Plant (SHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 25,510 | CERs | Voluntary cancellation of 25.510 CERs in favor of: • Stan Empreendimentos e Participações Ltda. (Motion Avanhandava), CNPJ 43.108.083/0003-01, 3.560 CERs, • Villagio Pompéia Empreendimento Imobiliário SPE S.A., CNPJ 13.385.664/0001-68, 4.090 CERs, • Yuny Stan Projeto Imobiliário II S.A., CNPJ 11.939.724/0001-11, 17.860 CERs, to neutralize the construction phase of the buildings, including materials. | 08/02/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 686 | CERs | REASON FOR CANCELLATION: Compensation of carbon footprint for year 2021 of Acciona - Industrial | 11/05/2022 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 59 | CERs | Voluntary cancelation made by Anaconda Carbon on behalf of Wondermore.org to offset all GHG emissiones generated by air travel , hotel accomodations and land displacement for the ICELAND SEPTEMBER 2021 programs | 29/10/2021 | Attestation letter |
| 4700 | Vaayu India Wind Power Project in Gujarat. | Energy industries (renewable - / non-renewable sources) | India | 119,302 | CERs | "Voluntary cancellation of 119,302 GS CERs for the purpose of conversion to Gold Standard VERs from project GS3958. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose." | 05/05/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 100 | CERs | On behalf of: Heathrow Airport passengers | 02/11/2021 | Attestation letter |
| 6465 | SHPs Albano Machado and Rio dos Índios CDM Project (JUN1115) | Energy industries (renewable - / non-renewable sources) | Brazil | 2,729 | CERs | Purpose:Compensation des émissions de gaz à effet de serre sur la période de l’exercice 2021 (1er oct. 2020 - 30 sept. 2021) scope 1 et 2 de l’ensemble des sites de Derichebourg Propreté Beneficiary: Derichebourg Propreté | 17/12/2021 | Attestation letter |
| 7260 | DEWA Chiller Station L | Energy industries (renewable - / non-renewable sources) | United Arab Emirates | 10 | CERs | Voluntary cancellation made by Dubai Carbon to offset emissions generated from printing The Sustainabilist from October 2017 to October 2018 | 19/12/2018 | Attestation letter |
| 1984 | Sichuan Wanyuan Baiyangxi Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 1,500 | CERs | BMC Retailer carbon neutrality project 2021 first batch of CERs purchase. | 29/09/2022 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1 | CERs | Voluntary cancellation on behalf of Pricerite Home Limited to offset its carbon footprint | 23/09/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 12 | CERs | Retirement – Beneficiary: OMINA FOUNDATION Retirement Reason Details: Voluntary cancellation made by ANACONDA CARBON on behalf of OMINA FOUNDATION for all GHG emissions generated from the production of the OMINA's Manifesto Video in the month of August 2019 | 11/10/2019 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 10 | CERs | OFFSET ON BEHALF OF Sustainable Planet Holdings Ltd REASON FOR COMPENSATION I am offsetting the carbon footprint of my clients | 29/09/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 20 | CERs | Cancelación de emisiones de las conferencias medianas de Inversores Bestinver 2018 | 17/09/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,727 | CERs | 2020-1080 | 2019 | 16/12/2020 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 62 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 247 384,00 kms of riders using UberPLANET during January 2021 made by A-CO2 | 05/02/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 67,529 | CERs | Voluntary cancellation in favor of PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) for the neutralization of 67,529 tons of CO2 associated with fossil fuels to be used by PETROLEOS DEL MILENIO S.A.S (NIT 819.001.667-8) in order not to cause the national carbon tax. | 06/09/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 34 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Hempelmann Wittemöller GmbH ist der Ausgleich von 34 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 34 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 20/07/2022 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 113,782 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 07/05/2021 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 100,000 | CERs | Cancellation for conversion to VCUs | 25/11/2020 | Attestation letter |
| 0176 | Meizhou Landfills Gas Recovery and Utilization as Energy | Waste handling and disposal | China | 18,240 | CERs | Voluntary Cancellation on behalf of Offsetters community | 14/12/2021 | Attestation letter |
| 8048 | UNOSUGEN Natural gas based grid connected Combined cycle power generation project | Energy industries (renewable - / non-renewable sources) | India | 383,583 | CERs | For DL 2021 Carbon Neutrality. | 25/01/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 67 | CERs | MV0331 | 2020 | 16/12/2020 | Attestation letter |
| 1657 | Laiwu Iron & Steel Group Laigang Inc. 25MW Waste Gas Power Generation Project | Energy industries (renewable - / non-renewable sources) | China | 142,000 | CERs | CO2-Kompensationen von Produkten oder diversen Klimaschutzmaßnahmen der Kasseler Verkehrs- und Versorgungs- GmbH (KVV) sowie allen Beteiligungsgesellschaften und Allianzen der KVV. | 19/05/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 296 | CERs | Aposentadoria em nome da Cielo S.A, incluindo Coligadas, para neutralização das Emissões GEE de Escopo 1 de 2021 (período: 01.01.2021 a 31.12.2021). / Retirement on behalf of Cielo S.A, including Subsidiaries, to neutralize Scope 1 GHG Emissions from 2021 (period: 01.01.2021 to 12.31.2021). | 04/08/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Rajesh Sikka,Vice Chairman, CII WUP Zonal Council & Managing Director Metaflex Doors India Pvt Ltd. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1,105 | CERs | Compensation of carbon footprint for year 2018 of Acciona Inmobiliaria | 11/06/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 2 | tCERs | Visita de Integrantes da equipe da CSN-Companhia Siderúrgica Nacional para conhecer as operações do Grupo Plantar. | 14/10/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 25,000 | CERs | Cancelación voluntaria a favor de FRONTERA ENERGY COLOMBIA CORP (NIT 830126302-2) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 09/08/2021 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6,500 | CERs | AquaService Compensación Huella de Carbono Aquaservice 2022 | 05/05/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 285 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 285 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 285 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 29/01/2020 | Attestation letter |
| 6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Brazil | 1,196 | CERs | Compensação da pegada de carbono do Grupo VAMOS 2020 - Compensation of the carbon footprint of Grupo VAMOS 2020 | 11/03/2021 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 721 | CERs | These carbon credits have been retired on behalf of CarbonClick users for the purpose of offsetting their emissions. | 30/06/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 26 | CERs | Ausgleich der mit der Energy Card erfassten CO2-Emissionen des OIL! Fuhrparks für den Zeitraum November 2019 – März 2020. | 28/05/2020 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 10 | CERs | CIQSUE | 05/04/2022 | Attestation letter |
| 4322 | UPOIC Wastewater Treatment for Energy Generation, Krabi |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Thailand | 1,569 | CERs | 2018 SP Offsets retirement | 02/01/2020 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 50,000 | CERs | This voluntary cancellation of CERs was made on behalf of Programa Amigo do Clima. Details provided at www.amigodoclima.com. | 26/06/2020 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 12 | CERs | Compensación voluntaria a favor de FUNDACION MAREA VERDE por la neutralización de 12tCO2e obtenido por el manejo responsable de sus residuos para el periodo del 8 de noviembre del 2021 al 20 de julio del 2022 | 22/09/2022 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 330 | CERs | on behalf of WeCHOOOSE users | 05/01/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 78 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 308 198,0 kms of riders using UberECO during July 2020 made by A-CO2 | 10/08/2020 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 2,405 | CERs | Retirada para compensacao dos escopos 1, 2 e 3 do Inventario de Emissoes do Centro Administrativo Sicredi - CAS, referente aos anos de 2021 e 2022. | 28/09/2022 | Attestation letter |
| 5090 | Renewable Energy Wind Power Project in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 45,700 | CERs | Voluntary cancellation of 45,700 CERs for the purpose of conversion to Gold Standard VERs from project GS5007. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 05/10/2021 | Attestation letter |
| 4846 | Wind Power Project in Tirunelveli Tamilnadu | Energy industries (renewable - / non-renewable sources) | India | 16,000 | CERs | Company name; PWN Description; Offsetting 2021 | 05/10/2021 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 1 | CERs | Huakai Travel SL, Amsterdam 21-25 May. REASON FOR COMPENSATION: I am offsetting the carbon footprint of my clients | 04/05/2022 | Attestation letter |
| 0229 | BT Geradora de Energia Elétrica S. A. – Ferradura Small Hydro Power Plant – Small Scale CDM Project | Energy industries (renewable - / non-renewable sources) | Brazil | 4,324 | CERs | Aposentadoria em nome da Cielo S.A, incluindo Coligadas, para neutralizacao das Emissoes GEE de Escopo 1 de 2021 (periodo: 01.01.2021 a 31.12.2021). / Retirement on behalf of Cielo S.A, including Subsidiaries, to neutralize Scope 1 GHG Emissions from 2021 (period: 01.01.2021 to 12.31.2021). | 09/08/2022 | Attestation letter |
| 9610 | 5MW Solar PV Power Plant by AEPL | Energy industries (renewable - / non-renewable sources) | India | 2,382 | CERs | Retired on behalf of Luftfartsverket to offset emissions generated by our operations during 2018 | 06/12/2019 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 1 | tCERs | Eu, Fabio Santos Silva, compensei minha pegada de carbono! | 21/10/2022 | Attestation letter |
| 1284 | Ningxia Shapotou Hydropower Project of Yellow River | Energy industries (renewable - / non-renewable sources) | China | 2,871 | CERs | Neutralstellung Vorketten für „Naturstrom“ - Bezugsjahr 2021 Städtische Werke AG Königstor 3-13 34117 Kassel Deutschland (Germany) Kompensation der CO2-Vorketten für „Naturstrom“ als zertifizierter Ökostrom | 30/03/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 1,419 | CERs | Retiro a favor de PETROBRAS COLOMBIA COMBUSTIBLES SA identificado con NIT 900047822-5 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 16/03/2022 | Attestation letter |
| 10543 | 10MW solar PV based power generation by Helios Beau Champ Limited in Mauritius | Energy industries (renewable - / non-renewable sources) | Mauritius | 17,224 | CERs | Azura Group Climate Neutral products and offices (offset of carbon emissions by additional carbon offset projects for the campaign 2021-2022) | 30/08/2021 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 23 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 92 127,0 kms of riders using UberFLASH during November 2020 made by A-CO2 | 14/12/2020 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 10,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT 901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 18/11/2021 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 2,447 | CERs | CO2-neutraler Erdgasbezug für die Liegenschaften der Gehrung Gesellschaft für Grundbesitz und Vermögensverwaltung mbH in 2025 | 22/10/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Wo Hing Construction Company Limited” for Annual Dinner in 2021 (Transaction ID: 704) | 18/02/2021 | Attestation letter |
| 2483 | Inner Mongolia Wuliji Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 455,275 | CERs | ClimatePartner GmbH submits these Carbon Offsets on behalf of GE Renewable Management to offset the carbon and carbon equivalent emissions of GE Renewable Energy specifically for GE Renewable Energy’s CarbonNeutral® company certification (year 2020) | 17/08/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 141 | CERs | MV0310 | 2020 | 16/12/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 323 | CERs | MV3618 | 2020 | 16/12/2020 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 41 | CERs | For voluntarily offsetting the GHG that generated during the opreation of Agricultural Bank of China Limited Yu'nan Liantan Sub-Branch and Longyan Financial Service Station from January 1,2021 to December 31,2021. | 09/05/2022 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 12,487 | CERs | Livonia Print - offsetting Scope 1, 2 and 3 emissions for climate neutrality. | 05/01/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 100,000 | CERs | For DL 2021 Carbon Neutrality | 05/01/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Dr Eric LIU Sai Lok” for Annual Dinner in 2021 (Transaction ID: 721) | 22/02/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Mr Daniel YIP Toa Sun” for Annual Dinner in 2021 (Transaction ID: 727) | 22/02/2021 | Attestation letter |
| 0268 | Lages Methane Avoidance Project |
Waste handling and disposal
; Agriculture |
Brazil | 2,400 | CERs | “Voluntary Cancellation of Certified Emission Reductions (CERs) from the CDM Project 0268: Lages Methane Avoidance Project, made by Lages Bioenergética, fully owned by ENGIE Brasil Energia, on behalf of B3 S.A. – BRASIL, BOLSA, BALCÃO, to offset CO2 emissions related to the reported GHG Emissions from 2020.” | 14/02/2022 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 196 | CERs | OFFSET ON BEHALF OF Mercia Asset Management PLC REASON FOR COMPENSATION I am offsetting the carbon footprint of my organization | 13/07/2022 | Attestation letter |
| 4677 | Vaayu India Wind Power Project in Andhra Pradesh | Energy industries (renewable - / non-renewable sources) | India | 35,651 | CERs | Voluntary cancellation of 35651 CERs for the purpose of conversion to Gold Standard VERs from project GSID4603. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 14/09/2022 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 4,191 | CERs | Voluntarily cancellation of 4,191 CERs for conversion to Gold Standard VERs for project GS4426. These units have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 30/04/2020 | Attestation letter |
| 2092 | Wind Electricity Generation Project | Energy industries (renewable - / non-renewable sources) | India | 75,000 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 03/02/2020 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 31,435 | CERs | Voluntary Cancellation of 31,435 CERs to offset the CO2e emissions of of Dilmah Ceylon Tea Company PLC for the financial year 2019/20. | 10/03/2021 | Attestation letter |
| 5584 | Cerro de Hula Wind Project | Energy industries (renewable - / non-renewable sources) | Honduras | 15,575 | CERs | Retirement – Beneficiary: HARISA, S.A. de C.V. ; Retirement Reason Details: Compensación voluntaria a favor de HARISA, S.A de C.V., El Salvador, para compensar su huella de carbono 2019 / Voluntary compensation from HARISA, S.A. de C.V, El Salvador, to offset GHG emissions related to their 2019 Carbon Footprint. | 13/08/2020 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación Carbono | Tailandia 5-17 Diciembre | Huakai Travel S.L. I am offsetting the carbon footprint of my company's trips | 10/01/2022 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 569 | tCERs | Retired for ATP Tour Inc. | 31/01/2020 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 120,000 | CERs | IFood.com Agencia de Restaurantes Online S.A. CNPJ 14.380.200/0001-21 voluntary initiative to offset Greenhouse Gas emissions (GHG) and to mitigate the impacts on the climate change causes. / Iniciativa voluntaria da IFood.com Agencia de Restaurantes Online S.A. CNPJ 14.380.200/0001-21 para compensar as emissoes de Gases de Efeito Estufa (GEE) e mitigar os impactos sobre as causas das mudancas climaticas. | 13/07/2022 | Attestation letter |
| 0328 | Dolowal, Salar and Bhanubhura Mini Hydroelectric Projects | Energy industries (renewable - / non-renewable sources) | India | 110 | CERs | Bristlecone India Limited & Bristlecone Inc, is offsetting their company’s emission to become Carbon-Neutral for year 2021-22 (ie FY22) | 08/06/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 18,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT-901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles. | 18/06/2021 | Attestation letter |
| 2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 216 | CERs | Voluntary cancellation to offset the GHG generated from fossil fuel combustion and consumption of external electricity of the Global Marketing Center of Guangdong xinruncheng Ceramics Co., Ltd. from April 1,2021 to February 28,2022. | 12/04/2022 | Attestation letter |
| 7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 4,002 | CERs | Voluntary cancellation by Asia Symbol (GuangDong) Paper Co., Ltd to offset GHG Emissions generated from partial offset paper products (Brands PaperOne and ARIA) | 18/02/2022 | Attestation letter |
| 6973 | San Antonio El Sitio Wind Power Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 13 | CERs | The Ozone Secretariat at UNEP is offsetting the carbon emissions for its operations for 2020 | 18/10/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 66 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by CIPRECÓN S.A.S (NIT 830.071.121), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 187 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 187 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 187 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 23/10/2019 | Attestation letter |
| 4687 | Zafarana 85 MW Wind Power Plant Project | Energy industries (renewable - / non-renewable sources) | Egypt | 20,000 | CERs | First Climate for Avia AG | 20/10/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 28 | CERs | Beneficiary: WAYZ Reason for cancellation: offsetting the tonnes of carbon emitted in the production of The Misfit and The Grit Shoes | 23/11/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Fugro (Hong Kong) Limited” for Annual Dinner in 2021 (Transaction ID: 697) | 18/02/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 14 | CERs | World Blindness Summit 2021 (solo asistentes) | 30/07/2021 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action -TR 45 | 22/12/2020 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,053 | CERs | Voluntary cancellation in favour of Chevron Petroleum Company (NIT 860005223-9) for the neutralization of the GHG emissions, to be used by Coltanques (NIT 860040576-1), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 108 | CERs | Voluntary Cancellation of 108 CERs for transaction no. 485 to 511 on www.clpcarboncredits.com | 18/12/2019 | Attestation letter |
| 4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | Energy industries (renewable - / non-renewable sources) | India | 30,000 | CERs | "natureoffice GmbH - on behalf of our customer 10863 - Agreement 220714-2218” | 29/09/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 5,000 | tCERs | Carbon removal credits for voluntary climate action - TR 47 | 22/12/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,453 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 6 958 910,0 kms of riders using UberX during May 2020 made by A-CO2 | 05/06/2020 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 19,737 | CERs | "TAV EGE Terminal Investment, Construction and Operation Co, Izmir Adnan Menderes Airport 2019 Inventory year Airport Carbon Accreditation (ACA) Neutrality Level" | 11/03/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 1,006 | CERs | Voluntary cancellation of CERs was made on behalf of Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 05/09/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 8,184 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by EASYFLY S.A. NIT 900088915-7, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 9,407 | CERs | Retiro a favor de DISTRIBUIDORA DE COMBUSTIBLES - DISCOM SAS identificado con NIT  901160786-4 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 12/10/2022 | Attestation letter |
| 8981 | Nalcas Small Hydroelectric Run-of-River Power Plant | Energy industries (renewable - / non-renewable sources) | Chile | 5,494 | CERs | Für den durchschnittlichen Verbrauch von Wärme, Wasser und Strom aller OIL! Stationen in Deutschland ist der Ausgleich von 7.752 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der im Jahr 2021 entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung der folgenden CERs aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen: 5.494 Stück aus dem Projekt Nalcas Small Hydroelectric Run-of-River Power Plan (ID 8981). | 30/08/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,824 | CERs | Voluntary cancellation in favor of PRIMAX COLOMBIA SA; NIT 860002554-8 for neutralization of the GHG emissions, to be used by CEMEX TRANSPORTES DE COLOMBIA SA, NIT 830078000-0,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 20,000 | CERs | Cancelación voluntaria a favor de PLUS + ENERGY S.A.S. (NIT 901065873-0) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 21/12/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 747 | CERs | 2020-0699 | 2020 | 11/11/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 64 | CERs | To offset the carbon produced during DBS’s Annual Dinner and Dance (30th November 2019) | 04/03/2020 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 4,813 | CERs | Retired for Cool Effect on Behalf of Explore Thousand | 24/12/2021 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 187 | CERs | Cool Effect April 2022 Platform Sales:SOTLANDFILL2019 | 24/05/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 163 | CERs | Retirement – Beneficiary: INVERSIONES HOTELERAS CH DE ESCAZÚ S.A. Retirement Reason Details: Voluntary Cancellation for HOTEL RESIDENCE INN BY MARRIOTT, for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st, to December 31st, 2018 | 10/12/2019 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 126,339 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 20/10/2021 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 24 | CERs | This voluntary cancellation of CERs was made on behalf of Tiberina Auto / Unidade Supplier Park Polo Automotivo Jeep under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 4 | CERs | Consulting for Impact, AnneMoMa AG REASON FOR COMPENSATION I am offsetting the carbon footprint of my company's trips | 07/02/2022 | Attestation letter |
| 3937 | Nanyang Landfill Site LFG Recovery to Electricity Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
China | 46,618 | CERs | Cancelled on behalf of STX client with ID number: POS-30482-39537 for 2022/2023 usage. | 16/03/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 155 | CERs | Compensation of 155 tons of CO2e generated in 2019 by activities of Palsgaard Industria de México, S. de R. L. de C.V. | 23/04/2020 | Attestation letter |
| 1642 | SHYAM DRI WHR CPP | Energy industries (renewable - / non-renewable sources) | India | 5,000 | CERs | Green Initiative CERs will be used by clients seeking to offset greenhouse gas emissions. | 06/04/2022 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 32 | CERs | Beneficiary: SDR Milan, S.A. SDR ha adquirido de Anaconda Carbon bajo la modalidad de permisos transmisibles 32 toneladas de CO2 eq para la neutralización de sus emisiones del período 2018. | 18/01/2019 | Attestation letter |
| 10122 | 6 MW Solar Power Project by Arhyama Solar Power | Energy industries (renewable - / non-renewable sources) | India | 5,000 | CERs | voluntary cancellation of 5000 CERs for the purpose of conversion to Gold Standard VERs for project GS4530. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose | 17/06/2020 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 353 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 353 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 353 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen | 20/09/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 49,446 | CERs | Cancelación voluntaria a favor de PETROLEOS DEL MILENIO SAS - PETROMIL SAS (NIT-819001667-8) para neutralización de emisiones de gases de efecto invernadero por consumo de combustible fósiles | 19/03/2021 | Attestation letter |
| 8916 | Sichuan Baishuijiang Duonuo Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 3,000 | CERs | Retired on behalf of Evos Rotterdam B.V. to offset Emission of 2021 | 11/02/2022 | Attestation letter |
| 9251 | PV Project Development in Chile | Energy industries (renewable - / non-renewable sources) | Chile | 7,887 | CERs | On behalf of Lenovo Clients 15 January 2022 – 11 February 2022, Program Managed by Lenovo. | 14/02/2022 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 67 | CERs | Voluntary cancellation by Agricultural Bank of China (Hangzhou Jiangnan Sub-branch) to offset GHG Emissions generated from its daily operation in 2021 | 20/05/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 684 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 3 277 312,00 kms of riders using UberX during March 2021 made by A-CO2 | 13/04/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 14,749 | CERs | Retired for Cool Effect on behalf of Horizon Oil (Beibu) for purposes of Block 22/12 operations carbon offset | 01/02/2022 | Attestation letter |
| 9708 | Niger Acacia Senegal Plantation Project | Afforestation and reforestation | Niger | 5,394 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 18/11/2019 | Attestation letter |
| 2834 | Mokpo Landfill Gas Recovery Project for Electricity Generation |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 32,973 | CERs | To switch as Korean Offset and use at Korean ETS. | 25/11/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 85,000 | CERs | Not shared | 05/06/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 2,122 | CERs | 2019-0243 | 2020 | 11/11/2020 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,523 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213-0) for the neutralization of 1523 tons of CO2 associated with fossil fuels to be used by CEMENTOS ARGOS (Nit 890.100.251-0) in order not to cause the national carbon tax. | 15/09/2022 | Attestation letter |
| 1456 | 5 MW Wind Power Project of Alembic Ltd at Bhavnagar , Gujarat, India | Energy industries (renewable - / non-renewable sources) | India | 14,181 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 129 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL S.A identificado con NIT 830.095.213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ORGANIZACIÓN TERPEL S.A | 12/10/2022 | Attestation letter |
| 5090 | Renewable Energy Wind Power Project in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 41,631 | CERs | Voluntary cancellation of 41,631 CERs for the purpose of conversion to Gold Standard VERs from project GS5007. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 11/05/2021 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 3 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 3 tons of CO2 associated with fossil fuels to be used by CEMENTOS ARGOS S.A (NIT 890.100.251-0) in order not to cause the national carbon tax. | 11/05/2021 | Attestation letter |
| 0186 | Rice Husk Based Power Project | Energy industries (renewable - / non-renewable sources) | India | 9,861 | CERs | Beneficial Owner: EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA ESP (EAAB-ESP). Voluntary cancellation of CERs to offset the carbon footprint of EAAB - ESP in order to reach a carbon neutral condition | 28/02/2019 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 132 | CERs | Voluntary cancellation in favours of OrganizaciónTerpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Imbocar (NIT 800185379-1), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 185 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Lipps Energie GmbH ist der Ausgleich von 185 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 185 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 08/08/2019 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 415 | CERs | OFFSET ON BEHALF OF: The Wellbeing Project REASON FOR COMPENSATION: The Wellbeing Summit for Social Change 2022 | 01/09/2022 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 1,303 | CERs | Für klimaneutrale Kraftstoffe und Heizöle der Firma Uhlenbruck Energie GmbH & Co.KG ist der Ausgleich von 1303 Tonnen CO2-äquivalent erforderlich. Dieses Zertifikat bestätigt die Neutralisierung der entstandenen Emissionen durch die freiwillige und unwiderrufliche Löschung von 1303 Gold Standard CERs der Biogasanlage Namakkal, Indien aus dem CDM Register der Klimarahmenkonvention der Vereinten Nationen. | 28/04/2020 | Attestation letter |
| 0052 | Salvador da Bahia Landfill Gas Management Project | Waste handling and disposal | Brazil | 13,535 | CERs | Aposentadoria em nome da B2W Companhia Digital para neutralização das emissões de Escopo 1 e 2 do ano de 2019 / Retirement on behalf of B2W Companhia Digital to offset emissions from Scope 1 and 2 – 2019 | 14/06/2021 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 6 | CERs | Cancelación voluntaria hecha por Anaconda Carbon a favor de AGENCIA DATSUN SABANA para la acreditación de Bandera Azul del Punto de Venta Ag. Datsun Liberia para periodo 2020 | 14/04/2021 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 116,818 | CERs | This request is submitted to cancel the 116,818 CERs issued from Sihwa Tidal Power Plant CDM Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 30/01/2020 | Attestation letter |
| 1578 | Uganda Nile Basin Reforestation Project No.3 | Afforestation and reforestation | Uganda | 629 | tCERs | Per Eco-Carbone’s cancellation request dated January 26, 2017 | 16/11/2020 | Attestation letter |
| 8108 | Jilin Gongzhuling Biomass Generation Project | Energy industries (renewable - / non-renewable sources) | China | 2,489 | CERs | Voluntary cancellation for carbon emission for Topcentral's products (from cradle to gate) of Ningbo Topcentral New Material Co., Ltd. for 2022 | 03/08/2022 | Attestation letter |
| 2341 | Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Cañaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia | Waste handling and disposal | Colombia | 3,031 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 10/12/2020 | Attestation letter |
| 1145 | 8.75MW Bundle Wind Power Project in Maharashtra | Energy industries (renewable - / non-renewable sources) | India | 6,285 | CERs | Retirement Beneficiary - AFRIFLORA, Reason for cancellation - I want to contribute to climate action. | 26/07/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 922 | CERs | 2017-171 | 2020 | 11/11/2020 | Attestation letter |
| 2341 | Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Cañaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia | Waste handling and disposal | Colombia | 2,696 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax | 10/11/2020 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 50,366 | CERs | Gasversorgung Görlitz GmbH – CO2 neutrales Erdgas | 05/11/2021 | Attestation letter |
| 2898 | Sichuan Rural Poor-Household Biogas Development Programme |
Energy industries (renewable - / non-renewable sources)
; Agriculture |
China | 401 | CERs | CO2-Offset der Stiftung Mercator für das Geschäftsjahr 2021. | 30/07/2022 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 86,991 | CERs | "2020-0305 | 2020" | 26/10/2020 | Attestation letter |
| 2712 | Humbo Ethiopia Assisted Natural Regeneration Project | Afforestation and reforestation | Ethiopia | 8,648 | tCERs | The Government of Canada has withdrawn from the Kyoto Protocol and requested IBRD as Trustee of Carbon Funds to cancel all emission reductions resulting from its participation in these Funds | 16/05/2019 | Attestation letter |
| 3461 | Rio Amoya Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 643 | CERs | Retiro a favor de PRIMAX COLOMBIA S.A. identificado con NIT 860.002.554-8 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 15/02/2022 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 180,000 | CERs | “Voluntary cancellation on behalf of Natural Capital Partners’ client (ref 00079610)” | 26/07/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 1,522 | CERs | Retirement-Beneficiary: SERVICIOS DE VIAJEROS SUIZA S.A. Retirement Reason Details: Voluntary cancellation on behalf of SERVICIOS DE VIAJEROS SUIZA S.A. for its Greenhouse Gas (GHG) management strategy as required by the Costa Rican Carbon Neutrality Program for their emissions emitted from January 1st to December 31st, 2018 | 22/10/2019 | Attestation letter |
| 9990 | Mampuri Wind Power Project 3 | Energy industries (renewable - / non-renewable sources) | Sri Lanka | 20,000 | CERs | Chooose | 07/06/2022 | Attestation letter |
| 4988 | El General Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 30 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 120 059,0 kms of riders using UberFLASH during September 2020 made by A-CO2 | 14/10/2020 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 1,200 | CERs | Voluntary Cancellation of 1200 CERs for transaction no. 910 | 26/05/2021 | Attestation letter |
| 0349 | Sihwa Tidal Power Plant CDM Project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 114,630 | CERs | This request is submitted to cancel the 114,630 CERs issued from Sihwa Tidal Power Plant CDM Project and use them as offset in K-ETS in Korea. And the beneficiary of this request is Korea Water Resources Corporation("K-water"). | 05/01/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 36,000 | CERs | Retired on behalf of "Westfalen AG". | 19/02/2021 | Attestation letter |
| 5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 92,039 | CERs | We are hereby confirming Voluntary cancellation of 92,039 CERs for the purpose of conversion to Gold Standard VERs from project GS5013. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose | 16/03/2022 | Attestation letter |
| 4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | Energy industries (renewable - / non-renewable sources) | India | 70,722 | CERs | Retirement Beneficiary - Flamingo Horticulture Investments Ltd |Reason for cancellation - I WANT TO CONTRIBUTE TO CLIMATE ACTION. | 13/10/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 484 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by IMPOCOMA S.A.S (NIT 830.078.780), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 257 | CERs | Voluntary cancellation of CERs was made on behalf of FCA Autopeças Jaboatão dos Guararapes under Programa Amigo do Clima. Details are provided at www.amigodoclima.com | 05/09/2019 | Attestation letter |
| 6794 | Wind Energy Project in Saundatti, Karnataka | Energy industries (renewable - / non-renewable sources) | India | 70 | CERs | Voluntary Cancellation of 70 CERs for transaction no. 802, 803, 804, 806 & 809 (14 CERs each) on www.clpcarboncredits.com | 25/05/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 23 | CERs | Offsets on behalf of: Sustainable Planet Holdings Ltd Reason for Compensation: I am offsetting the carbon footprint of my company's trips | 24/09/2021 | Attestation letter |
| 10379 | Wonju Landfill Gas Recovery Project for Electricity Generation |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 13,919 | CERs | to transfer and us CERs, which owned by PPs, as Korea Offset Credit. | 08/04/2021 | Attestation letter |
| 4844 | Zhangjiakou Chabei Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 154,000 | CERs | ClimatePartner GmbH submits these Carbon Offsets on behalf of GE Renewable Management to offset the carbon and carbon equivalent emissions of GE Renewable Energy specifically for GE Renewable Energy’s CarbonNeutral® company certification (year 2020) | 17/08/2021 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 4,742 | CERs | Scandbook - offsetting Scope 1, 2 and 3 emissions for climate neutrality | 20/09/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 50 | CERs | These carbon credits have been retired on behalf of CarbonClick users for the purpose of offsetting their emissions. | 06/07/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Rodaje Mi 11 Xiaomi | 30/07/2021 | Attestation letter |
| 8950 | Guacamaya Small Scale Hydropower Programme of Activities | Energy industries (renewable - / non-renewable sources) | Honduras, Nicaragua, Costa Rica | 574 | CERs | Cancelación voluntaria realizada por Anaconda Carbon a favor del Banco Centroamericano de Integración Económica – BCIE para compensar el 20% de la totalidad de emisiones GEI generadas en su edifico Sede ubicado en Boulevard Suyapa, Tegucigalpa, Honduras durante el año 2019. | 16/12/2020 | Attestation letter |
| 4449 | Monte Redondo Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 8 | CERs | Engie Chile decided that all its events will be carbon neutral, in this case it is the meeting and 2020 planning of all its collaborators in which the new work strategy for the coming years is aligned. | 09/01/2020 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for Mr Anuj Khanna ,Chairman, CII WUP Zonal Council & Managing Director C&S Electric Limited. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,497 | CERs | 2019-1465 | 2020 | 11/11/2020 | Attestation letter |
| 6635 | Cuel Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Chile | 7,002 | CERs | Retired on behalf of Banco de crédito e Inversiones S.A. | 30/03/2022 | Attestation letter |
| 3378 | Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. | Waste handling and disposal | Mexico | 124 | CERs | Voluntary Cancellation of 124 CERs to offset the CO2e emissions of CONCESIONARIA VUELA COMPAÑIA DE AVIACIÓN, S.A.P.I. DE C.V. (VOLARIS) during fourth quarter (October-December) of 2020 | 12/11/2021 | Attestation letter |
| 6437 | Grid Connected Wind Power Project by M/s. D. J. Malpani at Ratan Ka Bas (RKB), Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 18,574 | CERs | Retired on behalf of DL 2021 CN | 01/10/2021 | Attestation letter |
| 7415 | Grid Connected Wind Power Project in Tamil Nadu | Energy industries (renewable - / non-renewable sources) | India | 140 | CERs | Voluntary Cancellation of 140 CERs for transaction no. 412 to 446 on www.clpcarboncredits.com | 09/08/2019 | Attestation letter |
| 0941 | Sudokwon Landfill Gas Electricity Generation Project (50MW) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 506 | CERs | It is aim to neutralize greenhouse gases emitted by 246 Korea representatives while participating in COP24 held in Katowice, Poland. The amount of carbon emission is verified by Korea Climate and Environment Network and CERs are donated by SL Corp. | 03/12/2018 | Attestation letter |
| 4928 | Huaneng Changyi Phase II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | China | 8,089 | CERs | Carbon credits retired by AzzeroCO2 on behalf of Favini Spa - offsetting of GHG emissions of the papers: Crush, Refit, Remake, Alga Carta, Shiro Echo, Tree free and Favini Art in 2021 and Wkloud Paper in 2022. | 01/04/2022 | Attestation letter |
| 4294 | Gwangju metropolitan city sanitary landfill LFG power plant CDM project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 17,939 | CERs | Cancelled CERs will turn into be KOCs(Korea offset credits) which can be used in domestic emission trading scheme of Republic of Korea. | 30/11/2020 | Attestation letter |
| 6702 | Jangi 91.8 MW wind farm in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 25,800 | CERs | Voluntary Cancellation on behalf of ClimatePartner GmbH clients. | 07/01/2022 | Attestation letter |
| 9301 | Teles Pires Hydropower Plant Project Activity | Energy industries (renewable - / non-renewable sources) | Brazil | 3,356 | CERs | This voluntary cancellation of CERs was made on behalf of Fiat Chrysler Automobiles - FCA Betim Powertrain under Programa Amigo do Clima. Details are provided at www.amigodoclima.com. | 22/12/2020 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 142 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 142 ton of greenhouse gas (GHG) emissions of the CBO Anita vessel fuel consumption.” Reference month: January 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 142 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Anita.” Mês de referência: Janeiro de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 10/03/2022 | Attestation letter |
| 4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The offset has been done for TVS Motor Company Limited. EnKing International is a leading carbon credits developer supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of Conference on Sustainability: Role of Industry Environmental Sustainability , which is organized by Confederation of Indian Industry (CII), India on 28th June 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Emissions to the contributiors of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 26/06/2019 | Attestation letter |
| 9830 | Cucuana Hydroelectric Power Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,086 | CERs | Voluntary cancellation in favor of TERPEL S.A. (NIT 830.095.213 - 0) for the neutralization of 1086 tons of CO2 associated with fossil fuels to be used by CEMENTOS ARGOS S.A (NIT 890.100.251-0) in order not to cause the national carbon tax. | 09/05/2022 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 2,000 | CERs | Retiring of 2,000 Gold Standard CERs issued in 2019 for unavoidable GHG emissions in the reporting year 2021, in order to achieve the ambitious climate target of Miele & Cie. KG. | 08/04/2021 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 36 | CERs | Voluntary cancellation in favours of Combustibles y Transportes Hernández (NIT 830118785-2) for neutralization of the GHG emissions associated, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,197 | CERs | 2019-1523 | 2020 | 11/11/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 500 | CERs | Voluntary retirement or cancellation on behalf of Neutral Flight, INC. and its user community: organizations and individuals who demand air flights and who seek to compensate the greenhouse gas (GHG) emissions travel-related per individual, and generated from January 1, 2021 to December 31, 2023. The credits acquired correspond to emissions removed or reduced by the project from January 1, 2016, onwards, regardless of whether the crediting period also covers previous GHG mitigation periods. The environmental benefits of this carbon credit are shared by various organizations and individuals appointed by Neutral Flight. INC, however, this original certificate is totally non-transferable after its cancellation. | 25/05/2021 | Attestation letter |
| 9007 | Distribution of Improved Cook Stoves in Sub-Saharan Africa | Energy demand | Senegal, Ghana, Nigeria, Malawi, Zambia, Zimbabwe | 188,876 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and Ecoeye is beneficiary of this cancellation. | 10/08/2021 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 108 | CERs | Compensación voluntaria realizada por Anaconda Carbon a favor de Popular Pensiones para compensar las emisiones GEI generadas por el CTP Isaías Retana Arias durante el periodo 2019 y cumplir con la normativa del PPCN | 29/11/2021 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 6 | CERs | BMW Xdrive Valencia 2020 | 05/02/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 1,122 | CERs | 2017-773 | 2020 | 11/11/2020 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 4,997 | CERs | 2020-0931 | 2020 | 09/11/2020 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 76 | tCERs | Associação Brasileira Técnica de Celulose e Papel Compensação de emissões do 54° Congresso e Exposição de celulose e papel da ABTCP, realizado de 04 a 06 de outubro de 2022 no Expo Transamérica - São Paulo. | 30/09/2022 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 138 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 138 ton of greenhouse gas (GHG) emissions of the CBO Vitória vessel fuel consumption.” Reference month: May 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 138 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO Vitória.” Mês de referência: Maio de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 13/07/2022 | Attestation letter |
| 2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | Afforestation and reforestation | Brazil | 10,000 | tCERs | Carbon credits available for voluntary uses - TR 24 | 22/12/2020 | Attestation letter |
| 1123 | Ciudad Juarez Landfill Gas to Energy Project | Waste handling and disposal | Mexico | 3,400 | CERs | Voluntary cancellation made by KPMG Cárdenas Dosal S.C. to neutralize the carbon footprint of its operations originated in 2020. | 21/10/2021 | Attestation letter |
| 4359 | Mare Chicose Landfill Gas Project | Waste handling and disposal | Mauritius | 256 | CERs | Cool Effect May 2022 Platform Sales:SOTLANDFILL2019 | 04/07/2022 | Attestation letter |
| 0198 | San Jacinto Tizate geothermal project | Energy industries (renewable - / non-renewable sources) | Nicaragua | 74,075 | CERs | Retirement on behalf of GRYPHON DIGITAL MINING, INC. to offset current and future carbon emissions | 07/06/2022 | Attestation letter |
| 1477 | Liujiashan 10 MW Small Hydropower Project in Jiangxi Province | Energy industries (renewable - / non-renewable sources) | China | 21,072 | CERs | Credits were retired on behalf of Fly Victor's 2021 climate strategy | 27/01/2022 | Attestation letter |
| 0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | Waste handling and disposal | Brazil | 538 | CERs | Aposentadoria para compensação dos escopos 1, 2 e 3 do inventário de emissões da ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Vinhedo - São Paulo, referente ao período: 01.01.2020 a 31.12.2020 / Voluntay cancellation to offset GHG Inventory, for scopes 1, 2 and 3, on behalf of ASCENTY DATA CENTERS E TELECOMUNICAÇÕES S.A, Unidade Datacenter Vinhedo - São Paulo by period 01.01.2020 to 31.12.2020. | 17/11/2021 | Attestation letter |
| 6488 | Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia | Waste handling and disposal | Malaysia | 23,000 | CERs | L’Oréal Carbon Balanced Program | 09/06/2021 | Attestation letter |
| 6160 | Wind Power Project in Tinwari, Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 34,860 | CERs | ‘Retired for Ubisoft Entertainment’ | 22/03/2022 | Attestation letter |
| 1836 | Poechos II hydroelectric plant project | Energy industries (renewable - / non-renewable sources) | Peru | 62,507 | CERs | EA Americas LLC 20 Danada SQ W 173 Wheaton, Illinois 60189 United States Responsible person: Paul Colgan paul@prismaventure.cl | 16/08/2019 | Attestation letter |
| 6484 | Wind Energy Project in Gujarat | Energy industries (renewable - / non-renewable sources) | India | 4,544 | CERs | „Stilllegung/Retirement: TÜV Nord Zertifizierung – Klimaneutrale Gasverbrennung / Ökogas (I.F. 2018 ongoing)“ | 14/06/2019 | Attestation letter |
| 7100 | Los Cocos II Wind Farm Project | Energy industries (renewable - / non-renewable sources) | Dominican Republic | 2,250 | CERs | Retirement Beneficiary : RON BARCELO Carbon Neutrality Program 2020. Retirement for the offset of the entire product life cycle emissions and corporate activity in 2019, this in accordance with GHG Protocol, ISO14067 and ISO14064-1. The Carbon Neutrality Program covers controlled activities in agricultural operations and processing plants, but also includes uncontrolled activities resulting from the transportation and manufacture of raw materials (glass bottles, plastics, metals,…), worldwide maritime and land distribution of products, and final disposal of packaging material. | 17/11/2020 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 7 | CERs | 7 tonnes retired in the name of Better APC | 16/04/2021 | Attestation letter |
| 5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | Chemical industries | Chile | 1,215 | CERs | Retired on behalf of AZA "Producto SAFEROCK Q4 2020 - SCX ID 0100-E7600A83" | 23/12/2020 | Attestation letter |
| 2148 | Chumporn applied biogas technology for advanced waste water management | Waste handling and disposal | Thailand | 8,007 | CERs | Voluntary cancellation of CDM Gold Standard CERs to offset German emissions of Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH for 2015 | 19/09/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 2,189 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by GRUPO INTEGRADO DE TRANSPORTE MASIVO (NIT 900.099.310-9, project owner), in order to not cause the national carbon tax. | 27/11/2018 | Attestation letter |
| 0604 | Candelaria Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Guatemala | 900 | CERs | Compensación voluntaria realizada a favor de CONTECON GUAYAQUIL para compensar las emisiones generadas por desplazamiento terrestre de la finca al puerto de los años 2020 y 2021. | 18/08/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,232 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 03/07/2019 | Attestation letter |
| 5016 | Reforestation of degraded land by MTPL in India | Afforestation and reforestation | India | 725,000 | tCERs | Cancellation for conversion to VCUs | 22/12/2020 | Attestation letter |
| 8855 | Solar Water Heater Program in India | Energy industries (renewable - / non-renewable sources) | India | 4,000 | CERs | Retired on behalf of Planetly GmbH | 25/04/2022 | Attestation letter |
| 4788 | Cachoeirao CDM Project (JUN1092) | Energy industries (renewable - / non-renewable sources) | Brazil | 51 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 51 tons of greenhouse gas (GHG) emissions of the CBO BIANCA vessel fuel consumption.” Reference month: July 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 51 tons de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação CBO BIANCA.” Mês de referência: Julho de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 23/08/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 313 | CERs | Retiro a favor de CHEVRON PETROLEUM COMPANY identificado con NIT 860.005.223-9 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017 | 03/08/2022 | Attestation letter |
| 9185 | Grid connected solar photovoltaic power plant in Bikaner, Rajasthan, India | Energy industries (renewable - / non-renewable sources) | India | 117,000 | CERs | “ClimatePartner GmbH submits these Carbon Offsets on behalf of GE Renewable Management to offset the carbon and carbon equivalent emissions of GE Renewable Energy specifically for GE Renewable Energy’s CarbonNeutral® company certification (calendar year 2020).” | 15/06/2021 | Attestation letter |
| 9941 | Programme of Activities for Local Improved Cookstoves in West Africa | Energy demand | Mali, Benin | 4 | CERs | Charpentier Premiuml | 05/04/2022 | Attestation letter |
| 3298 | Roaring 40s Wind Farms (Khandke) Private Limited - Phase II | Energy industries (renewable - / non-renewable sources) | India | 15 | CERs | Voluntary Cancellation of 15 CERs for transaction no.1030-1031 (CLPI) | 10/12/2021 | Attestation letter |
| 4127 | Reforestation of grazing Lands in Santo Domingo, Argentina | Afforestation and reforestation | Argentina | 344,635 | lCERs | The Carbon Sinks related to these l-CERs have been accounted on the GHG Balance of Novartis AG in the years 2013 to 2018. | 09/07/2019 | Attestation letter |
| 6275 | Los Santos Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 520 | CERs | Voluntary cancellation in the name of Cool Effect, Inc. - months of October- November 2018 | 12/12/2018 | Attestation letter |
| 5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | Energy industries (renewable - / non-renewable sources) | Brazil | 17,715 | CERs | Aposentadoria em nome de Ifood.com Agência de Restaurantes Online S.A., CNPJ 14.380.200/0001-21 | 10/03/2022 | Attestation letter |
| 1166 | Bundled wind energy power projects (2004 policy) in Rajasthan | Energy industries (renewable - / non-renewable sources) | India | 30,709 | CERs | Cancelled on behalf of EnergyAustralia’s Go Neutral product to meet its carbon neutral product claim against the Climate Active Standard for CY2020 | 26/11/2020 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 307 | CERs | Retirement – Beneficiary: Anaconda Carbon; Retirement Reason Details: Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 1.221.907,0 kms of riders using UberECO during February 2020 made by A-CO2 | 06/03/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 300 | CERs | Compensación de las emisiones de Comercial de Potencia y Maquinaria S.A. – Costa Rica, en el periodo comprendido del 1 de enero al 31 de diciembre del 2021 para demostrar la Carbono Neutralidad ante el PPCN 2.0 y la norma INTE B5 de Costa Rica | 14/06/2022 | Attestation letter |
| 1253 | Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) | Energy industries (renewable - / non-renewable sources) | India | 1,787 | CERs | Voluntary cancellation of 1,787 CERs for the purpose of conversion to Gold Standard VERs from project GS5860. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose. | 23/08/2021 | Attestation letter |
| 9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | Energy demand | Rwanda, Uganda, Nigeria, Kenya | 539 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. is beneficiary of this cancellation. | 03/07/2020 | Attestation letter |
| 5342 | African Improved Cooking Stoves Programme of Activities | Energy demand | Ghana, Nigeria, Liberia | 25,641 | CERs | This cancellation is for usage in the Korean Offset Program (in K-ETS), and CERPD Co., Ltd. Is beneficiary of this cancellation. | 27/10/2021 | Attestation letter |
| 5676 | Oaxaca III Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5,158 | CERs | PwC 2018 Carbon Offset Purchase | 24/04/2020 | Attestation letter |
| 6848 | Chacayes Hydroelectric Project, Chile | Energy industries (renewable - / non-renewable sources) | Chile | 1,263 | CERs | Compensacion Huella de Carbono Pacific Hydro Chile S.A. año 2018 | 05/08/2019 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 437 | CERs | Retirement – Beneficiary: Fábrica de Harinas de Centroamérica S.A.; Retirement Reason Details: Voluntary cancellation made by Fábrica de Harinas de Centroamérica S.A. (FAHCASA) for its Greenhouse Gas Neutrality (GHG) Strategy for their emissions emitted from January 1st to December 31, 2018. | 27/01/2020 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 576 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00076379 | 30/09/2021 | Attestation letter |
| 4661 | Samdal Wind Power project | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 157 | CERs | Retired on behalf of Natural Capital Partners for Customer ID 00076748 | 30/09/2021 | Attestation letter |
| 4993 | Hydroelectric Project in Kinnaur District in Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 82,051 | CERs | MV0469 | 2020 | 09/11/2020 | Attestation letter |
| 0675 | Vinasse Anaerobic Treatment Project - Compañía Licorera de Nicaragua, S. A. (CLNSA) | Waste handling and disposal | Nicaragua | 24,883 | CERs | Voluntary cancellation in order to claim carbon neutrality for Flor de Caña products sold during 2019. | 08/04/2020 | Attestation letter |
| 1314 | Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) | Energy industries (renewable - / non-renewable sources) | Costa Rica | 424 | CERs | Voluntary compensation from Uber Costa Rica to offset GHG emissions related to 2 033 270,00 kms of riders using UberX during October 2021 made by Anaconda Carbon. | 11/11/2021 | Attestation letter |
| 10286 | Brazilian PoA for NAMA incentivized NCRE Projects | Energy industries (renewable - / non-renewable sources) | Brazil | 86,000 | CERs | Voluntary cancellation of Certified Emission Reductions (CERs) from the CPA 10286-P1-0003-CP1: Floresta Solar Power Complex, fully owned by ENGIE Solar Floresta Geração Centralizada Holding S.A., on behalf of ITAÚ UNIBANCO S.A., to offset CO2 emissions related to the reported GHG Emissions from 2016/2017. | 14/12/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 283 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by COOPERATIVA DE TRANSPORTADORES DE SABANALARGA (NIT 890104921), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 3057 | Qichun Kaidi Biomass Power Project | Energy industries (renewable - / non-renewable sources) | China | 14,428 | CERs | CO2-Neutralstellung der Kasseler Verkehrs- und Versorgungs-GmbH (KVV), Städtische Werke Netz + Service GmbH (NSG), Städtische Werke AG und der Kasseler Verkehrs-Gesellschaft (KVG)* im Zeitraum vom 01/2020 bis 12/2020. * Dies beinhaltet zusätzlich auch die Fahrleistungen, die von den von der KVG beauftragten Subunternehmen erbracht wurden. | 28/01/2022 | Attestation letter |
| 10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | Energy industries (renewable - / non-renewable sources) | India | 88,200 | CERs | Voluntary cancellation of 88,200 CERs for the purpose of conversion to Gold Standard VERs from project GS5519. These have not been used for any offsetting purposes, or mandatory or voluntary compliance purpose | 15/09/2022 | Attestation letter |
| 1787 | Valdivia biomass power plant | Energy industries (renewable - / non-renewable sources) | Chile | 9,789 | CERs | Bolt Energy Services | 25/08/2021 | Attestation letter |
| 6652 | Orosi Wind Power Project | Energy industries (renewable - / non-renewable sources) | Costa Rica | 297 | CERs | Retirement – Beneficiary: Mesoamerica Partners MP S.A.; Retirement Reason Details: Cancelación voluntaria hecha por Mesoamerica Partners MP S.A., Mesoamerica Andino Colombia y Mesoamerica Panamá, p para su estrategia de reducción de emisiones para el Programa de Carbono Neutralidad de Costa Rica de sus emisiones del 01 de enero del 2018 al 31 de diciembre del 2019 | 20/04/2020 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 548 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by BUS BENZ S.A.S (NIT 900.013.269-5), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 4 | CERs | Espectáculo multimedia 500 años Ciudad de Panamá | 05/02/2020 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 11,300 | CERs | mTurk climate change experiment | 11/12/2018 | Attestation letter |
| 10183 | Small Hydro Power Project in Panwi, Himachal Pradesh | Energy industries (renewable - / non-renewable sources) | India | 20,000 | CERs | Company Name (beneficiary): PWN Purpose of Retirement: Offset for 2018 Compensation GHG Emissions. | 07/12/2018 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 2,024 | CERs | Voluntary cancellation in favours of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio Providencia SA (NIT 891300238-6), in order to not cause the national carbon tax | 04/06/2019 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 365 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by TRAVESA (NIT 800.205.579, project owner), in order to not cause the national carbon tax. | 26/11/2018 | Attestation letter |
| 8288 | IOT Mabagas Limited power plant, Pudhuchatram |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
India | 2 | CERs | Ausgleich der durch Produktion und Transport entstandenen Emissionen der Just Nosh „Lotus Pops“ Snacks. | 10/10/2022 | Attestation letter |
| 9981 | Domestic Cooking Stoves substitution programme in Mozambique | Energy demand | Mozambique | 1,916 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes. | 05/05/2021 | Attestation letter |
| 0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | Energy industries (renewable - / non-renewable sources) | El Salvador | 100,000 | CERs | Retired on behalf of IGS Energy Carbon-Neutral Natural Gas customers for 2021 | 18/11/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 3,632 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by INVERSIONES DE TRANSPORTE S.A. (NIT 900.214.252-3), in order to not cause the national carbon tax | 27/11/2018 | Attestation letter |
| 3442 | Nam Chien 2 Hydropower Project | Energy industries (renewable - / non-renewable sources) | Viet Nam | 30,000 | CERs | Retired on behalf of Signify | 08/05/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | "The Cancellation is done for Mr. Ajey Mehta Vice President & Country Head - India, HMD Global. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | Waste handling and disposal | India | 5,000 | CERs | Retired on behalf of Carbon Consulting Company (Pvt) Ltd, Sri Lanka towards the Offsetting Requirements of their Clients | 16/02/2022 | Attestation letter |
| 8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | Energy industries (renewable - / non-renewable sources) | Colombia | 124 | CERs | Voluntary cancellation in favour of Puma Energy Colombia Combustibles SAS (NIT 900497906-5) for the neutralization of the GHG emissions, to be used by Helistar (NIT 811020344-6), in order to not cause the national carbon tax. | 13/02/2019 | Attestation letter |
| 2698 | 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh. | Energy industries (renewable - / non-renewable sources) | India | 5 | CERs | The Cancellation is done for Rajesh Kumar CGM - SBI, LHO Bhopal. EnKing International is a leading carbon credits developer & supplier of India. It aspires and works to solve the sustainability challenges the Earth is standing today. EnKing International is a Carbon Neutrality Sponsor of 28th IMA INTERNATIONAL MANAGEMENT CONCLAVE 2019, which is organized by Indore Management Association in Indore (M.P.), India on 18th & 19th January 2019. Apart from making the whole event carbon neutral, to further highlight the issues of carbon emissions & global warming and to raise better awareness for the protection of the environment, EnKing International is gifting 5 carbon credits to carbon neutralize part of the year 2019 Annual Travel Emissions to the esteemed Speakers of this prestigious event, Know more about EnKing International at www.enkingint.org. Connect with us at business@enkingint.org | 16/01/2019 | Attestation letter |
| 9247 | Programme of Activities to introduce renewable energy system into collective housing, Republic of Korea | Energy industries (renewable - / non-renewable sources) | Republic of Korea | 16,807 | CERs | The cancelled CERs will be in exchange for Korean Offset Credits in Korea Emissions Trading Scheme. The beneficiary of this is LH Corporation(Same as Korea Land & Housing Corporation). | 20/07/2020 | Attestation letter |
| 0941 | Sudokwon Landfill Gas Electricity Generation Project (50MW) |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Republic of Korea | 739,375 | CERs | 739375 CERs Cancellation in exchange for Korean Offset Credit (KOC) to be issued by Korean Offset Program to SL Corp. | 23/08/2022 | Attestation letter |
| 0968 | Incomex Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Brazil | 167,000 | CERs | Voluntary offset retirement made by ecosecurities on behalf of Banco Bradesco S.A. to compensate 167.000 tCO2e corresponding to its operational GHG emissions from Scope 1, 2 and 3 generated in 2019. | 16/03/2021 | Attestation letter |
| 2793 | Santana I SHP CDM Project (JUN 1118) | Energy industries (renewable - / non-renewable sources) | Brazil | 781 | CERs | Purpose: “CBO Holding S.A. (“Company”), CNPJ/MF nº 14.882.295/0001-81, neutralized 781 tons of greenhouse gas (GHG) emissions of the AH Valletta vessel fuel consumption.” Reference month: April 2022 “A CBO Holding S.A.(“Companhia”), CNPJ/MF nº 14.882.295/0001-81, compensou 781 ton de emissões de gases de efeito estufa (GEE) provenientes do consumo de combustível da embarcação AH Valletta.” Mês de referência: Abril de 2022 Beneficiary: "CBO Holding S.A. - CNPJ/MF nº 14.882.295/0001-81" | 30/05/2022 | Attestation letter |
| 0242 | Pesqueiro Energia Small Hydroelectric Project (PESHP) | Energy industries (renewable - / non-renewable sources) | Brazil | 1,850 | CERs | Retired on behalf of ClimatePartner´s customer | 08/10/2021 | Attestation letter |
| 3461 | Rio Amoyá Run-of-River Hydro Project | Energy industries (renewable - / non-renewable sources) | Colombia | 485 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL S.A.(NIT 830.095.213-0) for neutralization of the GHG emissions, to be used by EQUIRENT S.A (NIT 800204462-8), in order to not cause the national carbon tax | 26/11/2018 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 90 | CERs | Retiro a favor de ORGANIZACIÓN TERPEL S.A identificado con NIT 830.095.213-0 para la no causación del impuesto al carbono de Colombia, de acuerdo con lo establecido en el Decreto 926 de 2017. Proveedor notificado: ORGANIZACIÓN TERPEL S.A | 12/10/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 5 | CERs | XIX Conferencia Anual de Inversores Bestinver 2020 | 05/02/2021 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 5,595 | CERs | Retiro a favor de TERPEL S.A identificado con NIT 830095213-0 para neutralización de emisiones de GEI debido al consumo de combustible fósiles | 11/08/2022 | Attestation letter |
| 0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | Waste handling and disposal | Brazil | 6,697 | CERs | On behalf of Aspiration Partners, Inc. | 04/01/2022 | Attestation letter |
| 6216 | Oaxaca IV Wind Energy Project | Energy industries (renewable - / non-renewable sources) | Mexico | 1 | CERs | Compensación carbono|Laponia 4-10 diciembre |Huakai Travel S.L. | 17/12/2021 | Attestation letter |
| 2746 | Dagachhu Hydropower Project, Bhutan | Energy industries (renewable - / non-renewable sources) | Bhutan | 2,325 | CERs | “To offset greenhouse gas emissions attributable to the Asia Clean Energy Forum 2019 held from 17th to 21st June 2019 at ADB's Headquarters in Manila, Philippines” Beneficiary: Asian Development Bank | 04/08/2020 | Attestation letter |
| 1307 | Durango – EcoMethane Landfill Gas to Energy Project |
Energy industries (renewable - / non-renewable sources)
; Waste handling and disposal |
Mexico | 9,734 | CERs | Cancelación de créditos para abatir Emisiones de Flota vehicular operativa VEMO, alcances 1 y 2. Cancellation of credits to reduce Emissions of the VEMO operational vehicle fleet, scopes 1 and 2. | 04/07/2022 | Attestation letter |
| 6864 | Fuel Efficient Stoves in Zambia | Energy demand | Zambia | 7,890 | CERs | CERs are being voluntarily cancelled to transfer to the VCS Program and have not been used for any offsetting purposes, or mandatory or voluntary compliance purposes | 19/01/2021 | Attestation letter |
| 7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | Energy industries (renewable - / non-renewable sources) | China | 66 | CERs | Voluntary cancellation to offset the GHG generated from operations of Shanghai Di'an Technology Co.,ltd. in 2021 | 19/01/2022 | Attestation letter |
| 10236 | Sogamoso Hydroelectric Project | Energy industries (renewable - / non-renewable sources) | Colombia | 71 | CERs | Retiro a favor de PETROBRAS COLOMBIA COMBUSTIBLES SA identificado con NIT 900047822-5 para neutralización de emisiones de GEI debido al consumo de combustibles fósiles | 12/04/2022 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 1,267 | CERs | Voluntary cancellation in favor of PETROBRAS COLOMBIA COMBUSTIBLES SA; NIT 900047822-5 for neutralization of the GHG emissions, to be used by COLTANQUES SAS NIT 860040576-1, project owner, in order to not cause the national carbon tax. | 13/11/2019 | Attestation letter |
| 3309 | Sichuan Muchuan County Huogu Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1 | CERs | Cancellation on behalf of Dragon Values srl to offset the carbon footprint of his organization | 03/08/2022 | Attestation letter |
| 2406 | CGN Inner Mongolia Duerbote Wind farm Project | Energy industries (renewable - / non-renewable sources) | China | 45,402 | CERs | This certificate represents the retirement of carbon credits equivalent to the carbon emissions generated during the manufacture process of Radar brand of tires from July 2018 to December 2018 and January 2020 to December 2020. | 31/05/2021 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 14 | CERs | Retired for HKIE Civil Division’s Souvenir to “Ir TONG Sidney Pui Keung” for Annual Dinner in 2021 (Transaction ID: 711) | 18/02/2021 | Attestation letter |
| 2792 | N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India | Chemical industries | India | 1,828 | CERs | on behalf of GP-24 | 09/08/2022 | Attestation letter |
| 8438 | Clean Cook Stoves in Sub-Saharan Africa by ClimateCare Limited | Energy demand | Ghana, Kenya | 192 | CERs | First retirement for Furthr | 31/01/2022 | Attestation letter |
| 3142 | Roaring 40’s Wind Farms (Khandke) Private Limited | Energy industries (renewable - / non-renewable sources) | India | 168 | CERs | Retired for HKIE Civil Division’s Souvenir to “Shui On Building Contractors Limited” for Annual Dinner in 2021 (Transaction ID: 707) | 18/02/2021 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 388 | CERs | Voluntary cancellation in favor of CHEVRON PETROLEUM COMPANY; NIT 860005223-9 for neutralization of the GHG emissions, to be used by EASYFLY S.A., NIT 900088915-7,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 3224 | Cable Cars Metro Medellín, Colombia | Transport | Colombia | 561 | CERs | Voluntary cancellation in favor of ORGANIZACIÓN TERPEL SA; NIT 830095213-0 for neutralization of the GHG emissions, to be used by INVERSIONES GLP SAS ESP, NIT 900335279-0,project owner, in order to not cause the national carbon tax. | 10/12/2019 | Attestation letter |
| 8756 | Providencia I: 1.8MW Small Hydro Power Generation Plant | Energy industries (renewable - / non-renewable sources) | Colombia | 1,721 | CERs | Voluntary cancellation in favour of Organización Terpel S.A. (NIT 830095213-0) for neutralization of the GHG emissions associated, to be used by Ingenio del Cauca (NIT 891300237-9), in order to not cause the national carbon tax of Colombia. | 14/07/2021 | Attestation letter |
| 7497 | Xinjiang A’letai Hua’ning Hydropower Project | Energy industries (renewable - / non-renewable sources) | China | 1,294 | CERs | Voluntary cancellation by Hebei Kinghey Co., Ltd. to offset the GHG Emissions generated by its daily operation in 2021 | 06/07/2022 | Attestation letter |

Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: