Post-registration change requests for prior approval – published

Prior approval requests pending publication | Published prior approval requests pending finalization | Search finalized prior approval and issuance track requests

ReferenceTitleCurrent StateLast update
PRC-4118-004 Asahan 1 Hydroelectric Power Plant 2 x 90 MW
PRC-10004-003 City of Cape Town Landfill Gas Extraction and Utilisation Programme Summary note being prepared 17 Oct 2022
PRC-10233-001 Biomass based power project of VPL Withdrawn
PRC-1620-002 Hedcor Sibulan 42.5 MW Hydroelectric Power Project
PRC-2018-002 Baihubao 33.75MW Wind Power Generation Project in Shanxi Province
PRC-3455-001 BRASCARBON Methane Recovery Project BCA-BRA-05, Brazil
PRC-0207-001 Alto Alegre Bagasse Cogeneration Project (AABCP) Awaiting DOE clarifications 09 Nov 2012
PRC-0349-004 Sihwa Tidal Power Plant CDM Project Approved
PRC-4532-001 Biomass based power project of Rayapati Power Generation Private Limited Awaiting DOE clarifications 09 Jun 2015
PRC-7739-001 Quebra Dentes Small Hydropower Plant CDM Project Activity Awaiting EB decision 06 Oct 2022
PRC-4728-004 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa Awaiting DOE clarifications 18 Oct 2022
PRC-2467-005 Landfill Gas Recovery and Utilization at Bukit Tagar Sanitary Landfill, Hulu Selangor in Malaysia
PRC-1314-003 Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA)
PRC-3125-001 Biogas Recovery at Ulu Kanchong Palm Oil Mill Awaiting DOE clarifications 13 Aug 2013
PRC-0170-002 El Molle – Landfill gas (LFG) capture project
PRC-3532-001 Song Chung Hydropower Project
PRC-1165-002 PROBIOGAS-JP – João Pessoa Landfill Gas Project