Symbol
Abstract
This report covers the work of the Paris Committee on Capacity-building between September 2018 and September 2019. It contains organizational and procedural information, including on the meeting held during the reporting period. The report highlights the progress of the Committee in implementing its rolling workplan for 2017–2019 in the areas of promoting the coherence and coordination of capacity-building under and outside the Convention; providing technical support and guidance on building climate change related capacity; and undertaking awareness-raising, outreach, and knowledge- and information-sharing. It concludes with recommendations to the Subsidiary Body for Implementation to consider and forward to the Conference of the Parties, as appropriate.
Conference
Session
Agenda item
COP 25
Adopted as presented in decisions 8/CP.25, 9/CP.25 and 10/CP.25.
-
FCCC/SBI/2019/13Annual technical progress report of the Paris Committee on Capacity-buildingProgress reports
-
FCCC/SBI/2019/L.30Matters relating to Capacity-building under the Convention, including the review of the Paris Committee for Capacity-building. Draft conclusions proposed by the ChairDraft decisions
-
FCCC/SBI/2019/L.29Matters relating to capacity-building under the Convention, including enhancing institutional arrangements. Draft conclusions proposed by the Chair. Initial institutional arrangements for capacity-building under the Paris AgreementDraft decisions
-
FCCC/SBI/2019/L.27Annual technical progress report of the Paris Committee on Capacity-building Draft conclusions proposed by the ChairDraft decisions
-
FCCC/SBI/2019/L.28Matters relating to capacity-building under the Convention, including the fourth comprehensive review of the framework for capacity-building in developing countries under the Convention Draft conclusions proposed by the ChairDraft decisions
SBI 51
Informal consultations co-facilitated by Felipe Osses (Chile) and Ismo Ulvila (European Union).
COP recommendation adopted as presented
-
FCCC/SBI/2019/13Annual technical progress report of the Paris Committee on Capacity-buildingProgress reports
-
FCCC/SBI/2019/L.27Annual technical progress report of the Paris Committee on Capacity-building Draft conclusions proposed by the ChairDraft decisions
Informal consultations co-facilitated by Felipe Osses (Chile) and Ismo Ulvila (European Union).
COP recommendations adopted as presented
-
FCCC/SBI/2019/INF.11Views on the review of the Paris Committee on Capacity-building. Synthesis report by the secretariatPre-session documents
-
FCCC/SBI/2019/INF.17Views on the fourth comprehensive review of the implementation of the framework for capacity-building in developing countries under the Convention. Synthesis report by the secretariatPre-session documents
-
FCCC/SBI/2019/13Annual technical progress report of the Paris Committee on Capacity-buildingProgress reports
-
FCCC/SBI/2019/11The 8th Durban Forum on capacity-building. Report by the secretariatPre-session documents
-
FCCC/SBI/2019/L.30Matters relating to Capacity-building under the Convention, including the review of the Paris Committee for Capacity-building. Draft conclusions proposed by the ChairDraft decisions
-
FCCC/SBI/2019/L.29Matters relating to capacity-building under the Convention, including enhancing institutional arrangements. Draft conclusions proposed by the Chair. Initial institutional arrangements for capacity-building under the Paris AgreementDraft decisions
-
FCCC/SBI/2019/L.28Matters relating to capacity-building under the Convention, including the fourth comprehensive review of the framework for capacity-building in developing countries under the Convention Draft conclusions proposed by the ChairDraft decisions
