Français
The table below presents the key priority activities of the work programme of the Least Developed Countries Expert Group for the period 2008-2010 (FCCC/SBI/2008/14). It also provides information on the main deliverables and results of this LEG mandate(FCCC/SBI/2010/26).
|
Activities |
Main deliverable and results |
|
Enhance efforts to support least developed countries (LDCs) with special needs in the preparation and implementation of national adaptation programmes of action (NAPAs) |
Ongoing case files with regular updates on progress made by countries that are still preparing their NAPAs, with all countries in this group being actively assisted to advance in their NAPA preparation |
|
Provide further support for NAPA preparation and implementation through the distribution of a technical paper on NAPA preparation and the development of implementation strategies |
|
|
Prepare and disseminate a step-by-step guide for implementing NAPA |
|
|
Organize training on the design of NAPA implementation strategies and the preparation of projects based on the information contained in the step-by-step guide |
|
|
Conduct a survey of LDC Parties, United Nations agencies and other relevant actors to collect information on the status of implementation of NAPAs |
|
|
Conduct capacity-building and outreach activities as requested by Parties at the 2007 stocktaking meeting of the LEG and through surveys |
Ongoing. Continuous response to requests from LDC Parties through training activities, workshops and other forms of support |
|
Summarize key aspects of NAPAs with a view to identifying key vulnerabilities, adaptation options by sector and opportunities for regional synergy, in order to show evidence of alignment with, and integration of NAPA activities into, national development priorities and plans |
|
|
Conduct activities to promote synergy during implementation |
|
|
Catalyse action by United Nations organizations and bilateral and multilateral agencies in support of NAPA implementation and implementation of the LEG work programme |
|
|
Raise awareness of the NAPA process with a view to advancing adaptation and encouraging effective implementation of NAPAs |
|
|
Develop an approach paper on the collection of information for assessing the effectiveness of the NAPA programme and NAPA projects at the national and global levels |
|
|
Estimate the support needed to fully implement NAPAs, including costs, capacity-building, technology and institutional arrangements |
An information paper was published and disseminated electronically |
|
Respond to request by LDC Parties |
Ongoing. The LEG continues to respond to requests for information and technical support from LDC Parties including through the review of draft NAPAs, and other needs |
|
Contribute to the 10-year review of the Brussels Declaration and the Programme of Action for the Least Developed Countries for the Decade 2001-2010 under the United Nations Office of the High Representative for the Least Developed Countries, Landlocked Developing Countries and Small Island Developing States |
Ongoing. The LEG is preparing a written contribution to a preparatory meeting for the review of the implementation of the LDC work programme under the Convention |
|
Provide input to the work of the GEF on facilitating the implementation of the remaining elements of the LDC work programme |
The LEG in its report to the SBI on its seventeenth meeting, proposed options for ways in which the GEF could implement the remaining elements of the LDC work programme |