15:13 10 Mar 22
Finalized proposed new large scale methodologies
Displaying 441-460 of 488
| Reference | Proposed New Methodology | Current Status | Last update |
|---|---|---|---|
| NM0008 | Penas Blancas hydroelectric project | Submission not approved | 11 Sep 03 |
| NM0007-rev | HFC Decomposition project in Ulsan | Submission approved | 12 Sep 03 |
| NM0007 | HFC decomposition project in Ulsan | Submission not approved | 11 Sep 03 |
| NM0006 | El Canada hydroelectric project | Submission not approved | 11 Sep 03 |
| NM0005-rev | Nova Gerar Landfill Gas to Energy project | Submission approved | 12 Jan 04 |
| NM0005 | Nova Gerar landfill gas to energy project | Submission not approved | 11 Sep 03 |
| NM0004-rev | Salvador da Bahia landfill gas project | Submission approved | 12 Sep 03 |
| NM0004 | Salvador da Bahia landfill gas project | Submission not approved | 11 Sep 03 |
| NM0003 | Construction of new methanol production plant (called: M 5000) | Submission not approved | 12 Sep 03 |
| NM0002 | V & M do Brasil Fuel Switch project | Submission not approved | 11 Sep 03 |
| NM0001-rev | Vale do Rosario Bagasse Cogeneration (VRBC) project | Submission approved | 22 Sep 04 |
| NM0001 | Vale do Rosario Bagasse Cogeneration (VRBC) Project | Submission not approved | 10 Sep 03 |
| Methodology for Cremations using Cow Dung | Submission deemed unqualified. No further consideration | 08 Apr 20 | |
| Introduction of energy-saving wire or cable to new or existing power line | Submission deemed unqualified. No further consideration | 19 Feb 15 | |
| Destruction of HFC-134a of End of Life Vehicles (ELVs) refrigerant | Submission deemed unqualified. No further consideration | 07 Apr 11 | |
| Methodology for low voltage compensating system of submerged arc furnace | Submission deemed unqualified. No further consideration | 01 Apr 11 | |
| “The implementation of Solar Water Heaters (SWHs) with storage for warm water applications” | Submission deemed unqualified. No further consideration | 06 Oct 10 | |
| GHG reductions through replacement of desalination | Submission deemed unqualified. No further consideration | 09 Feb 11 | |
| N2O destruction in coal-fired circulating fluidized bed boiler for power generation plant | Submission deemed unqualified. No further consideration | 16 Sep 11 | |
| Methodology for projects that reduce the consumption of clinker and clinker-based cements through the manufacture and sale of green cements | Submission deemed unqualified. No further consideration | 07 Apr 11 |

Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: