15:06 10 Mar 22
Project:
7534 Korea South-East Power Co. Renewable Energy Bundling Project
- Request for post-registration changes
| Project | 7534 Korea South-East Power Co. Renewable Energy Bundling Project |
|---|---|
| PRC ref | PRC-7534-001 |
| Process track | Prior approval |
| DOE | KTR |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 01 Dec 12 - 30 Nov 22 |
| Assessment opinion |
Assessment opinion (223 KB)
|
| Revised PDD |
Revised PDD (4655 KB)
Revised PDD - track changes (5371 KB)
|
| Supplementary documents |
Appendix 1 - 1._ER_sheet_KOSEP.xlsx (23 KB)
|
| Signed form |
Signed form (81 KB)
|
| DOE clarification |
DOE clarification 1 - VVS_KOSEP-CDM_PDD_Ver_11.1_(clean).pdf (4641 KB)
DOE clarification 2 - VVS_KOSEP-CDM_PDD_Ver_11.1_(track_changed).pdf (5335 KB)
DOE clarification 3 - VR_revised ver3.0.pdf (208 KB)
DOE clarification 4 - Clarification letter_ktr.pdf (55 KB)
|
| VVS version | VVS 2.0 |
| Current status | 26 Mar 14 -
Approved
Effective approval date: 24 Mar 14
|
| Historic statuses |
21 Jan 14 -
Published 04 Feb 14 - Awaiting DOE clarifications 17 Feb 14 - DOE clarifications received 17 Feb 14 - Summary note being prepared 03 Mar 14 - Awaiting EB decision |

Assessment opinion
Appendix 1 - 1._ER_sheet_KOSEP.xlsx
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: