14:59 10 Mar 22
Project:
9003 LMEL 25 MW Waste Heat based Captive Power Plant.
- History
| Project | 9003: LMEL 25 MW Waste Heat based Captive Power Plant. |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 |
| Review documentation | |
| Clarification documents |
Response_to_Request_for_Review_-_LMEL (317 KB)
|
Data before review
| Amount of Reductions | 114,718 metric tonnes CO2 equivalent per annum |
|---|---|
| CDM-PDD |
project design document (787 KB)
PDD appendices Appendix 1 - Bench_Mark_(COE)_calculation-LMEL (635 KB)
Appendix 2 - CER_Calculation_-LMEL (173 KB)
Appendix 3 - LMEL_-Equity_IRR (258 KB)
Appendix 4 - Levelized_cost_-Coal_power_plant (218 KB)
|
| Validation Report |
Validation report (1426 KB)
|
Data before approval of the request for post-registration changes on 29 Mar 2016
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (730 KB)
PDD appendices Appendix 1 - CER_Calculation-Revised_as_per_ReqReview (41 KB)
|

Response_to_Request_for_Review_-_LMEL
Appendix 1 - Bench_Mark_(COE)_calculation-LMEL
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: