14:24 10 Mar 22
Project:
7359 PoA for the Reduction of emission from non-renewable fuel from cooking at household level
- Request for post-registration changes
| Project | 7359 PoA for the Reduction of emission from non-renewable fuel from cooking at household level |
|---|---|
| PRC ref | PRC-7359-002 |
| Process track | Prior approval |
| DOE | Carbon Check |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 30 Nov 12 - 29 Nov 19 |
| Assessment opinion |
Assessment opinion (1556 KB)
|
| Revised PDD |
Revised PDD (1093 KB)
Revised PDD - track changes (1257 KB)
|
| Supplementary documents |
Appendix 1 - CPA PDD Nigeria ver10 Clean.pdf (744 KB)
Appendix 2 - CPA PDD Nigeria ver10 with Track Changes.pdf (760 KB)
Appendix 3 - CPA PDD Malawi version 11 Clean.pdf (1021 KB)
Appendix 4 - CPA PDD Malawi version 11 with Track Changes.pdf (1032 KB)
Appendix 5 - CPA ER calculations NIGERIA 2.xlsx (105 KB)
Appendix 6 - CPA ER Calulations Malawi New.xlsx (86 KB)
|
| Signed form |
Signed form (2278 KB)
|
| DOE clarification |
DOE clarification 1 - 531_PoA PRC FVR_16082017_Clean.pdf (1879 KB)
DOE clarification 2 - 531_PoA PRC FVR_16082017_TC.pdf (1840 KB)
DOE clarification 3 - CPA PDD Malawi version 12_Clean.pdf (1021 KB)
DOE clarification 4 - CPA PDD Malawi version 12_TC.pdf (1035 KB)
DOE clarification 5 - CPA PDD Nigeria version 11_Clean.pdf (744 KB)
DOE clarification 6 - CPA PDD Nigeria version11_TC.pdf (764 KB)
DOE clarification 7 - POA PDD version 16_Clean.pdf (1089 KB)
DOE clarification 8 - POA PDD version 16_TC.pdf (1259 KB)
|
| VVS version | VVS 9.0 |
| Current status | 28 Sep 17 -
Rejected
Effective rejection date: 26 Sep 17.
Reason (225 KB)
|
| Historic statuses |
24 Jul 17 -
Published 04 Aug 17 - Awaiting DOE clarifications 18 Aug 17 - DOE clarifications received 18 Aug 17 - Summary note being prepared 06 Sep 17 - Awaiting EB decision |

Assessment opinion
Appendix 5 - CPA ER calculations NIGERIA 2.xlsx
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: