Info Report Check
Submission incomplete:
Scope: The verification and certification report does not state that the monitoring has been carried out in accordance with registered or the revised monitoring plan as per VVS version 09.0 paragraph 392.
Issue: The DOE is requested to explain how it concluded that all monitoring parameters have been measured / determined without material misstatements and in line with all applicable standards and relevant requirements, as there was no data for period of 06/03/2012 to 22/12/2016 and there was no PRC requested to address the deviation. Please refer to VVS version 09.0 paragraphs 389, 390, and section 9.2.