AM_CLA_0083: 1- For the renewal of a crediting period: Shall registered CDM projects be excluded in the construction of baseline scenarios? 2- In the case of expansion of an existing CDM project, which is the baseline to be considered?

Reference AM_CLA_0083
Submitted by DNV (27 Mar 08)
Request F-CDM-AM-Subm (618 KB)
Methodologies
Final response Final response (116 KB)
EB report EB 41 meeting report (132 KB)
Historic statusesNo status history available