Submission incomplete:
1: Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and emission reductions, including reference to formulae and methods used as per PS version 09.0 paragraph 253.
Issue: It was found in the raw data that there were 4 days in which wastewater was treated with effective COD removal (i.e.,05/01/2015, 30/03/15, 18/04/15 and 05/01/16). These days were also counted as operation days in the emission reduction calculation. However, the monitored data for biogas flow for these four days were reported to be zero.
2: Scope: The verification and certification report does not provide a conclusion on the verified amount of emission reductions achieved nor/or confirm that appropriate methods and formulae for calculating baseline emissions, project emissions and leakage have been followed as per VVS version 09.0 paragraphs 403 (c) and 409 (j).
Issue: the DOE was requested to explain how it had verified the emission reductions for the four days (i.e.,05/01/2015, 30/03/15, 18/04/15 and 05/01/16) for which the monitored biogas flow was reported to be zero.
1: Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and emission reductions, including reference to formulae and methods used as per PS version 09.0 paragraph 253.
Issue: It was found in the raw data that there were 4 days in which wastewater was treated with effective COD removal (i.e.,05/01/2015, 30/03/15, 18/04/15 and 05/01/16). These days were also counted as operation days in the emission reduction calculation. However, the monitored data for biogas flow for these four days were reported to be zero.
2: Scope: The verification and certification report does not provide a conclusion on the verified amount of emission reductions achieved nor/or confirm that appropriate methods and formulae for calculating baseline emissions, project emissions and leakage have been followed as per VVS version 09.0 paragraphs 403 (c) and 409 (j).
Issue: the DOE was requested to explain how it had verified the emission reductions for the four days (i.e.,05/01/2015, 30/03/15, 18/04/15 and 05/01/16) for which the monitored biogas flow was reported to be zero.