02:55 10 Mar 22
Project:
0391 Indur 7.5 MW Non-Conventional Renewable Sources Biomass Power Project
- Crediting Period Renewal Request
[]
| Project |
0391: Indur 7.5 MW Non-Conventional Renewable Sources Biomass Power Project
- project design document (619 KB)
PDD appendices Appendix 1 - 0391_renewal_excel sheet (387 KB)
- crediting period renewal form (356 KB)
|
|---|---|
| Methodologies Used |
AMS-I.D. ver. 15 -
Grid connected renewable electricity generation
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 37,314 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (548 KB)
|
| Renewal Date |
30 Apr 11
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
16 Feb 10 - 15 Feb 17
Other crediting period(s): 16 Feb 03 - 15 Feb 10 |
| Requests for Issuance
and related documentation |
Monitoring report: 16 Feb 2010 - 31 Mar 2011 (248 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 20130 Serial Range: Block start: IN-5-143072109-1-1-0-391 Block end: IN-5-143092238-1-1-0-391 [Full view and history] Monitoring report: 01 Apr 2011 - 31 Mar 2012 (288 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 30666 Serial Range: Block start: IN-5-167823304-1-1-0-391 Block end: IN-5-167853969-1-1-0-391 [Full view and history] |

project design document
Appendix 1 - 0391_renewal_excel sheet
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: