20:21 09 Mar 22
Project:
9062 Liaoning Guoli Fuxin Wangsiyingzi Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
9062: Liaoning Guoli Fuxin Wangsiyingzi Wind Power Project
- project design document (647 KB)
PDD appendices Appendix 1 - ER sheet (13 KB)
- crediting period renewal form (370 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 88,260 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (178 KB)
|
| Renewal Date | 26 Nov 20 (Renewable) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
01 Apr 20 - 31 Mar 27
Other crediting period(s): 01 Apr 13 - 31 Mar 20 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: