20:04 09 Mar 22
Project
3477 :
Shenzhen Dongbu LNG Power Generation Project
| Project title |
Shenzhen Dongbu LNG Power Generation Project
- project design document (905 KB)
PDD appendices Appendix 1 - ER Sheet 3477 (75 KB)
Appendix 2 - IRR Sheet 3477 (105 KB)
Appendix 3 - LEGC calculation (163 KB)
- registration request form (496 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (153 KB)
authorization (153 KB)
Authorized Participants: Shenzhen Energy Group Co., Ltd. |
| Other Parties Involved |
Spain
, involved indirectly
approval (1223 KB)
authorization (1223 KB)
Authorized Participants: Endesa Generación, S.A. (withdrawn) |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
AM0029 ver. 3 -
Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas
|
| Standardized baselines used | N/A |
| Amount of Reductions | 1,022,075 metric tonnes CO2 equivalent per annum |
| Fee level | USD 202915.0 |
| Validation Report |
Validation report (1481 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 16/04/2013 MoC Annex 2 (Withdraw Project Participant) valid as of 15/04/2013 |
| Registration Date | 02 Feb 11 (Date of registration action 06 Jun 11) (view history) |
| Crediting Period |
02 Feb 11 - 01 Feb 18
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER Sheet 3477
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: